Loading…
Loading…
Tender Value
₹8.5 Cr
EMD Value
₹12.7 L
Closing Date
6 Jun 2026, 9:31 pmDue tomorrow
Public Works Department
Improvement of road from Gumpa ring road junction to Mailoor ring road and from Mailoor ring road to Chidri ring road via Goyal layout in Bidar City, and Improvement and Resurfacing to road from Beti Circle to Central Bus Stand and from K.E.B. Main office to Reliance Petrol Pump and Construction of Road from Rotary Circle to Khandre Petrol Pump in Bidar City. 4059 CMIDP for the Year 2025-26
298806
PWD/2025-26/RD/WORK_INDENT33054
Open
Roads
PWD Division Office Bidar
6 documents required · 6 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-26 (b) satisfactorily completed as prime contractor, at least one similar work such as Improvements to BT road such as of value not less than Rs. 423.07 Lakhs
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-26 (c) executed in any one year, the following minimum quantities of work (1) EWE: 6942.00 cum (2) GSB: 1451.00 cum (3) WMM/WBM: 2030.00 cum (4) BM/SDBC: 3344.00 cum (5) RCC/PCC: 116.00 (6) Steel: 3.61 Tonn .
Each Tenderer should further demonstrate: ( As per Govt. Circular No. PWD 60 CRM 2021 Dt 08.11.2021)(a) Availability by owning the required / specified key and critical equipment for this work is 1) Hotmix Plant (minimum 40/60 TPH) - 1 No. (2) Static Road Roller: 1 No.(3) Vibratory Road Roller : 1 No (4) Mechanical Paver Finisher : 1 No (5) Tippers : 2 Nos And availability by lease / Hire basis for this work is (1) Tippers -2 No. (2) Excavator like JCB/Hitachi : 2 No.(3) Water Tanker : 2 No. (The relevant documents ownership / commitment /agreements etc. for availability for this work are furnished)
Each Tenderer should further demonstrate: ( As per Govt. Circular No. PWD 60 CRM 2021 Dt 08.11.2021)(a) Availability by owning the required / specified key and critical equipment for this work is 1) Hotmix Plant (minimum 40/60 TPH) - 1 No. (2) Static Road Roller: 1 No.(3) Vibratory Road Roller : 1 No (4) Mechanical Paver Finisher : 1 No (5) Tippers : 2 Nos And availability by lease / Hire basis for this work is (1) Tippers -2 No. (2) Excavator like JCB/Hitachi : 2 No.(3) Water Tanker : 2 No. (The relevant documents ownership / commitment /agreements etc. for availability for this work are furnished)
List of existing commitments and ongoing works
List of works for which tenders already submitted
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-26 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 1692.26 Lakhs Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluation
Liquid assets and/or availability of credit facilities of no less than Rs. 282.05 Lakhs Credit lines/letter of credit/ certificates from the banks for meeting the fund requirement etc
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details for reference
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
List of Financial Resources with Certificates
₹5,000
₹12.7 L
27 May 2026
27 May 2026
8 Jun 2026
5 Jun 2026
4 Jun 2026
Information on litigation in which the Tenderer is involved:
Other Party/Parties Employer Details of Dispute Amount involved Remarks showing Present Status
BANKER’S CERTIFICATE
This is to certify that M/s. ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely ……………………………… (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………… to meet the working capital requirements for executing the above contract
Name of the Bank, Senior Bank Manger
Address:…………………………
List of Machinery
Item of Equipment Requirement Owned/ Hired/Leased Owned/ Hired/Lease and available Remarks
No. Capacity Number/Capacity Age/ Condition
Information of the works for which Tenderer has submitted Tender.
Project Name Name & Address of the Employer Name of Work Amount put to Tender in Rs lac. Specified period of completion (including/excluding Monsoon Prescribed last date of submission of tender Probable date of decision on the Tender Remarks if any.
Information of the works for which Tender acceptance letters are received.
Project Name Name & Address of the Employer Name of Work Tendered Amount in Rs lac Specified period of completion (including/excluding Monsoon Probable Date of Handing over of site
Attach letters of Acceptance received.
Information on works which are yet to be completed.
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon cost of balance works remaining Rs. in lac Probable date of completion
Attach Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Monthly Physical and Financial Progress Achieved in all Contracts which are referred to in Format 3
Names of Works Item of Work Names of Employers 2008 Remarks (Indicate contract reference)
January February march April May June July August September October November December
Earthwork Physical
Stone/Brick masonry Physical
P.C.C. Physical
R.C.C. Physical
Steel Reinforcement Physical
Flooring. Physical
Plastering. Physical
Centering Physical
Tiles. Physical
Earthwork Physical
Stone/Brick masonry Physical
P.C.C. Physical
R.C.C. Physical
Steel Reinforcement Physical
Flooring. Physical
Plastering. Physical
Centering Physical
Tiles. Physical
Earthwork Physical
Stone/Brick masonry Physical
P.C.C. Physical
R.C.C. Physical
Steel Reinforcement Physical
Flooring. Physical
Plastering. Physical
Centering Physical
Tiles. Physical
Earthwork Physical
Stone/Brick masonry Physical
P.C.C. Physical
R.C.C. Physical
Steel Reinforcement Physical
Flooring. Physical
Plastering. Physical
Centering Physical
Tiles. Physical
Earthwork Physical
Stone/Brick masonry Physical
P.C.C. Physical
R.C.C. Physical
Steel Reinforcement Physical
Flooring. Physical
Plastering. Physical
Centering Physical
Tiles. Physical
Earthwork Physical
Stone/Brick masonry Physical
P.C.C. Physical
R.C.C. Physical
Steel Reinforcement Physical
Flooring. Physical
Plastering. Physical
Centering Physical
Tiles. Physical
FORMAT FOR WORK DONE CERTIFICATE TO BE OBTAINED FROM COMPETENT AUTHORITY
has executed/ is executing(strike off which ever is not applicable) the work of .............................................
in this Organisation. The details of the work is as under:
1 Name of the Project :
2 Name of the Work :
3 Contract Amount :
4 Date of signing the Agreement :
5 Date of handing over of the Site :
6 Progress * : 2008
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Stone/Brick masonry Physical in cum :
Financial in lac :
P.C.C. Physical in sqm :
Financial in lac :
R.C.C. Physical in cum :
Financial in lac :
Steel Reinforcement Physical in qtl/MT :
Financial in lac :
Flooring. Physical in sqm :
Financial in lac :
Plastering. Physical in sqm
Financial in lac
Centering Physical in sqm
Financial in lac
Tiles. Physical in sqm
Financial in lac
Progress * : 2009
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Stone/Brick masonry Physical in cum :
Financial in lac :
P.C.C. Physical in sqm :
Financial in lac :
R.C.C. Physical in cum :
Financial in lac :
Steel Reinforcement Physical is cum/sqm :
Financial in lac :
Flooring. Physical in sqm :
Financial in lac :
Plastering. Physical in sqm
Financial in lac
Centering Physical in sqm
Financial in lac
Tiles. Physical in sqm
Financial in lac
Progress * : 2010
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Stone/Brick masonry Physical in cum :
Financial in lac :
P.C.C. Physical in sqm :
Financial in lac :
R.C.C. Physical in cum :
Financial in lac :
Steel Reinforcement Physical is cum/sqm :
Financial in lac :
Flooring. Physical in sqm :
Financial in lac :
Plastering. Physical in sqm
Financial in lac
Centering Physical in sqm
Financial in lac
Tiles. Physical in sqm
Financial in lac
Progress * : 2011
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Stone/Brick masonry Physical in cum :
Financial in lac :
P.C.C. Physical in sqm :
Financial in lac :
R.C.C. Physical in cum :
Financial in lac :
Steel Reinforcement Physical is cum/sqm :
Financial in lac :
Flooring. Physical in sqm :
Financial in lac :
Plastering. Physical in sqm
Financial in lac
Centering Physical in sqm
Financial in lac
Tiles. Physical in sqm
Financial in lac
Progress * : 2012
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Stone/Brick masonry Physical in cum :
Financial in lac :
P.C.C. Physical in sqm :
Financial in lac :
R.C.C. Physical in cum :
Financial in lac :
Steel Reinforcement Physical is cum/sqm :
Financial in lac :
Flooring. Physical in sqm :
Financial in lac :
Plastering. Physical in sqm
Financial in lac
Centering Physical in sqm
Financial in lac
Tiles. Physical in sqm
Financial in lac
Progress * : 2013
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Stone/Brick masonry Physical in cum :
Financial in lac :
P.C.C. Physical in sqm :
Financial in lac :
R.C.C. Physical in cum :
Financial in lac :
Steel Reinforcement Physical is cum/sqm :
Financial in lac :
Flooring. Physical in sqm :
Financial in lac :
Plastering. Physical in sqm
Financial in lac
Centering Physical in sqm
Financial in lac
Tiles. Physical in sqm
Financial in lac
7 Stipulated Period of Completion (including monsoon)
8 Prescribed Date of completion
9 Actual Date of Completion/ Probable Date of Completion
10 Cost of balance work (if work is in progress) :
11 Reasons if any for delay in completion, if work completion is delayed :
12 Penalty if any imposed :
13 Any other information :
* Monthwise progress shall be furnished seperately.
Date: (Authorised Signatory)
Address for correspondence:
Work executed as prime contractor (in the same name) on works of similar nature during the five years specified)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon Actual date of completion Remarks (appreciation letter received for early completion or reasons, if there is delay in completion)
Attach Workdone Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Financial Year Total value of Civil Engineering works executed and payments received in the last five years (in Rs. lac)
Billed upto date during 2025-26
Attach Chartered Accountant's Yearwise Statements.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Guidelines-KW-4_RD_33054.docx
Instructions to Tenderers • 0.02 MB
eproc formats 1-10.xls
Instructions to Tenderers • 0.13 MB
bid doc_kw_4_RD_33054.doc
Tender Document • 1.08 MB
Download all tender documents and submit your bid