Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC NEAR TELEPHONE EXCHANGE TALLI BAZAR KAPKOTE BAZAR BAGESHWAR DISTRICT BAGESHWAR KAPKOTE BAGESHWAR PIN 263632 | BAGESHWAR | UTTARAKHAND | 263632 | ₹7.1 L | L1 | Accepted-AOC LOWEST BID VALUE AMONG OTHER |
| 2 | L2₹7.2 L+₹17,036.10 (2.42%)Rejected-AOC GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | ₹7.2 L+₹17,036.10 (2.42%) | L2 | Rejected-AOC NOT LOWEST |
| 3 | L3₹7.4 L+₹35,923.94 (5.09%)Rejected-AOC 05 DEEPAK KUMAR PUJA KUNJ BAGAN PARA GAMHARIYA STATION ROAD BAGAN PARA EAST SINGHBHUM JHARKHAND 832106 | EAST SINGHBUM | JHARKHAND | 832106 | ₹7.4 L+₹35,923.94 (5.09%) | L3 | Rejected-AOC NOT LOWEST |
Tender Value
₹7.1 L
EMD Value
₹28,000
Closing Date
12 Dec 2022, 3:00 pmClosed
EXECUTIVE ENGINEER
EDD BAGESHWAR
SHIFTING OF 33 KV LINE NERA VILLAGE DEWALCHAURA KAPKOTE BAGESHWAR UNDER CM DECLARATION
2022_UPCL9_51962_1
48/2022-23
Open Tender
Electrical Works
Item Rate
90 days
KAPKOTE
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹590
EXECUTIVE ENGINEER
₹28,000
6 Jun 2023
23 Nov 2022
13 Dec 2022
23 Nov 2022
12 Dec 2022
23 Nov 2022
Amount
Supply Items
Holding Clamp for SP-33 Pole with N&B
Breasing Top Clamp for SP-33 Pole with N&B
Breasing Bottom Clamp of SP-33 Pole with N&B
Stay Clamp SE SP-33 Pole with N&B
Stay Clamp DE SP-33 Pole with N&B
E- Clamp for 33 Kv Pin with N&B
Earth Wire Clamp for SP-33 Pole with N&B
PG Clamp Dog to Dog
Danger Board with Clamp
Barbed Wire
Stone Pad 300x300x75 mm
Work Items
Cartage of ST Pole 9.0 mtr SP-33 from store centre Almora to construction site with loading, unloading at both points and proper stacking in average distance 170 Km.
Cartage of other material (other than poles) by vehicle from store centre Almora to nearest construction site store including loading & unloading at both ends.
Head load cartage of ST Pole 9.0 mtr SP-33 from road to construction site upto 1.0 to 3.0 Km.
Head load cartage of small material including loading & unloading upto 1.0 to 3.0 Km.
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including proper dressing of sides and ramming of bottom icluding getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
Errection of single support pole ST Pole 9.0 mtr SP-33 in proper level and alignment alongwith fixing of all accessories loke top channel & clamps as per RESPO manual.
Errection of double support pole ST Pole 9.0 mtr SP-33 in proper level and alignment alongwith fixing of all accessories like top channel, X- Breasing & Clamps as per RESPO construction manual.
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1:4:8 (1 cement : 4 graded stone 20 mm nominal size : 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment , leveling as per RESPO construction manual.
Excavation of foundation pit for ST Pole 9.0 mtr SP-33 Single Pole errection of pole in all type of soil and fixing of all accessories of pole and errection of support and grouting of pole in CC ratio 1:4:8 block including cost of ballast, cement and sand, back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO.
Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc.
Fabrication of MS channel angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, breasing as per RESPO.
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
Fixing, tightening and nozzelling of 33 Kv Line stay with pole and stay rod on required tension as per drawing / RESPO manual.
Grouting of stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20 mm nominal size : 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment , leveling as per RESPO manual.
Earthing of support with MS earth rod of 2.5 mtr long by hammaring of MS rod to proper depth and connecting the earth electrode with the help of G.I wire as per construction manual.
Laying, spreading, stringing and sagging of 33 Kv line in 3 phase (3 phase 4 wire) of the following wire as phase wire with G.I earth wire complete including fixing of all accessories in 03 nos conductor in parallel with binding and jumpering as per profile and sagging chart. (ACSR Dog Conductor 3 Phase 4 Wire)
Painting of poles ST Pole 9.0 mtr SP-33 with angle and channel and all steel part by one coat of red oxide primer and two coats of aluminium paint and two strip of fluorescent alternate red and white paint 30 cm wide upto 1.5 mtrs from ground level.
Dismentalling of existing HT line including disc fitting, insulator, clamps, nut & bolts etc. including rolling of conductor and cartage back from site to JE store. (Single Pole ST Pole 9.0 mtr SP-33)
Dismentalling of existing HT line including disc fitting, insulator, clamps, nut & bolts etc. including rolling of conductor and cartage back from site to JE store. (Double Pole ST Pole 9.0 mtr SP-33)
Route clearance by cutting of tree branches / proning, lopping and chopping of trees for 33 Kv line.
T- off connection complete 33 Kv line.
Back head load cartage of ST Pole 9.0 mtr SP-33 from constrution site to road site upto 0 to 1.0 Km.
Head load cartage of small material including loading & unloading upto 0 to 1.0 Km.
Cartage of ST Pole 9.0 mtr SP-33 from road site to 33/11 Kv, S/s, Kapkote JE store with loading, unloading at both points and proper stacking in average distance 20 Km.
Cartage of other material (other than poles) by vehicle from road site to 33/11 Kv, S/s, Kapkote JE store including loading & unloading at both ends.
maa bhagwati electricals
DEEPAK CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .