Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹25.6 L+₹2.0 L (8.44%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹39.2 L+₹15.6 L (66.3%)Accepted-Finance DOOR NO 7 472 COCHIN KOCHANGHADI ROAD COCHIN 682002 MATTANCHERRY ERNAKULAM CITY KERALA 682002 | ERNAKULAM | KERALA | 682002 | L3 | Accepted-Finance Accepted |
Tender Value
Refer Docs
Closing Date
20 Aug 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
JOBS ON MAIN ENGINE FOR M V VISHVA VINAY
2022_CSL_125428_1
SR1/726A31649/GePNIC/004
Open Tender
Miscellaneous Services
Lump-sum
15 days
Cochin
Please refer tender documents
2 documents required · 2 mandatory
₹0
Exempted
3 Sept 2022
11 Aug 2022
22 Aug 2022
11 Aug 2022
20 Aug 2022
11 Aug 2022
11 Aug 2022 - 19 Aug 2022
Amount
E22011 ITEM: MAIN ENGINE (SURVEY) TYPE / CAPACITY / DETAILS: STX(DALIAN)-MAN B&W 7S50MC-C8 TII POWER=11060 KW * 127 RPM
MAIN ENGINE UNIT DECARBONISATION TO BE CARRIED OUT AS PER FOLLOWING JOB SCOPE. ALL WORK TO BE CARRIED OUT STRICTLY AS PER THE MAKER’S MAINTENANCE INSTRUCTIONS TAKING ALL SAFETY PRECAUTIONS. ALL SPARES AND TOOLS (SHIP’S SUPPLY). YARD TO ARRANGE SURVEYORS AS & WHEN REQUIRED. ALL NECESSARY PARTS TO BE SHOWN TO SURVEYORS FOR THEIR APPROVAL. ISOLATE ALL SEVEN UNITS DRAIN COOLING WATER FUEL OIL ETC. REMOVE ALL NECESSARY CYLINDER HEAD CONNECTIONS REMOVE CYLINDER HEADS WITH EXHAUST VALVES AND TRANSPORT SAME TO YARD WORKSHOP.
IN YARDS WORKSHOP DISCONNECT AND REMOVE ALL CYLINDER HEAD MOUNTINGS. DISMANTLE CYLINDER HEADS AND SEPARATE THEM FROM COOLING JACKETS. THROUGHLY CLEAN CYLINDER HEADS AND COOLING JACKET SURFACES. RENEW ALL “O” RINGS AND ASSEMBLE CYLINDER HEADS AND COOLING JACKETS. CYLINDER HEAD COOLING SURFACES TO BE PRESSURE TESTED TO 06 KGS / CM2 AND SHOWN TO 2EO & CEO.ALL CYLINDER HEAD MOUNTINGS POCKETS AND SEATS TO BE THOROUGHLY CLEANED AND SEATS TO BE LAPPED. FUEL VALVE NOZZLE AREA TO BE CHECKED FOR CORROSION ATTACK AND IF SAME EXCEEDS DEPTH OF 8 MMS THEN RECONDITIONING TO BE DONE AS PER MAKER’S INSTRUCTIONS. CYLINDER AIR STARTING V/VS, FUEL V/VS AND INDICATOR VALVES TO BE O’HAULED AND TESTED TO PROVE SATISFACTORY OPERATION AND SHOWN TO 2EO / CEO. CYLINDER HEAD RELIEF V/VS TO BE PRESSURE TESTED TO CORRECT OPENING PRESSURE & SHOWN TO 2E/O &CEO. INDICATOR V/VS LEAK TEST TO BE SHOWN TO 2EO / CEO. AFTER THE APPROVAL OF SURVEYORS & SUPTD ALL THE MOUNTINGS TO BE ASSEMBLED & FITTED BACK IN PLACE AS THE ORIGINAL.
DISMANTLE THE EXHAUST V/VS COMPLETELY. THOROUGHLY CLEAN ALL PARTS & SHOWN TO SURVEYORS &SUPTD. RENEW ALL WORN / DEFECTIVE PARTS AS REQUIRED & ALL SEAL RINGS FROM SHIP’S SPARES. CHECK THE VALVE & SEATS & IF REQUIRED GROUND THE VALVES & SEATS AS PER MAKER’S INSTRUCTIONS. THOROUGHLY CLEAN EXHAUST V/VS COOLING WATER SURFACES. ASSEMBLE THE EXHAUST VALVES AS THE ORIGINAL AND FIT THE EXHAUST VALVES IN PLACE ON CYLINDER HEADS. ALL CYLINDER HEAD ASSSEMBLIES TO BE TRANSPORTED BACK ONBOARD.
ALL LINER SURFACES & SCAVENGE PORTS TO BE THROUGHLY CLEANED. L.O. QUILL PASSAGES TO BE THROUGHLY BLOWN THROUGH WITH COMPRESSED AIR & CLEARED. LINERS TO BE CALIBRATED AND READINGS TO BE RECORDED. CARRY OUT DYE CHECK ON ALL CYLINDER LINERS IN WAY OF TOP AND BOTTOM L.O. GROOVES FOR DETECTING CRACKS IF ANY & SHOWN TO SURVEYORS & SUPDT. LINER PORT EDGES TO BE SMOOTHENED IF REQUIRED. LUBRICATORS TO BE OVERHAULED.
PISTON HOLDING NUTS TO BE OPENED. LINER TOP RIDGES TO CLEAN AND GRIND. PISTON TO BE WITHDRAWN ALONG WITH STUFFING BOXES AND SHIFTED/TRANSPORTED TO SHOP.PISTON RING & STUFFING BOX TO BE REMOVED. STUFFING BOX TO BE DISMANTLED CLEANED INSPECTED AND ASSEMBLED WITH NEW SPARE SHIP SUPPLY CHECK THE PISTON CROWN WEAR DOWN BY WEARDOWN GAUGE. PISTON RING GROOVES TO BE THOROUGHLY CLEANED. GROOVES & PISTON RINGS TO BE CALIBRATED & READINGS TO BE RECORDED AND SHOWN TO CEO/SUPDT.IF PISTON RING GROOVE FOUND ENLARGED SAME TO BE RECONDITIONED.ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD & AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD/CEO. PISTON ROD TO BE GAUGED. PISTONS TO BE ASSEMBLED WITH NEW PISTON RINGS. PISTON ROD STUFFING BOX ALL PARTS TO BE THOROUGHLY CLEANED. STUFFING BOX CALIBRATIONS TO CHECK AND RECORD THE READINGS. ALL WORNOUT / DAMAGED PARTS TO BE RENEWED FROM SHIP’S SPARES. STUFFING BOXES TO BE ASSEMBLED ON PISTON RODS USING NEW SEAL RINGS SCRAPER RINGS & SPRINGS. PISTON RODS ALONG WITH STUFFING BOXES TO BE TRANSPORTED BACK ONBOARD. CROSS HEAD SURFACES TO BE CLEANED THOROUGHLY. LOWER THE PISTONS IN PLACE ALONG WITH THE STUFFING BOXES AND TIGHTEN THE NUTS AS PER MAKER’S INSTRUCTIONS.STUFFING BOX BOLTS TO BE TIGHTENED. ALL LASHINGS / LOCKINGS TO BE RESTORED. LOWER THE CYLINDER HEADS ALONG WITH EXHAUST V/VS AND TIGHTEN THE NUTS. ALL CYLINDER HEAD CONNECTIONS TO BE RESTORED BACK AS THE ORIGINAL. C.W. TO BE TRIED OUT AND ENSURE NO LEAKAGES. F.O. & L.O. TO BE TRIED OUT. F.O. LINES TO BE PRIMED. ALL LAGGINGS TO BE FIT BACK TO ITS ORIGINAL POSITION AND SECURE. C / CASE TO BE THOROUGHLY CLEANED & INSPECTED. C/CASE DOORS TO BE BOXED BACK AS THE ORIGINAL. SATISFACTORY MAIN ENGINE RUNNING TRIAL (BASIN TRIALS) TO BE GIVEN. MAIN ENGINE SEA TRIALS FOR ABOUT 4-6 HOURS ALSO TO BE GIVEN.
DISMANTLE PISTON ALL PARTS TO BE THOROUGHLY CLEANED AND EXAMINED. D.P. TESTS TO BE CARRIED OUT ON PISTON CROWNS AND PISTON SKIRTS AND CHECKED FOR FRETTING AND CRACKS AS PER MAKER’S INSTRUCTIONS. ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD & AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD.
SCAVENGE RELEIF DEVICES CRANKCASE DOORS AND RELIEF DEVICES TOOVERHAUL AND TO BE SHOWN TO THE CLASS SURVEYOR
CHAIN TENSIONING TO BE CHECKED & ADJUSTED FOR VIBRATION DAMPERS AND PUT UP FOR SHOWN TO SURVEYOR. UP TO SURVEYOR SATISFACTION UNDER CSM SURVEY. ALSO REVERSING RUBBERS TO BE CHECKED AND REPLACED IF NESESSARY.
CYLINDER COVERS COMBUSTION SPACES TO CHECK FOR CRACKS WITH D.P. TEST
LINER WITHDRAWAL & REFITTING PER UNIT
E22011 ITEM: MAIN ENGINE (SURVEY) TYPE / CAPACITY / DETAILS: STX(DALIAN)-MAN B&W 7S50MC-C8 TII POWER=11060 KW * 127 RPM
ALL INLET AND OUTLET CONNECTIONS TO BE REMOVED AND FUEL P/P BLOCKS TO BE TAKEN OUT FROM PLACE TRANSPORTED TO YARD'S WORKSHOP. PUMPS TO BE COMPLETELY DISMANTLED FOR INSPECTION PARTS TO BE CLEANED AND MADE READY FOR SURVEY.ALL UNIT PLUNGER BARREL TO OVERHAULED AND SEALING RING TO BE RENEWED.SEALING RING IN BARREL TO BE RENEWED.
PUNCTURE VALVE AND SUCTION VALVE TO BE OVERHAULED
VIT GEAR TO BE CHECKED AND OVERHAUL AND ADJUSTED
FUEL CAM TO BE CHECKED AND LEAD TO BE MEASURED
E22014 ITEM: MAIN ENGINE MAIN BEARINGS AND THRUST BEARING - TYPE / CAPACITY / DETAILS: STX (DALIAN)-MAN 7S50MC-C8 TII POWER= 11060 KW
CHECK AND RECORD BEARING CLEARANCES AND BRIDGE GAUGE READINGS BEFORE AND AFTER INSPECTION DISMANTLE BEARING AS PER MAKER INSTRUCTION ALL PARTS TO CLEAN AND SHOW IT TO SURVEYOR JOURNAL TO POLISH PRIOR BOXING UP DYE PNETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK WITH OLD/NEW SHELL SATISFACTORY RUNNING TRIAL TO GIVE BRG TEMP TO BE MONITORED AND RECORDED DURING RUNNING TRIAL. QUOTE PER BEARING NOS OF BEARING TO BE OPENED ON OWNER DECESION CAUTION: TWO NEIGHBOURING LOWER BRG SHELLS MUST NEVER BE TURNED OUT AT THE SAME TIME.
THRUST BEARING TO BE OPENED.AHEAD AND ASTERN THRUST PAD TO BE TAKEN OUT FOR INSPECTION AND CSM SURVEY. SAME TO BE PUT BACK AFTER SURVEY.JOB HAS TO BE DONE AS PER MAKER INSTRUCTION BOOK.
E22015 ITEM: MAIN ENGINE CRANK PIN BEARINGS TYPE / CAPACITY / DETAILS: STX (DALIAN)-MAN 7S50MC-C8 TII POWER= 11060 KW
CHECK AND RECORD BRG CLEARANCES BEFORE AND AFTER INSPECTION LOWER THE BOTTOM HALVES IN THE CRANKCASE LOCK X-HEAD ON TO GUIDES SUPPORT AND SWING OUT CONNECTING RODS FOR INSPECTING UPPER BRG HALVES.CLEAN ALL PARTS AND PRESENT TO CLASS SURVEYOR.DYE PENETRANT TEST TO BE CARRIED OUT.AFTER SUCCESSFUL COMPLETION OF SURVEY BRGS TO BE BOXED BACK AS ORIGINAL.SATISFACTORY RUNNING TRIAL TO BE GIVEN DURING SEA TRIAL. BEARING TEMPERATURE TO BE MONITORED.
BEARING SHELLS TO BE RENEWED QUOTE PER PIECE QUANTITY ON OWNER REQUIREMENT
E22016 ITEM: MAIN ENGINE CROSS HEAD BEARINGS. TYPE / CAPACITY / DETAILS: STX (DALIAN)-MAN 7S50MC-C8 TII POWER= 11060 KW
ME CROSS HEAD BRG TO BE OPENED UP FOR SURVEY. FOLLOWING JOBS TO BE CARRIED OUT AS PER MAKER'S INSTRUCTIONS.QUOTE FOR PER UNIT. NO OF UNIT WILL BE DECIDED AS PER SURVEYOR ADVICE CHECK AND RECORD CROSSHEAD BRGS AND GUIDESHOE CLEARANCES BEFORE OPENING THE XHD BEARING AND AFTER ASSEMBLY OF XHD BRGS. DISMANTLE BRG AS PER MAKER'S INSTRUCTION.BOTH TOP AND BOTTOM BEARING TO BE TAKEN OUT. ALL PARTS TO BE CLEANED.BOTH TOP AND BOTTOM BRG SHELLS AND CROSSHEAD PINS TO BE EXAMINED. CROSSEHAD PIN TO CALIBRATE AND READINGS TO RECORD.DYE PENETRANT TEST TO BE CARRIED OUT TO IDENTIFY ANY CRACK IF ANY.CLEAN ALL PARTS AND PRESENT TO CLASS SURVEYOR AND AFTER SUCCESSFUL COMPLETION OF SURVEY BRGS TO BE BOXED BACK AS ORIGINAL
TO MEASURE CLEARANCE BETWEEN ALL RECIPROCATING PARTS: 1. CENTERING OF THE LINER 2. CLEARANCE BETWEEN GUIDE STRIP AND XHD 3. CLEARANCE BETWEEN GUIDE SHOE AND XHD
E22018 ITEM: MAIN ENGINE AIR COOLER TYPE / CAPACITY / DETAILS: STX (DALIAN)-MAN 7S50MC-C8 TII POWER= 11060 KW
AIR COOLER ONE NO. TO BE REMOVED FROM PLACE AFTER REMOVING ALL CONNECTIONS & TRANSPORTED TO YARD'S WORKSHOP.COOLER TO BE DISMANTLED AND ELEMENT TO BE CLEANED CHEMICALLY. (BOTH AIR AND WATER SIDE) COOLER END COVER ZINC ANODE TO RENEW AND COVERS TO BE PAINTED WITH HEAT RESISTANCE PAINT (YARD SUPPLY) ALL NOZZLE TO BE CLEANED.COOLER TO BE BOXED BACK AFTER CLEANING. PRESSURE TESTING TO BE DONE AT 5 KG/CM2 IN THE PRESENCE OF SURVEYOR AND SHIP SUP/CEO.AFTER COMPLETION OF SURVEY COOLER TO BE FITTED BACK IN PLACE WITH NEW GASKET (YARD SUPPLY) & TESTED
QUOTE FOR PLUGGING OF 10 TUBES IN CASE COOLER TUBE LEAKS DURING PRESSURE TESTING.
E22020 ITEM: PRE-TENSIONING STAY BOLTS TIE BOLTS FOR MAIN ENGINE (SURVEY) TYPE / CAPACITY / DETAILS: STX (DALIAN)-MAN 7S50MC-C8 TII POWER= 11060 KW
VENDOR TO SUPPLY ONE PNEUMATIC HYDRAULIC P/P (1500 BAR) ALONG WITH NECESSARY CONNECTIONS FOR REQUIRED MAIN ENGINE JOB
28 NOS. TIE BOLTS TO BE CHECKED FOR PRETENSION. HYDRAULIC DISMANTLING PRESSURE 1500 BAR (TO CONFIRM). STAY BOLTS TO BE RETIGHTENED IN PAIRS WORKING FROM THE MIDDLE TOWARDS ONE END AND THEN AGAIN FROM THE MIDDLE TOWARDS THE OTHER END.HYDRAULIC PRESSURE TO BE MAINTAINED AT D1 AND STAY BOLT NUTS RETIGHTENED WITH A TOMMY BAR MAKING SURE NUTS BEARING AGAINST CONTACT FACE WITH A FEELER GUAGE. AFTER COMPLETING ALL BOLTS, THE FIRST PAIR OF STAY BOLTS TO BE TIGHTENED TO 10% BELOW D1 AND NUT TO BE CHECKED FOR LOOSENESS. IF FOUND LOOSE ALL STAY BOLTS TO BE TIGHTENED ONCE AGAIN. IF NOT LOOSE THE FIRST PAIR TO BE TIGHTENED TO D1 .
E22021: RE-TIGHTENING OF HOLDING DOWN BOLTS & END CHOCKS FOR MAIN ENGINE TYPE / CAPACITY / DETAILS: STX (DALIAN)-MAN 7S50MC-C8 TII POWER= 11060 KW
HOLDING DOWN BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH HOLDING DOWN BOLTS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. TIGHTENING PRESSURE – TO CONFIRM
END CHOCK BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH EPOXY CHOCKS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. TIGHTENING PRESSURE – TO CONFIRM.
END CHOCK BOLTS TIGHTNESS TO BE CHECKED USING HYDRAULIC JACK MARKED WITH END CHOCKS AND RECORDED. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENING PRESSURE THEREAFTER. TIGHTENIG PRESSURE – TO CONFIRM. WARNING: ACCIDENTAL APPLICATION OF LARGER JACK (MEANT FOR THE END CHOCK BOLTS) ON THE HOLDING DOWN BOLTS WOULD CAUSE SERIOUS OVER-STRESSING OF EPOXY SUPPORTING CHOCKS.
IMMEDIATELY AFTER FINISHING OF CHECKING OF THE LOOSENING PRESSURES OF THE HOLDING DOWN BOLTS AND THE RETIGHTENING OF THE HEIGHT OF THE EPOXY SUPPORTING CHOCKS ARE TO BE CHECKED.
M/E 02 NOS HYDRAULIC BRACINGS. TO CHECK SYSTEM THOROUGHLY & RECTIFY. RECHARGE IF ANY.
E22022 ITEM: MAIN ENGINE CRANKCASE & SUMP TYPE / CAPACITY / DETAILS: STX (DALIAN)-MAN 7S50MC-C8 TII POWER= 11060 KW
INSPECTION OF CRANKCASE DRAIN TANK STRUCTURE TO BE CARRIED OUT IF ANY CRACK FOUND IN THE STRUCTURE IN BETWEEN COFFERDAM AND DRAIN TANK SAME TO BE WELDED / REPAIRED AFTER OBTAINING NECESSARY HOTWORK PERMIT.
MANHOLES FOR THE SUMP ENTRY TO BE OPENED AND BOXED BACK AFTER THE WORK.
MAIN ENGINE LO SUMP DIAPHRAGMS TO RENEW. DIAPHRAGM YARD SUPPLY.
INDAUST MARITIME PVT LTD
COCHIN MARINE ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .