| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance | ₹4.4 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SEABLUE SHIPYARD LTD L1 |
|---|---|---|---|---|
| 1.00SUMMARY OF QUOTATION | ||||
| 1.01 | Services
Total Cost of Dry dock hire charges and other Admin & general services quoted in the BoQ | 1 | Nos | 72,86,600.3 ₹72,86,600.3 Lowest |
| 1.02 | Cost of repair part :-
(a) Total cost of Hull work Package | 1 | Nos | 1,48,71,140.5 ₹1,48,71,140.5 Lowest |
| 1.03 | (b) Total cost odf Engineering Work Package | 1 | Nos | 1,03,06,943.68 ₹1,03,06,943.68 Lowest |
| 1.04 | (c ) Total cost of Electrical work Package | 1 | Nos | 39,66,042.12 ₹39,66,042.12 Lowest |
| 1.05 | GST on serial 1.01 to 1.04 | 1 | Nos | 18,21,536.33 ₹18,21,536.33 Lowest |
| 1.06 | Total Budgeary Cost of Spares | 1 | Nos | 53,62,898.8 ₹53,62,898.8 Lowest |
| 1.07 | GST applicable for 1.06 | 1 | Nos | 2,68,144.94 ₹2,68,144.94 Lowest |
| 1.08 | Any other taxes & Duties | 1 | Nos | - |
| 1.09 | Miscellaneous (not included in any of the serial above) | 1 | Nos | - |
Tender Value
Refer Docs
EMD Value
₹16 L
Closing Date
30 Aug 2025, 4:00 pmClosed
The Admiral Superintendent
Naval ship Repair Yard Naval Base Kochi
DRY DOCKING AND ALLIED REPAIRS OF WB AMBUDA SR 25
2025_NAVY_724820_1
PP/08/3480/AMBUDA/SR/25
Limited
Marine Services
Item Rate
60 days
NSRY Kochi
Shipyard must have own dry dock ship lift facility capable to undertake offloaded Sow as per RFP of Ambuda in geographical vicinity of NSRY Kochi. No sub contracting. Should have successfully undertaken 3 refits of IN CG Ships without CD in 3 years
9 documents required · 9 mandatory
₹0
₹16 L
Yes
NSRY Kochi
17 Oct 2025
6 Aug 2025
1 Sept 2025
6 Aug 2025
30 Aug 2025
25 Aug 2025
7 Aug 2025 - 11 Aug 2025
14 Aug 2025
Amount
SUMMARY OF QUOTATION
Services Total Cost of Dry dock hire charges and other Admin & general services quoted in the BoQ
Cost of repair part :- (a) Total cost of Hull work Package
(b) Total cost odf Engineering Work Package
(c ) Total cost of Electrical work Package
GST on serial 1.01 to 1.04
Total Budgeary Cost of Spares
GST applicable for 1.06
Any other taxes & Duties
Miscellaneous (not included in any of the serial above)
GST if any on serial 1.09
Description of Work / Item(s)
Amount
INSTRUCTIONS TO SHIPYARDS
INSTRUCTIONS TO SHIPYARDS:- (A)SHIPYARD TO QUOTE FOR ALL SERIALS. BULK/ LUMPSUM COSTING IS NOT ALLOWED. ALL PAYMENTS WILL BE ON ACTUALS. (B)ALL SPARES ARE TO BE SOURCED THROUGH OEM AND OEM SUPERVISION IS TO BE ENSURED FOR ROUTINE/REPAIRS OF ALL EQUIPMENT. (C)IF SHIP REFIT AT SHIPYARD CONTINUES BEYOND 60 DAYS FOR ANY REASON INCLUDING FORCE MAJEURE, ALL ADMIN/GENERAL SERVICES ARE TO BE EXTENDED WITHOUT ADDITIONAL COST.
(D)SHIPYARD TO SUBMIT QAP AND QIP WITH THE BID (E)A DETAILED PERT /GANTT CHART TO BE SUMITTED TO NSRY AND SHIP (IN HARD AND SOFT MEDIA) ON TWO WEEKS PRIOR COMMENCEMENT OF REFIT. THE PERT/GANT CHART TO BE UPDATED TWICE EVERY MONTH IN LINE WITH THE PROGRESS OF REFIT.
GENERAL SERVICES
PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY A REGISTERED THIRD PARTY INSPECTING AGENCIES EX - LRS, IRS, ABS ETC AS REQUIRED.
ONLINE MONITORING OF REFIT AND PERT CARDINALS TO BE ENABLED WITH PRIMAVERA P6 WITH SHIPYARD REPS, NSRY(K) REPS AND SHIP STAFF AS USERS
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I, CENTER LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
DOCKING AND UNDOCKING OF THE VESSEL IN VERSION-I. (DURATION 30 DAYS). SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT
DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
SUBSEQUENT DAYS IN DOCK.
ASSISTANCE FOR DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
ARRANGE PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY.QUOTE UNIT RATE PER DAY
MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION ESTIMATED FOR 4 OPERATION
PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 6M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. DREDGING AS REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REFIT AT SHIPYARD'S COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 45 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT INCLUDING NECESSARY CONNECTION / DISCONNECTION (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 1000 KWH/DAY PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARDS TO INSTALL POWER . SHIP SHOULD BE EARTHED AT 04 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARD METER/ENERGY METER IN SUPPLY LINE
PROVIDE 02 SEA WATER FIRE MAINS WITH 06 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES, MANIFOLDS AND INCLUDE NECESSARY CONNECTION / DISCONNECTION. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBERATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED ON START OF REFIT
SHIPYARD TO PROVIDE 02 PORTABLE AC UNITS WITH AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES (MINIMUM)TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT AT ACTUALS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE PROVIDED FOR COMPLETE REFIT DURATION
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY FROM SHIP PAYMENT AT ACTUALS
PROVIDE CRANE 5 TON CAPACITY DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY) PAYMENT AT ACTUALS
PROVIDE SERVICES OF ONE LISTER DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT AT ACTUALS
PROVIDE SERVICES OF ONE FORK-LIFT DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY) PAYMENT AT ACTUALS
SHIPYARD TO ARRANGE FOR DEFUELLING OF SHIP PRIOR TO COMMENCEMENT OF REFIT.
CLEANING OF ALL TANKS, VENTILLATION AND OBTAINING GAS FREE CERTIFICATE IS THE RESPONSIBILITY OF SHIPYARD.
SHIP YARD HAS TO STORE THE DEFUELLED LSHFHSD AND AVCAT IN SUITABLE PLACE AND REFUEL THE SAME BACK TO SHIP AT END OF REFIT AFTER GETTING SERVICABLE CERTIFICATE FROM IOCL. CATER FOR FRESH FUEL IN CASE DEFUELLED LSHFHDS/ AVCAT GOT CONTAMINATED.
PROVIDE 08 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT.NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT AT ACTUALS
TEMPORARY LIGHTING AND VINTILLATION ONBOARD FOR THE ENTIRE DURATION OF REFIT TO BE PROVIDED IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE, BALLAST TANKSMUST BE WELL LIT WITH 24 VDC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS PER DAY. PAYMENT AT ACTUALS. PROVISION OF 05 PORTABLE INTAKE/ EXHAUST BLOWERS OF MINIMUM 02 KW RATING WITH ADEQUATE HOSING ARRANGEMENT. ARRANGEMENT ON AS REQUIRED BASIS. PAYMENT AT ACTUALS.
SHIP YARD TO TEST LUB OIL/FUEL/ COOLANTS/HYDRAULIC OIL /WATER AS PER SHIPS REQUIREMENT FOR NECESSARY PARAMETERS AS INDICATED BY SHIP STAFF AND PROVIDE RESULTS/CERTIFICATE. STANDARD CONTAINERS / SAMPLE BOTTLES CAPACITY 250 ML TO BE PROVIDED FOR SHIPYARD FOR LANDING THE SAMPLES FOR LUB OILS, COOLANTS, HYDRAULIC OIL ETC FOR ANALYSIS (50 BOTTLES)
SHIPYARD TO ENSURE MOVEMENT OF STEEL FROM MO (KOC) / NSRY (KOC) TO SHIPYARD INCLUDING LOADING / UNLOADING, MANPOWER, TRAILOR AND CRANE. PAYMENT AT ACTUALS
ADMIN SERVICES
SUPPLY 60 LITRES OF DRINKING WATER (AQUAFINA/ KINLEY/ BISLERY) PER DAY ONBOARD.
ONE AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE FOR RMT OFFICERS OF NSRY EACH WITH ATTACHED TOILET, EXECUTIVE TABLE, EXECUTIVE CHAIR, VISITORS SOFA, TWO CUPBOARDS WITH LOCK/KEY AND 03 VISITORS CHAIRS FOR REFIT DURATION
STATIONARY IS TO BE PROVIDED FOR SMOOTH FUNCTIONING OF RMT OFFICE OF NSRY FOR RS 10,000/- PER MONTH
PROVIDE TWO CHANGING ROOMS WITH LOCKERS AND ATTACHED WASH ROOM FOR 10 NSRY(K) WORKERS. PAYMENT AT ACTUALS
FOLLOWING TO BE ENSURED FOR ALL ABOVE OFFICE SPACES (A) DRINKING WATER THROUGH RO/ AQUAGAUARD WITHIN 50 M (B) SEPARATE TOILETS FOR OFFICERS AND CREW ARE TO BE PROVIDED WITHIN 50M (C) DAILY MAINTENANCE / CLEANING
PROVIDE 02 IN NO "REFIT DATA ENTRY OPERATORS" WITH ADEQUATE EXPERTISE IN VARIOUS PLANNING/PROJECT MONITORING/ DECISION MAKING SOFTWARES, COMPUTER KNOWLEDGE WITH EXPERIENCE IN MS PROJECT, MS ACCESS, OFFICE(PPT, WORD, EXCEL, ETC). MINIMUM EXPERIENCE OF 02 YEARS IN SHIPYARD. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST REPAIR/REFIT DATA PROCESSING /COORDINATION ACTIVITIES. REQUIRED TO WORK IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/TRIALS TO EXTRACT TRIAL DATA, ON SHIFT BASIS, INCLUDING SUNDAY/ HOLIDAY AS PER DEMAND OF THE REPAIR/ REFIT.
PROVIDE 01 IN NO "REFIT TECHNICAL SUPERVISIORS" [PREFERABLY RETIRED IN SENIOR SAILORS (ERA/EAP)]. ALTERNATELY, PERSONAL WITH MINIMUM B. TECH (MECH/ ELECTRICAL/ELECTRONICS/NAVAL ARCHITECTURE) WITH MINIMUM EXPERIENCE OF 05 YEARS IN SHIP REPAIR FIELD. SALARY TO MATCH SHIPYARD ASSISTANT MANAGER LEVEL. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST REPAIR/REFIT TRIALS / PLANNING ACTIVITIES. REQUIRED TO WORK IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/TRIALS, ON SHIFT BASIS ROUND THE CLOCK, INCLUDING SUNDAY/ HOLIDAY AS PER DEMAND OF THE REPAIR/REFIT.
PROVIDE 01 IN NO "REFIT COORDINATOR" [PREFERABLY RETIRED IN SENIOR SAILORS (ERA/EAP)]. ALTERNATELY, PERSONAL WITH MINIMUM B. TECH (MECH/ ELECTRICAL/ ELECTRONICS/NAVAL ARCHITECTURE) WITH MINIMUM EXPERIENCE OF 05 YEARS IN SHIP REPAIR FIELD. SALARY TO MATCH WITH SHIPYARD ASSISTANT MANAGER LEVEL. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST REPAIR/REFIT COORDINATION/ PLANNING ACTIVITIES. REQUIRED TO WORK IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/TRIALS, ON SHIFT BASIS ROUND THE CLOCK, INCLUDING SUNDAY/ HOLIDAY AS PER DEMAND OF THE REPAIR/REFIT.
PROVIDE 01 IN NUMBER "REFIT ACCOUNTANT-CUM-AUDITOR" WITH ATLEAST MCOM DEGREE AND HAVING ACCOUNTING AND AUDIT EXPERIENCE FOR COMPLEX SHIP REPAIR CONTRACTS AND MULTISTAGE BILLS. MINIMUM EXPERIENCE 05 YEARS. SALARY TO MATCH SHIPYARD DEPUTY/ ASSISTANT MANAGER LEVEL. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST CONTRACT REPAIR/REFIT, AUDIT & BILLING ACTIVITIES. REQUIRED TO WORK AT OFFICE AS WELL AS IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/ TRIALS, ON SHIFT BASIS INCLUDING SUNDAY/HOLIDAY AS PER DEMAND OF THE REPAIR/REFIT.
PROVIDE TWO FIVE SEATER AC CARS 01 EACH FOR PROJECT OFFICER (NSRY) & COMMERCIAL DEPT. (12 HRS/120 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2019, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES)
PROVIDE MEALS FOR CREW DURING SHIP'S DOCKING & WHARFAGE PERIOD (06 DUTY PERSONNEL PER DAY)
HULL - PART
HP jet clean the following area to be undertaken (with a pressure not exceeding 3000 PSI) U/W hull (external) Area
Boot top area
Blasting of following area to be undertaken: Underwater Hull (Payment at actuals)
Weather Decks (Payment at actuals)
UTG survey of following are to be undertaken. Underwater Hull including Boot Top
Weather Deck
Tank and Tank Top
Bilges , Cofferdom, Void Space and chain locker
Manual Cleaning of Following Area is to be undertaken: Hull Manually Cleaning: Manually clean following area and present for visual survey.The area should be washed out with fresh water and soap water to remove any sediment or dirt present in the tank (a) Engine room bilges- 460 (b) Ballast Tank-1250 (c) Cofferdom-225 (d) Chain Locker-75 (e) Steering gear complartment -80
Manually clean following tanks with fresh water and soap water to remove any sediment or dirt present in the tank (a) Feed Water Tank- 550 (b) Fresh water tank- (1160 sqm)
Surface preparation and Painting with Full Paint scheme Internal compartments -Tanks Carry out mechanical surface preparation to ST 3 standards and paint application whereever peeled off / paint defective as per visual survey: (a) Fresh water tanks (b) Feed Water tanks
Surface preparation and Painting with Full Paint scheme Internal Compartments - Carry out mechanical cleaning to ST 3 standard and paint application as per survey report of Paint OEM. (a) Engine room bilges (b) Ballast Tank (c) Cofferdom (d) Chain Locker
Painting of Top Coat U/W hull (external) Area
Boot top area
External above water hull area including both sides of bulwark outside
Weather Decks
Superstructure outside bulkhead, bollards, ladders, mast, inside bulwark, all deck fittings
Painting with Full Paint Scheme Under water Hull (To be decided after Sand Blasting/Plate Renewal)
Weather Deck ((To be decided after Sand Blasting/Plate Renewal))
Sea Tubes Grating Remove,clean,examine gratings of inlets/ discharges and sea chests. Renew If detoriated . Painting to be undertaken post examination as per NO 53/16.
Sea tube (a) Hydro jet blasting, visual survey and pressure testing of sea tube including sea chest to be carried out if repaired/renewed post visual survey report and UTG report. (b) Carryout renewal of defective seatubes.
Steel plate renewal to be undertaken
Awning stanchion shoe is corroded/perished. Need to be renewed.
Strip, clean and replace soil pipes/drain pipes of sanitary system. Renew/Regalvanise where necessary. Mat- GI.
Ventilation (Supply and Exhaust Trunking System)-Clean internal surfaces of ventillation trunking. (BR 2203 chap. 4 Para 13-17, Qty 06 trunks)
Ventilation (Supply and Exhaust Trunking System)- Trunking in galley- Clean grease filter, renew if required.
Ventilation trunking including diffusers to be cleaned in living areas, lobbies and wheel house
Examine the ventilation trunking in engine room for air flow and damage. Clean and repair if necessory
Anchor & Cables-Examine anchor slips, associated stoppers and shackles of anchor. Coat with boiled linseed oil. Remove shackles pins and bolts clean, grease and replace. Carry out load test and certificate to be provided.
Anchor & Cables-Lay out chain cable and hydrojet cleaning of chain cable.
Anchor & Cables-Survey cable,shackles and break. Clean and grease all joining shackles. Strip and grease slip in cable locker. Rearrange cable length to ensure equality of wear. Certificate to be provided.
Anchor & Cables-Post survey of cable chain, clean and paint as per approved paint scheme in NO 53/16. Marking of entire cable length to be undertaken. Sand blast if required.
Anchor & Cables-Move and lubricate anchor flukes. Examine associated hull fittings. Examine all spare chain cable and fittings, clean and coat as per NO 53/16.
Anchor & Cables-Survey SW hawsers and associated fittings. Load Test to proof load of 417 KN, Apply Break Load of 583 KN. Certificate to be provided.
Lifiting slings & Chain block-Inspect and weight test, floatation test, drop test and lifting test of Chain Block. Capacity- 3 ton.
Lifiting slings & Chain block-Inspect and weight test, floatation test, drop test and lifting test of Gemini lifting sling.
Rigging (Mast, Funnels and Dressing Lines)-Rigging-Mast, Funnels and dressing lines- Examine eye plates and surrounding structure for evidence of corrosion on fittings. Chip, recoat with appropriate paint as required.
Aluminum brows are to be examined/repaired and load tested upto 300 kg. Lifitng handles to be fittted at the end of brows for lifting.
Load test of all lifting appliances to be carried out as per specifications. LOAD TEST CERTIFICATES TO BE PROVIDED
Examine all reels the structure in their immediate vicinity for distortion, corrosion or cracking of welds. Repair/renew as required.
Examine all roller fairleads the structure in their immediate vicinity for distortion, corrosion or cracking of welds. Repair/renew as required.
Examine all bollards the structure in their immediate vicinity for distortion, corrosion or cracking of welds. Repair/renew as required.
Examine all cleats the structure in their immediate vicinity for distortion, corrosion or cracking of welds. Repair/renew as required.
Examine all eyebolts the structure in their immediate vicinity for distortion, corrosion or cracking of welds. Repair/renew as required.
Examine base/ foundations of all deck fittings/ machineries on whether decks for any distortion, corrosion or cracking of welds/plates. Repair/renew as required.
Anchor Windlass-Overhauling to be carried out. Strip down for examination of all bearings, clutches and brake linings, renew if necessory. Examine linings, grease all pins, replace and adjust.
Examine all stanchions and Shoes and heel fittings for distortion and structure in the vicinity of heel fittings. Replace broken stanchions including Shoes with 1.25 inch GI pipe.
WT Doors-Check clips for looseness and wedge pieces for signs of wear. Renew leather washers of toroidal sealing rings where necessary. Chalk test door seating and renew rubber.
WT Scutteles-Renew perished rubber seatings and Chalk test rubber seatings, water test by hose of Scuttles Port holes. Replaced all the nut/bolt with SS.
Survey hatch and manhole covers. Remove and clean hatch and tumbler hinge pins. Grease and replace. Remove air test plug and ensure testing hole in thread is clear.Renew rubber seatings, and carry out chalk test. Renew associated fitting if necessory
Exposed WT manhole and hatches-Survey hatch and manhole covers. Remove and clean hatch and tumbler hinge pins. Grease and replace. Remove air test plug and ensure testing hole in thread is clear.Renew rubber seatings, and carry out chalk test.
Masters cabin flush tank not holding water. Fill,Flush and Float VV mecahnism to be renewed.
Galley drainage system pipes heavly corroded/perished. To be renewed with end flanges. Size- 40mm, Mat-GI.
Guard rail on upper deck along with bottle screw slips perished. To be renewed. Qty - 12 Nos.
Defective rubber 'D' fender on both sides of hull to be renewed, approx length 15 metres.Lossened 'D' Fenders to be secured appropirately.
Sanitary pipes in toilet and wash rooms, thinned & corroded, to be renewed. Size 1/2" to 1 1/2".(Crew tiolets and wash room)
04 Cocks and 03 Valves fitted in sanitory system defective. To be renewed. Mat- Standard SS Fittings.
Curtains in mess decks to be renewed and curtain holding hooks to replaced.(Crew Accommodation)
Spurn beam(Coaming) on both sides detoriated. To be reapired/renewed.(Height -1"). Spurn beam to be fitted with split pipe (Size-1/2") to protect berthing hawsers wear/tear duirng various evolutions.
Tank level indicator cover box corroded to be replaced.(size- 01 cubic feet)
Shore supply connection box glass broken to be replaced.(Size-2 sq mtr)
Door not getting closed.suspect defective hinges.Door locking handle not working. To be renewed.(Master Cabin & Galley Door)
Hydraulic door closer in cabins not working to be renewed.(Crew Accommodation Area)
Chain of Tyre fender corroded.. To be renewed with end fittings (mat-GI).
Tyre fender detoriated/perished. To be renewed with end fittings.
Base for maganetic compass support corroded/perished. To be renewed.(Bridge top)
Lockers fitted on weather deck corroded/perished. To be renewed. Mat-SS.(Deck fittings)
Base for navigational light corroded/perished. To be renewed.(Bridge top)
Galley-Aluminum Pannelling fitted in galley uprooted/perished. To be renewed with support frame.
Galley-Locking arrangement of hot plates and oven broken/ perished.To be renewed.
Wooden panelling and framework in crew toilet and bathroom perished/uprooted. To be renewed.
Life Raft- Life raft securing cradles corroded and perished. To be renewed as per BR 67/09 and as specified in Para 4.1.6 of the SOLAS code.
Life Raft- Serviceability checks of Hydrostatic release mechanism which includes HRG and Hammer H 20. Renew if found defective.
Underwater Sacrificial anodes - Renewal of 35 in no sacrificial anodes is to be carried out if consume more than 50%.(Payment at actuals)
ENGINEERING
Following 2000 hrly routines to be carried out on both main engines:- 250 Hrly Routine (i) Battery Electolyte level check
(ii) Belts to be replaced
(v) Engine Oil and filter change and refill 15W 40 - 420 ltr
(vi) Hoses and clamps-inspect/Replace
500 hrly Routine (i) Air Shutoff Test
1000 Hrly Routine (i) Engine clean
(ii) Engine Crankcase Breather clean
(iii) Engine protective devices- check
(iv) Fuel Sys Primary and Secondry Filter and water Separator Replace
2000 Hrly Routine (i) Air Starting Motor Lubricator bowl clean
(ii) Crankshaft Vibration Damper- Inspect
(iii) Driven Equipment- Check
(iv) Engine mount to be Inspected
(v) Turbocharger Inspect
(vi) Cooling system supplimental Coolant addictive(SCA) replace.
(vii) Durets to be renewed
(viii) Zink plug of Sea water cooler to be renewed
2000 hrly routines of both gear box:- 1 H1: Change Lub oil and oil filter elements (04 nos) along with gasket. (Oil used-MAK 40, Qty 100 ltrs)
2000H2: Oil breather assembly should be thoroughly cleaned every time the oil is changed.
2000 H3- Carry out safety device checks of gear box. Certificate to be provided post checks.
flexibale lub oil hose to be replaced
Steering gear-24 monthly routines to be carried out on steering gear:- Note:- Calibration certificates to be provided, were necessary. Replace and clean suction filter elements.
Lubricate steering engine assembly using the portable greasing gun.
Check hydraulic system pressure and tank level.
Check and rectify hydraulic system leakages
Check rudder movement on all monitoring position.
Check all indicator lamps are working. Defective lamps to be replaced.
Steering gear-Clean check helm indicator, steering operating switch including rudder angle feed back unit. Replace operating switch if found defective.
Steering gear-Check and prove alarm indicating unit. Defective components to be renewed.
Steering gear-Renew hydraulic oil. Oil used T-68.
Steering gear-Overhaul hydraulic cylinders.
Steering gear-Check the rudder jumping clearance, dimensional clearances of rudder stock. Provide certificates for record purpose.
Steering gear- Renew filter catridge
Steering motor panel board timer unit (port) Not working.Replace if defective
6 MONTHLY-1: Check solenoid valve for functioning properly. Check for leaks of air from valve side. Renew/Repair as required.(Air Whistle, Model KA-75)
6 MONTHLY-2: Clean air filters of the system.(Air Whistle, Model KA-75)
6 MONTHLY-3: Diaphragm to be cleaned and wiped with flannel cloth. Use clean flannel cloth to remove dirt and grit.(Air Whistle, Model KA-75)
Diesel oil Transfer Pump- 6 MONTHLY: Check alignment of the pump & motor.
ANNUALLY-1: Check oil seal leakage, renew if required.
ANNUALLY-2: Dismantle pump for overhaul.
ANNUALLY-3: Check bearing. Replace if necessary.
ANNUALLY-4: Examine condition of coupling shaft. Renew worn or defective parts.
F/W Pump Hydrophore- ANNUALLY-1: Open impeller casing and check condition of impeller sealing ring, casing etc. for sign of tear and wear/ corrosion. Replace if required.
HP Air Compressor- 250 H1: Check the compressor running sound and vibration tightness of running bolts and other fasteners. Check air leak at pressure line, intercooler, safety valves, after cooler, non-return valves etc. Reset pressure cut off and cut in pressures. Rectify air leaks, tighten fasteners.
HP Air Compressor- 250 H2: Renew suction filter.
HP Air Compressor- 250 H3- Renew compreessor lub oil. Oil used - Elgi Air lube, Qty- 3 Ltrs.
HP Air Compressor- 250 H4- Check pressure switch operation and ensure prper CUTOFF and CUT in pressure. Cut off pr-30 bar, Cut in pr- 22 bar.
Feed Water Cargo System- ANNUALLY REFIT-1: Overhauling valves in the system; carry out pressure testing up to 1-½ times of the working pressure. Qty 02 Valves, Size-125 mm, working press- 8kgf/cm2.
Fuel Oil System- Clean all storage tanks and RU tanks inspect for rust and corrosion.Preserve tanks post cleaning.
Fuel Oil System- Overhauling of valves in the system; carry out pressure testing up to 1-½ times of the working pressure. If required re-condition them. Size-80 mm.
HP air system- Strips and examine all reducing valves and relief valves. Carry out pressure testing and renew parts as necessary. Relief vv set pr- 32 bar, Reducing vv set pr-08 bar.
HP air system- Calibrate all pressure gauges in the system. Calibration certificates to be provided.Range- 0-45 kg/cm2, Renewed if requred.
Remove, refit, clean and pressure test all air stop valves.
Diesel Generator- Carry out following 2000 hrly routines of all 03 DA's:- Renew lub oil filters. Qty-04.
Diesel Generator- Renew lub oil. Qty-80 ltrs, Oil used-15W40.
Diesel Generator- Replace/ Adjust belts. Qty- 04.
Diesel Generator- Replace air filters. Qty-02.
Diesel Generator- Replace engine coolant. Coolant used- Caterpillar Extended life coolant.
Diesel Generator- SV Mounts to be renewed.(High vibration Observed)
Diesel Generator- Carry out safety devices fitted on engine and alternator. Certificate to be provided post SDC checks.
Diesel generator - clean/replace engine crancase breather
Diesel generator - inspect and refill batteries DA starting batteries with electrolyte. Replace batteries if found unserveciable with maintenance free batteries
Diesel Generator - chemically clean fresh water and lub oil coolers followed by pressure testing. Provide test certificates. Renew zinc anodes qty -16
Diesel generator - drain and clean fuel tank
Diesel Generator - replace hoses/clamps
Diesel Generator-Port DA Control panel display unit to be renewed.
Diesel Generator-Durets to be renewed
Diesel Generator-Fuel leakage observed from mechanical seal of Fuel Injection pump of port DA. Pump to be removed, dismantled for examination of shaft, bearings and seals. Renew worn out parts. Pump to be refitted post OH
Sea water pump impeller of both DAs to be renewed.
Diesel Generator-Leakage observed from engine driven sea water pump mechanical seal. Pump to be removed, dismantled for examination of shaft, bearings and seals. Renew worn out parts. Pump to be refitted post OH.
Stern tube- Carry out six monthly routines on stern tube seals any defect observed to be rectified:- Check for face seal wear/working length.
Stern tube- Carry out six monthly routines on stern tube seals any defect observed to be rectified:- Check the function and performance of the inflatable seal. Air pressure -2.5 bar for 30 minutes.
Fuel oil purifier- Carry out annual routines on fuel oil purifier. Clean and inspect connections, clean and check separator bowl, renew o-rings and sealings, check worm wheel shaft and gear housing, clean and check brake, clean and check vertical driving device, clean and check pump, renewe pump lipseal ring. Clean and check friction coupling. Renew parts if necessary.
Fuel oil purifier- Renew Oil in Gear Housing. Oil used - Shell tellus 220
Fuel oil purifier- Trials to be offered post annual routines.
Fuel oil purifier- Air filter element to be renewed.
Air Receivers- 4M1: Test all relief valves and reset (BR-3000 ART 2302 Para 2) Qty 02, Size 80 mm, Rel Press. 35 kgf/sq cm. (Capacity-125 Ltrs)
Air Receivers- ANNUALLY 1: Test the system for maximum working pressure and check for leaks. Work Pressure- 30 bar. (Capacity-125 Ltrs)
Air Receivers- 2 YEARLY-1: Calibrate all pressure gauges. Range 0-45 bar.(Capacity-125 Ltrs)
Main sea chest isolating valve not holding pressure. To be overhauled and pressure tested. Test pressure-05 bar. 150mm, gate valve-04
Main sea chest isolating valve not holding pressure. To be overhauled and pressure tested. Test pressure-05 bar. 150 mm, butterfly valve-04.
Frequent clogging of emerency DG fuel filters observed. RU fuel tank to be cleaned and preserved with appropriate preservative.
Steering Gear- Lub oil leakage observed from RU tank(Port Side). To be rectified.
Tank level gauges- Following tank level gauges erratic/malfunctioning. To be calibrated and calibration certificate to be provided. Tank level sensor for Cargo feed water tanks
Tank level sensor for dirty oil tank
Tank level sensor for FO storage tank
Tank level sensor for Cargo fresh water tanks
Carry out following annual routines on OWS:- Change the filter candles and zinc anodes (qty- 02).
Remove and clean oil sensing probes. Renew if required.
Check all cable connections and renew if defective.
Overhaul feed pump and motor. Renew oil in geared motor (Oil used-Omala 220, Qty-0.2 Ltrs)
Overhaul electro-pneumatic valve.
Calibrate all gauges.
Calibrate bilge monitor.
Calibration certificates to be provided.
Buffing and Primer apllication and painting of Engine Room and Pump Room Bilges.
Manufacturing of safety guard of machinaery (Rotaing part)
Renewal of all push button toggel swith and base plates of control pannel in bridge.
Manufacturing of counduit pipe 100mm Dia-20 mtrs,
75 mm- 20 mtrs,
50 mm 20 mtrs
Fitment of flood sensors along with control panel.
Manufacturing of union adaptor
Manufacturing of valve handels
Blue tent inspection of both propeller,I rectification if contact b/w propeller and shaft found less then 70%.
Renewal of S/W pipe line 75mm diameter.
Overhauling of DD fire pump
Manufacturing of HP compressor relef line valve to bilge. Length 02 mtrs mat- Brass.
Manufacturing of portable extinguisher brackets.
Charging of AFFF extinghisher
Weighing of 2 KG CO2 extinguisher
Hot lagging of both engine and DA exhaust line
Overhauling of Fire hydrant
Colour coding of emergency escape route (sticker)
Colour coding of all system pipe lines (sticker)
Manufacture system pipeline blanks as per sample.
Servicebility checks of portable submercible pump
ELECTRICAL
Alternator- Inspect visually starter, rotor, average temperature indication act system, operating hours, adapters remote electronic tachometers, gauges, thermometers .Check the Engine instumentation panel of generator. Repair/Renew as required.
Carry out the preparatory operation for the first start as per maintenance documentation with a load of not less than that specified in the documentation.
Check that the Self starters are properly secured and functioning. Overhaul starter if required.
Check all earth connections are tight and properly earthed. Replace/renew detoriated/perished.
Check the bridge diode assembly , windings and rotating diode using separate excitation as per Maintenanace manual.
Check all protections/ indication for normal functioning with prime mover running as per maintenance manual.
Carry out inspection of shock/vibration mountings. Replace if necessary.
Check AVR for serviceability. Replace if erratic.
Main Switch board braker and STBD DG braker damaged , To be renewed.
Steering gear- As part of annual routine,Inspect the supply cables / wiring for damage / deterioration.Carry out SPM checks on motor bearing. Lubricate/ replace bearing as necessary and Carry out Servicibility and calibration checks of starter.
Air Compressor Motor- As part of annual routine,Inspect the supply cables / wiring for damage / deterioration.Carry out SPM checks on motor bearing. Lubricate/ replace bearing as necessary and Carry out Servicibility and calibration checks of starter.
GS Pump Motor & Starter- As part of annual routine,Inspect the supply cables / wiring for damage / deterioration.Carry out SPM checks on motor bearing. Lubricate/ replace bearing as necessary and Carry out Servicibility and calibration checks of starter.
Rudder Angle Indicator- Adjustment/Calibration of rudder angle indicator with rudder.
Fuse Panel- As part of annual routine Check and rewire the fuse panel wiring as required.Check the reliability of contact connections and fixing of capacitors.Clean the filter with compressed air.Check the filter insulation resistance.
Boat Devit Motor body damaged observed low insulation, To be renewed
Boat Davit Control System is malfunctiong.Suspect limit switches are defective.Defect to be rectified. Limit Switch to be renwed.
Engine room LED lightings are non operational. Defect to be rectified. Total 50 Nos Tube
Accommodation area light fittings are non operational.Defect to be rectified/renew
Flood lights fitted onboard are non operational.Defect to be rectified.(Miscellaneous Fittings)
Search light fitted onboard is non opearational. Defect to be rectified.(Miscellaneous Fittings)
Navigation light not working. Defect to be rectified
Clean the echo sounder transducer and preserve it using appropriate grease.
Carry out the serviceability checks and calibration of bus coupler breakers in switchboard.Provide calibration certificates.Rating 415V, 50hz, 3phase , 100 amps
Carry out the serviceability checks and calibration of Section breakers in switchboard.Provide calibration certificates. Rating 415V, 50hz, 3phase,100 amps.
Carry out the serviceability checks and calibration of Feeder/isolater breakers in main switchboard.Provide calibration certificates. Rating 415V, 50hz, 3phase-05 nos and 230V,50hz, 1phase - 05 nos.
As part of annual routine carry out the calibration checks of following meters fitted in main switchboard and emergency DA switchboard .Reapir/renew if necessary. Calibration certificate to be provided.
Ammeter
voltmeter
Frequency meter
Synchroscope
KW meter
Mega ohm meter
CO2 firefighting system - blow out clean all disstributing piping with air/CO2
CO2 firefighting system -empty pressure test CO2 bottles. provide test certificates
CO2 firefighting system - check pressure relief valve and switch.
CO2 firefighting system - overhaul main control panel
Fire alarm system- control system battery defective. Replace with new battery. 12 V 120 AH
Check complete system for intactness safe and effective operation (i) Remove cylinder and weight using beam balance if less than 10% of initial weight ,refill cylinder weight 45 kg no of cylinder 07
(ii) check pilot cylinders weight 3 kgs Qty 02
Clean, inspect and prove all fire sensors. Replace defective sensors with new one
Serviceablity and capacity checks of control system batteries to be carried out.(12V 180 AH
Serviceability checks of Sound power telephone system and repair if defective Qty 05
Serviceability checks of PA system to be carried out
Shore supply under voltage protection unit fitted in main switchboard not working. To be repaired/renewed.
Replace domestic switch for all cabins
Replace all lamp indicator in bridge
Replacement of PPE kit for crew
Replacement of digital guage of feed water system
Replacement of cabin portable fan
Replacement of shore supply cable with end sockets
Replacement of emergency light bulb
Description of Work / Item(s)
Amount
LIST OF SPARES TO BE QUOTED BY THE SHIPYARDS
ENGINEERING
FILTER SCOOT(AIR CLE)
CLAMP-HOSE
CLAMP-HOSE
FILTER ELEMENT AS-AI
BELLOW AS
GASKET-EXHAUST MANIF
BOLT HIGH TEMPERATURE
GASKET-EXHAUST MANI
BOLT HIGH TEMPERATURE
KIT-REPAIR (EXPLOSIO
INSERT-VALVE SEAT(I
INSERT VALVE SEAT(E
SEAL O RING
SEAL O RING
SEAL O RING
SEAL O RING
SEAL O RING
GASKET
SPRING-INJECTOR
GASKET-HOUSING COVER
GASKET
RING-RETAINING
SEAL O RING
GASKET
SEAL O RING
SEAL O RING
SEAL O RING
SEAL O RING
SEAL O RING
GASKET
SEAL O RING
GASKET
SEAL O RING
SEAL O RING
FILTER-ELEMENT-FUEL
SEAL -RING (FUEL FILT
SEAL O RING
FILTER-ELEMENT-FUEL
BELTS
CARRIER
GASKET
GASKET
STRAINER
LUB OIL FILTER
CLAMP - HOSE
FILTER ELEMENT AS - AIR (PRIMARY)
FILTER ELEMENT AS - AIR (SECONDARY)
CLAMP - HOSE
GASKET
GASKET - TURBOCHARGER
GASKET - TURBOCHARGER
GASKET
FILTER - ENGINE OIL
GASKET - CYLINDER HEAD
V- BELT (FAN) (INCLUDES ONE BELT)
HOSE (CRANKCASE BREATHER)
GASKET (VALVE COVER)
DIAPHRAGM (CRANKCASE PRESSURE CO)
REGULATOR AS WATER TEMPRERATURE
CLAMP HOSE
CLAMP HOSE
CLAMP - BAND
CLAMP - HOSE
CLAMP - HOSE
HOSE - ELBOW
CLAMP-HOSE
CLAMP-BAND
CLAMP-HOSE
CLAMP-HOSE
STRAINER
PUMP GP- WATER (AUX)
FILTER - FUEL
HOSE AS
HOSE AS
BRACKET
INJECTOR AS - FUEL
PUMP GP FUEL INJECTION (FIP)
CLAMP - HOSE
HOSE (100-CM)
S/W PUMP IMPELLER
PISTON SEAL
PISTON O RING
O RING
WIPER SEAL
CIRCLIP
LOCK NUT
CIRCLIP
CIRCLIP
ALLEN BOLT
PACKING
POINTER
LOCKING PIN
INDICATOR PLACE
MICRO SWITCH WITH SPRING
CABLE GLAND
OIL SEAL
INDICATION LAMP (RED)
INDICATION LAMP (GREEN)
ON/OFF SWITCH
CONTACTOR
AUX CONTACTOR
OVER LOAD RELAY
ON DELAY TIMER
RELAYS
RELAYS
RUDDER ANGLE INDICATOR
ON/OFF SWITCH
RUDDER ANGLE INDICATOR
PUSH BUTTON (BLACK)
INDICATION LAMP (BLACK)
CLAMP - HOSE
FILTER ELEMENT - AIR (PRIMARY)
FILTER ELEMENT - AIR (SECONDARY)
GASKET
GASKET (ENGINE OIL FILTER BASE )
GASKET - CYLINDER HEAD
V-BELT SET
GASKET (VALVE COVER )
DIAPHRAGM (CRANK CASE PRESSURE CONTRACOR)
HEAD AS OIL FILTER (ENGINE)
HOSE (48-CM)
CLAMP HOSE
CLAMP HOSE
CLAMP HOSE
FILTER ELEMENT - FUEL
FILTER ELEMENT
HOSE AS
HOSE AS
HOSE AS
HOSE (8 - CM)
HOSE AS
HOSE AS
FILTER AS - ENGINE OIL
S/W PUMP IMPELLER
BACK COVER
STUFFING BOX GLAND
SAFETY VALVE
MECHANICAL SEAL
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .