Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹30.4 L+₹17.0 L (126.2%)Rejected-Finance 38 1067 NEAR POORNATHRAYEESA TEMPLE TRIPUNITHURA P O ERNAKULAM 682301 ERNAKULAM ERNAKULAM KERALA 682301 | ERNAKULAM | KERALA | 682301 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹36.9 L+₹23.4 L (174.1%)Rejected-Finance | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹28,000
Closing Date
25 Mar 2023, 4:00 pmClosed
AGMM
TELK, ANGAMALY
Disassembling and shifting of 2 Nos of existing HITACHI make 18 MVA three phase Generator Transformers and its accessories from the service bay Panniar to other location Neriamangalam or Lower Periyar
2023_TEKL_563463_1
TELK/C AND M/OES/TRER/304/2023
Open Tender
Miscellaneous Services
Item Wise
365 days
PANNIAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,200
Yes
₹28,000
Yes
6 Jun 2023
3 Mar 2023
28 Mar 2023
3 Mar 2023
25 Mar 2023
3 Mar 2023
PART-A Complete erection, oil processing, testing, successful commissioning and handing over of 18 MVA 110/11 KV three phase Generator transformer as per Cl 4.0, 4.1, 4.3, 4.4 & 4.5 of scope of work.
PART-A Dragging on rails/sleepers & placement on plinth of TELK make 18 MVA Generator transformer as per Cl. 4.2 of scope of work. (The rate per meter per transformer shall be quoted here)
PART-A Turning of transformer tank of TELK make GT by 90 degrees for proper placement on plinth (HV side- LV side direction matching w.r.t site condition) as per Cl 4.2 of scope of work. (The rate per turn per transformer shall be quoted here)
PART-A Dismantling of existing HITACHI make GT and its accessories as per Cl 4.0 of scope of work and shifting from service bay to other location (neriamangalam – 20Kms away from present site)
PART-A Dismantling of existing HITACHI make GT and its accessories as per Cl 4.0 of scope of work and shifting from service bay to other location (Lower Periyar – 40 kms away from present site )
PART-B (OPTIONAL) Dragging on rails/sleepers for placement at desired location of old HITACHI make 18 MVA Generator transformer at (neriamangalam / Lower periyar site). (The rate per meter per transformer shall be quoted here)
PART-B To provide services for watch & ward for safe upkeep of old transformer and its accessories during transit to storage locations (neriamangalam/Lower Periyar)
PART-B SFRA test on TELK make new transformers
PART-C (OPTIONAL) - HIRE CHARGES FOR EXTRA/RECTIFICATION WORKS (beyond this scope of work) Labour charges for repair/rectification/modification/additional work-
PART-C Hydra suitable for Bushing Erection
PART-C High vacuum Filter Machine For 6000 lph capacity filter machine
PART-C Oil tankers For 10 kL capacity
PART-C For 20 kL capacity (rate per day)
PART-C For 30 kL capacity (rate per day)
ELECTROTEK ENGINEERS PVT. LTD.
ADHATA CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .