| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6,383.68Admitted-Finance | -41.00% | ₹6,383.68 | L1 | Admitted-Finance |
| 2 | L2₹7,032.87+₹649.19 (10.2%)Admitted-Finance | -35.00% | ₹7,032.87+₹649.19 (10.2%) | L2 | Admitted-Finance |
| 3 | L3₹7,213.56+₹829.88 (13.0%)Admitted-Finance | -33.33% | ₹7,213.56+₹829.88 (13.0%) | L3 | Admitted-Finance |
| 4 | L4₹7,868.16+₹1,484.48 (23.3%)Admitted-Finance | -27.28% | ₹7,868.16+₹1,484.48 (23.3%) | L4 | Admitted-Finance |
| 5 | L5₹8,515.18+₹2,131.50 (33.4%)Admitted-Finance | -21.30% | ₹8,515.18+₹2,131.50 (33.4%) | L5 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
1 Jun 2026, 6:00 pmClosed
XEN CMD SVP
Kangan
Clearance of Berm from uphill side of canal at spots.
2026_SPDC_309647_6
CMD SVP K 01 of 2026
Open Tender
Civil Works
Percentage
60 days
SUMBAL
Please refer Tender documents.
4 documents required · 4 mandatory
₹495
CPAO USHP II
₹16,000
Divisional office
4 Jun 2026
9 May 2026
3 Jun 2026
10 May 2026
1 Jun 2026
10 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | - | Cum | 592.9 | - |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | - | Cum | 940.3 | - |
| 3 | Carraige of material/earth from working to dumping site by Manual Labour including loading, unloading and stacking upto the lead of 50m.whereever required | - | Cum | 200.67 | - |
| 4 | Carraige of material/earth from working to dumping site by Manual Labour including loading, unloading and stacking upto the lead of 100m.whereever required | - | Cum | 244.36 | - |
| 5 | Carraige of material/earth from working to dumping site by Manual Labour including loading, unloading and stacking upto the lead of 300m.whereever required | - | Cum | 419.12 | - |
| 6 | Provision for temporary foot Bridge across canal | - | Cum | 8,422.45 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.58 MB
BOQ_1002287.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .