Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
Closing Date
16 Feb 2022, 3:00 pmClosed
Officer-in-Charge, FMU(V
FMU, C/o FMO, VISAKHAPATNAM-14
REPAIR RATE CONTRACT FOR CO 2 FIRE FIGHTING SYSTEM FITTED ONBOARD P-17, P-28 AND NOPV CLASS OF SHIPS
2022_NAVY_503721_1
C/301/CO2/NOPV P-17 P-28 DATED 25 JAN 2022
Open Tender
Marine Services
Buy
1095 days
FMU, VISAKHAPATNAM
AS PER RFP
5 documents required · 5 mandatory
₹0
Exempted
FMU, VISAKHAPATNAM
8 Apr 2022
25 Jan 2022
17 Feb 2022
25 Jan 2022
16 Feb 2022
25 Jan 2022
25 Jan 2022 - 10 Feb 2022
3 Feb 2022
Amount
First Year
Services
Testing/Removal/ Fitment of Fire alarm Panel (MFAP)
Repair of panel module of Main fire alarm panel
Repair of motherboard of Main fire alarm panel
Repair of card interface of Main fire alarm panel
Repair of main switching interface of Main fire alarm panel
Repair of display screen of Main fire alarm panel
Repair of signal board
Repair of keypad membrane of Main fire alarm panel
Repair of main lead with IEC connector
Repair of serial interface
Repair of sounder/monitored output board
testing/Removal/ Fitment of MIMIC Panel
Repair of mimic panel
Testing /removal / fitment of Repeater panel
Repair of repeater panel
Testing /removal / fitment of break glass type push button station
Testing /removal / fitment of relay box
Testing /removal / fitment of junction box
Testing /removal / fitment of hooter cum strobe with back box
Testing /removal / fitment of monitor module
Testing /removal / fitment of control module (relay)
Testing /removal / fitment of QA valve assembly
Testing /removal / fitment of manifold check valve
Testing /removal / fitment of 50 NB pressure operated directional valve
Testing /removal / fitment of 32 NB pressure operated directional valve
Testing /removal / fitment of 25 NB pressure operated directional valve
Testing /removal / fitment of discharge pressure switch
Testing /removal / fitment of pilot vent valve
Testing /removal / fitment of 3/16"non return valve
Testing /removal / fitment of 24 volt DC solenoid valve
Testing /removal / fitment of 1/2"ball valve
Testing /removal / fitment of 1/2" CO2 non return valve
Testing /removal / fitment of CO2 discharge nozzle assembly Y N2
Testing /removal / fitment of CO2 discharge nozzle assembly Y N3
Testing /removal / fitment of CO2 discharge nozzle assembly Y N4
Testing /removal / fitment of CO2 discharge nozzle assembly Y N6
Service & installation of CO2 cylinder with valves
Degutting of complete system, removal and weighing of complete CO2 systems
Undertake overhaul/renewal of CO2 cylinder mounted valves and pressure switches
discharge CO2 gas from all cylinders and carry out visual survey and proof testing
Remove cleaning and pressure test all pilot nitrogen bottles
Undertake overhaul/renewal of all valves of pilot nitrogen bottle
change deficient quantity of CO2 & stamp the date of testing on each cylinder
prove the systems for completeness
supply of spares , CO2 pipe fitting (bend/tees & spares) , installation and prove the CO2 fire fighting systems along with QC checks
supply of CO2 cylinder valve disc and prove the CO2 system
Testing /removal / fitment of CO2 discharger (rubber)
Testing /removal / fitment of 3/16" pilot hose with assembly
Testing /removal / fitment of manifold NPU
Testing /removal / fitment of CO2 discharge copper pipe with end fittings
Testing /removal / fitment of cylinder valve
Testing /removal / fitment of CO2 discharge manifold
Testing /removal / fitment of pressure switch
Application of paint signal red
Inspection of corrosion / dent or damage which may affect safe operation of system valves, sensors, wire,etc
Check system / wiring for completeness in accordance with panel board / drawing.
Ensure all moving parts are free , well moving and lubricated
Blow through pipe for all diffusion points.
Calibration of co2 concentration sensor (m/s dragger)
Proving of ventilation crash stop mechanism with operation of co2 firefighting system in each compartment
Calibration of co2 bottle weighing scale
Integration of main fire alarm panel with system
Spares
Break glass type push button station
Monitor module
Control module (relay)
CO2 discharge nozzle assembly Y N2
CO2 discharge nozzle assembly Y N3
CO2 discharge nozzle assembly Y N4
CO2 discharge nozzle assembly Y N6
CO2 pipe fitting (bend/tees & spares)
CO2 cylinder valve disc
CO2 discharger (rubber)hose
3/16" pilot hose with non return valve (pilot check valve) assembly
Manifold NPU
CO2 discharge copper pipe with end fittings
Cylinder valve
CO2 discharge manifold
Pressure switch
Paint signal red
Fire Alarm panel (MFAP)
MIMIC Panel
Repeater panel
Relay Box
Junction Box
Hooter cum strobe with Backbox
CO2 cylinder -45 kg capacity
Q.A valve assembly
50 NB pressure operated directional valve
32 NB pressure operated directional valve
25 NB pressure operated directional valve
N2 pilot cylinder (2.0 ltr) C/W PR. Gauge and PR & switch
Pilot vent valve
24 V DC solenoid valve
½” Ball valve
½” CO2 Non return valve
Solenoid reset tool
CO2 beam scale
Spring balance
Second Year
Services
Testing/Removal/ Fitment of Fire alarm Panel (MFAP)
Repair of panel module of Main fire alarm panel
Repair of motherboard of Main fire alarm panel
Repair of card interface of Main fire alarm panel
Repair of main switching interface of Main fire alarm panel
Repair of display screen of Main fire alarm panel
Repair of signal board
Repair of keypad membrane of Main fire alarm panel
Repair of main lead with IEC connector
Repair of serial interface
Repair of sounder/monitored output board
testing/Removal/ Fitment of MIMIC Panel
Repair of mimic panel
Testing /removal / fitment of Repeater panel
Repair of repeater panel
Testing /removal / fitment of break glass type push button station
Testing /removal / fitment of relay box
Testing /removal / fitment of junction box
Testing /removal / fitment of hooter cum strobe with back box
Testing /removal / fitment of monitor module
Testing /removal / fitment of control module (relay)
Testing /removal / fitment of QA valve assembly
Testing /removal / fitment of manifold check valve
Testing /removal / fitment of 50 NB pressure operated directional valve
Testing /removal / fitment of 32 NB pressure operated directional valve
Testing /removal / fitment of 25 NB pressure operated directional valve
Testing /removal / fitment of discharge pressure switch
Testing /removal / fitment of pilot vent valve
Testing /removal / fitment of 3/16"non return valve
Testing /removal / fitment of 24 volt DC solenoid valve
Testing /removal / fitment of 1/2"ball valve
Testing /removal / fitment of 1/2" CO2 non return valve
Testing /removal / fitment of CO2 discharge nozzle assembly Y N2
Testing /removal / fitment of CO2 discharge nozzle assembly Y N3
Testing /removal / fitment of CO2 discharge nozzle assembly Y N4
Testing /removal / fitment of CO2 discharge nozzle assembly Y N6
Service & installation of CO2 cylinder with valves
Degutting of complete system, removal and weighing of complete CO2 systems
Undertake overhaul/renewal of CO2 cylinder mounted valves and pressure switches
discharge CO2 gas from all cylinders and carry out visual survey and proof testing
Remove cleaning and pressure test all pilot nitrogen bottles
Undertake overhaul/renewal of all valves of pilot nitrogen bottle
change deficient quantity of CO2 & stamp the date of testing on each cylinder
prove the systems for completeness
supply of spares , CO2 pipe fitting (bend/tees & spares) , installation and prove the CO2 fire fighting systems along with QC checks
supply of CO2 cylinder valve disc and prove the CO2 system
Testing /removal / fitment of CO2 discharger (rubber)
Testing /removal / fitment of 3/16" pilot hose with assembly
Testing /removal / fitment of manifold NPU
Testing /removal / fitment of CO2 discharge copper pipe with end fittings
Testing /removal / fitment of cylinder valve
Testing /removal / fitment of CO2 discharge manifold
Testing /removal / fitment of pressure switch
Application of paint signal red
Inspection of corrosion / dent or damage which may affect safe operation of system valves, sensors, wire,etc
Check system / wiring for completeness in accordance with panel board / drawing.
Ensure all moving parts are free , well moving and lubricated
Blow through pipe for all diffusion points.
Calibration of co2 concentration sensor (m/s dragger)
Proving of ventilation crash stop mechanism with operation of co2 firefighting system in each compartment
Calibration of co2 bottle weighing scale
Integration of main fire alarm panel with system
Spares
Break glass type push button station
Monitor module
Control module (relay)
CO2 discharge nozzle assembly Y N2
CO2 discharge nozzle assembly Y N3
CO2 discharge nozzle assembly Y N4
CO2 discharge nozzle assembly Y N6
CO2 pipe fitting (bend/tees & spares)
CO2 cylinder valve disc
CO2 discharger (rubber)hose
3/16" pilot hose with non return valve (pilot check valve) assembly
Manifold NPU
CO2 discharge copper pipe with end fittings
Cylinder valve
CO2 discharge manifold
Pressure switch
Paint signal red
Fire Alarm panel (MFAP)
MIMIC Panel
Repeater panel
Relay Box
Junction Box
Hooter cum strobe with Backbox
CO2 cylinder -45 kg capacity
Q.A valve assembly
50 NB pressure operated directional valve
32 NB pressure operated directional valve
25 NB pressure operated directional valve
N2 pilot cylinder (2.0 ltr) C/W PR. Gauge and PR & switch
Pilot vent valve
24 V DC solenoid valve
½” Ball valve
½” CO2 Non return valve
Solenoid reset tool
CO2 beam scale
Spring balance
Third Year
Services
Testing/Removal/ Fitment of Fire alarm Panel (MFAP)
Repair of panel module of Main fire alarm panel
Repair of motherboard of Main fire alarm panel
Repair of card interface of Main fire alarm panel
Repair of main switching interface of Main fire alarm panel
Repair of display screen of Main fire alarm panel
Repair of signal board
Repair of keypad membrane of Main fire alarm panel
Repair of main lead with IEC connector
Repair of serial interface
Repair of sounder/monitored output board
testing/Removal/ Fitment of MIMIC Panel
Repair of mimic panel
Testing /removal / fitment of Repeater panel
Repair of repeater panel
Testing /removal / fitment of break glass type push button station
Testing /removal / fitment of relay box
Testing /removal / fitment of junction box
Testing /removal / fitment of hooter cum strobe with back box
Testing /removal / fitment of monitor module
Testing /removal / fitment of control module (relay)
Testing /removal / fitment of QA valve assembly
Testing /removal / fitment of manifold check valve
Testing /removal / fitment of 50 NB pressure operated directional valve
Testing /removal / fitment of 32 NB pressure operated directional valve
Testing /removal / fitment of 25 NB pressure operated directional valve
Testing /removal / fitment of discharge pressure switch
Testing /removal / fitment of pilot vent valve
Testing /removal / fitment of 3/16"non return valve
Testing /removal / fitment of 24 volt DC solenoid valve
Testing /removal / fitment of 1/2"ball valve
Testing /removal / fitment of 1/2" CO2 non return valve
Testing /removal / fitment of CO2 discharge nozzle assembly Y N2
Testing /removal / fitment of CO2 discharge nozzle assembly Y N3
Testing /removal / fitment of CO2 discharge nozzle assembly Y N4
Testing /removal / fitment of CO2 discharge nozzle assembly Y N6
Service & installation of CO2 cylinder with valves
Degutting of complete system, removal and weighing of complete CO2 systems
Undertake overhaul/renewal of CO2 cylinder mounted valves and pressure switches
discharge CO2 gas from all cylinders and carry out visual survey and proof testing
Remove cleaning and pressure test all pilot nitrogen bottles
Undertake overhaul/renewal of all valves of pilot nitrogen bottle
change deficient quantity of CO2 & stamp the date of testing on each cylinder
prove the systems for completeness
supply of spares , CO2 pipe fitting (bend/tees & spares) , installation and prove the CO2 fire fighting systems along with QC checks
supply of CO2 cylinder valve disc and prove the CO2 system
Testing /removal / fitment of CO2 discharger (rubber)
Testing /removal / fitment of 3/16" pilot hose with assembly
Testing /removal / fitment of manifold NPU
Testing /removal / fitment of CO2 discharge copper pipe with end fittings
Testing /removal / fitment of cylinder valve
Testing /removal / fitment of CO2 discharge manifold
Testing /removal / fitment of pressure switch
Application of paint signal red
Inspection of corrosion / dent or damage which may affect safe operation of system valves, sensors, wire,etc
Check system / wiring for completeness in accordance with panel board / drawing.
Ensure all moving parts are free , well moving and lubricated
Blow through pipe for all diffusion points.
Calibration of co2 concentration sensor (m/s dragger)
Proving of ventilation crash stop mechanism with operation of co2 firefighting system in each compartment
Calibration of co2 bottle weighing scale
Integration of main fire alarm panel with system
Spares
Break glass type push button station
Monitor module
Control module (relay)
CO2 discharge nozzle assembly Y N2
CO2 discharge nozzle assembly Y N3
CO2 discharge nozzle assembly Y N4
CO2 discharge nozzle assembly Y N6
CO2 pipe fitting (bend/tees & spares)
CO2 cylinder valve disc
CO2 discharger (rubber)hose
3/16" pilot hose with non return valve (pilot check valve) assembly
Manifold NPU
CO2 discharge copper pipe with end fittings
Cylinder valve
CO2 discharge manifold
Pressure switch
Paint signal red
Fire Alarm panel (MFAP)
MIMIC Panel
Repeater panel
Relay Box
Junction Box
Hooter cum strobe with Backbox
CO2 cylinder -45 kg capacity
Q.A valve assembly
50 NB pressure operated directional valve
32 NB pressure operated directional valve
25 NB pressure operated directional valve
N2 pilot cylinder (2.0 ltr) C/W PR. Gauge and PR & switch
Pilot vent valve
24 V DC solenoid valve
½” Ball valve
½” CO2 Non return valve
Solenoid reset tool
CO2 beam scale
Spring balance
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .