Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance GRAM SEMA PO SEMA NANDPRAYAG JILA CHAMOLI | NANDPRAYAG | CHAMOLI | UTTARAKHAND | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
20 Nov 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Uttarakhand Jal Sansthan Circle -Gopeshwar, (Chamoli)
Supply, Laying and Jointing of G.I. Pipe line (m) and other appurtenant works of Phase Tapvan w/s Water supply scheme in block Joshimath of District chamoli under Jal jeewan mission
2023_UKJS_65384_5
597/Vividh/2023-24 dated 3.11.2023
Open Tender
Civil Works - Water Works
Item Wise
75 days
Gopeshwar Chamoli
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer, UJS
₹1.4 L
Gopeshwar Chamoli
21 Nov 2023
7 Nov 2023
21 Nov 2023
7 Nov 2023
20 Nov 2023
7 Nov 2023
16 Nov 2023
Rates for Supply, Laying & Jointing of G.I. Pipe line (m) and other appurtenant works of Phase Tapovan w/s Water supply scheme in block Joshimath of District chamoli under Jal jeewan mission FY 2023-24.
Source Work & C.W.R WORK:-
Steel intake chamber (0.60*0.60*0.60 mtr.) S/O all materials, labours T&P etc. as per design.
Provision of Roughening filter cum collecting chamber including supply of all material, labour, T&P etc complete. as per design.
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6
RRSM Laid dry
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 35.00 KL
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6
RRSM Laid dry
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.(including GST 18.00 %)
SUPPLY MAIN
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. From trenches including supply of labour,T&P.etc complete.Assuming that 70% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock. Earth & Boulders
Medium Rock
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. 32 mm dia
40 mm dia
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. Complete Wheel valves G.M. Gate Valve IS 778 Class-I 32 mm dia
40 mm dia
High head Cast Iron air Valve IS 778 Class-I 50 mm dia 15 mm (T.P.-10kg/Sqcm)
Supply of all materials,labours ,T.&P. etc.and construct Wheel/Gate valve chamber as per design complete.
Supply of all materials,labours ,T.&P. etc.and construct air valve chamber as per design complete.
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6
RRSM Laid dry
Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.distance upto 260.00 km pakka road & 3.00 km by head load (Including GST 18.00%)
DISTRIBUTION SYSTEM
Dismantling of following dia screwed and socketed G.I. Pipe, Specials and fittings including taking out of dismantled GI Pipes and specials from trenches and stacking them properly within 50.00 mtr. But excluding the cost of eath work. 25 mm dia
40 mm dia
50 mm dia
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 70% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock. Earth & Boulders
Medium Rock
Relaying of G.I. Pipe in true alignment in trenches including supply of all materials, labours, T&P etc. Complete. 25 mm dia
40 mm dia
50 mm dia
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. 25 mm dia
50 mm dia
Supply of the following fittings including cartage of materials,labours ,T.&P. etc. Complete. G.M. Gate Valve IS 778 Class-I 25 mm dia
32 mm dia
40 mm dia
50 mm dia
Supply of all materials,labours ,T.&P. etc.and construct Wheel/Gate valve chamber as per design complete.
Supply of all materials,labours ,T.&P. etc.and construct BPT chamber as per design complete.
Provision for Cutting of C.C. Kharanja
Reinstatement of of C.C. Kharanja
Provision for balance FHTC
Protection work nearby along the pipe line for proper completion of work. RRSM Laid in 1:6
RRSM Laid dry
Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.distance upto 260.00 km pakka road & 3.00 km by head load (Including GST 18.00%)
PRAHALAD SINGH RAWAT
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .