Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC DOOR NO 3 79 CHENNNADGRAMAPANCHAYAT PERUMBALA KASARAGOD 681317 | PERUMBALA | KASARAGOD | KERALA | 681317 | L1 | Accepted-AOC Lowest bid | |
| 2 | L2₹16.6 L+₹2.7 L (19.4%)Rejected-Finance DOOR NO IV 400 NEAR RAMANTHALI GHSS RAMANTHALI PO KANNUR 670308 | KANNUR | KERALA | 670308 | L2 | Rejected-Finance Higher bid value |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
25 Dec 2019, 6:00 pmClosed
GE MAINT EZHIMALA
GARRISON ENGINEER (MAINT) MILITARY ENGINEER SERVICES INDIAN NAVAL ACADEMY POST KANNUR DIST KERALA 670 310
OUTSOURCING SERVICES FOR MANNING AND OPERATION OF RL-92 AND RL-146 INCLUDING REPAIRS OF ELECTRIC MOTORS AND PUMPS AND CONNECTED WORKS UNDER AGE E/M (MAINT) AT INA EZHIMALA
2019_MES_303620_1
GE MAINT EZHIMALA 8277 E8
Open Tender
Manpower Supply
Item Rate
330 days
EZHIMALA
As per NIT
7 documents required · 7 mandatory
₹500
GE MAINT EZHIMALA
₹30,000
Yes
20 Jan 2020
4 Dec 2019
27 Dec 2019
4 Dec 2019
25 Dec 2019
18 Dec 2019
5 Dec 2019 - 17 Dec 2019
Amount
Note applicable for all Items of BOQ:- If the lowest quoted amount is less than the estimated cost of the work mentioned in NIT, the lowest bidder will have to deposit FDR/BGB in favour of Accepting Officer within 7 (Seven) days of opening of Financial Bid for the difference in estimated cost and quoted amount. In case the said FDR/BGB is not submitted within stipulated period as mentioned above, the contractor shall be banned for 6 months and his bid will be rejected. FDR/GBG will be released only after completion of entire work and production of proof for the payment of wages to all the workers employed under the contract is not less than the minimum wages notified by the Central Govt./State Govt. whichever is more
Outsourcing services for Operating and maintenance of pump sets suction and delivery valves ,DG sets ,LT switch gear LT Panels including recording of all parameters connected with installation and up keeping of sump valve etc clean and tidy at RL+92 pump house and RL 146 pump house in three shifts by employig one FGM in Each Shift :- (i) First shift starts from 0600 hrs to 1400 hrs (ii) Second shift starts from 1400 hrs to 2200 hrs and (iii) Third shift starts from 2200hrs to 0600 hrs The works shall be carried out on all days Including Sundays and holidays by deploying one ITI/recognised ITC qualified skilled Fitter General Mechanic (FGM) for each shift accordingly contractor shall employee sufficient number of persons complete all as specified and directed by Engineer-in-Charge. department.
Outsourcing services for Operating and maintenance of pump sets , LT switch gear ,LT Panel,Machineries, including recording of all parameters connected with installation and up keeping of sump, clean and tidy at ,well No,5 and Well No-4 in 2 shifts by employing one FGM in Each Shift (i) First shift starts from 0600 hour to 1400 hours (ii) Second shift starts from 1400 hrs to 2200 hrs The work shall be carried out on all days including Sundays and holidays by deploying one ITI/recognised ITC qualified skilled fitter General Mechanic(FGM) for each shift, accordingly contractor shall employ sufficient number of persons complete all as specified and directed by Engineer-in-charge.
Notes for Item Nos. 2 & 3 :- (a) Each shift consists of 08 hrs. Rate quoted shall be deemed to include each shift of 08 hrs including Sunday and holiday. (b) To operate pump sets installed at pump house including suction and delivery valves and to carry out routine check of suction and delivery valve and to carry out routine check of suction and delivery pipe lines ,joints and arresting of leakages if any in pipe /control valves of inside the pump house premises. (c) To operate LT switchgears installed at sub station for pump house and inside of the pump house building. (d) To carry out preventive maintenance at regular intervals for LT panels and LT switch gears. (e) To record all parameters connected with LT distribution system ,pumping record in log books /register all as directed (f) Cleaning of all vegetation up to 3 meters all around pump house, sump and valves chambers including necessary tools required. (g) The rate quoted shall be deemed to include the cost of consumable items such as cotton waste,orthodine solution and cleaning materials etc. (h) The tradesman shall be well qualified in respective trade and shall wear approved uniform as directed the engineer -in- charge while on duty .He shall be well conversant with preventive measures (first aid) in case of Electrical accidents and fire fighting system. (j) The unit rate quoted shall be include cost stationary required to maintain attendance register ,log books and other registers. (k) The unit rate quoted shall include cost of consumable materials such as lubrication oil, grease, cotton waste etc.
M&L For Repair/rewinding of electric motor 100 HP .(Make: Kirloskar) including the following works:- (a) Disconnecting the electrical cable from the terminal box of motor and decoupling the motor from the pump , remove the motor from foundation bed and lifting the motor using chain pulley block and transporting to authorised work shop. (b) Dismantling the motor and taking out the burnt copper winding wire /fibre strip/insulating materials. (c) Clean the stator slots by CTC solution and rewind on stator slots with duel coat super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection using 90 mm fibre glass coated wire. (d) Assembling the motor as directed by the Engr-in-charge. (e) Transporting to the motor to the site and refixing on foundation channel with new bolts and nuts , coupling the pump and motor with correct alignment, apply grease and connecting electrical connections testing complete all as directed and specified by the Engineer-in-charge
M&L For Replacement of DE and NDE roller bearing of 100HP pump set induction motor.(Make: SKF) including the following works:- (a) Disconnecting the electrical cable from the terminal box of motor and decoupling the motor from the pump , remove the motor from foundation bed and lifting the motor using chain pulley block and transporting to authorised work shop. (b) Dismantle the motor and remove the unserviceable DE (drive end) roller bearing and Non drive end bearing using bearing puller with necessary supports. (c) Dismantle the old bearing from rotor shaft and pressing new bearing. (d) Material and labour for replacement of drive end roller bearing and Non drive end bearing - 1 set. (e) Apply insulating varnish over both end side of the coil. (f) Replacement of unserviceable fibre tape from end side of the coil. (g) Assembling the motor as directed by the engr-in-charge. (h) Transporting to the motor to the site refixing on foundation channel with new bolts and nuts , coupling the pump and motor with correct alignment apply grease and connecting electrical connections testing complete all as directed and specified by Engineer-in-charge.
M&L For Repair/rewinding of electric motor 60 HP including the following works:- (a) Disconnecting the electrical cable from the terminal box of motor and decoupling the motor from the pump , remove the motor from foundation bed and lifting the motor using chain pulley block and transporting to authorised work shop. (b) Dismantling the motor and taking out the burnt copper winding /fibre strip/insulating materials. (c) Clean the stator slots by CTC solution and rewind on stator slots with duel coat super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection using 90mm fibre glass coated wire. (d) Assembling the motor as directed by the engr-in-charge. (e) Transporting to the motor to the site refixing on foundation channel with new bolts and nut washer and spring washer , coupling the pump and motor with correct alignment apply grease and connecting electrical connections in motor terminal box testing complete all as directed and specified by the Engr-in-charge
M&L for Replacement of DE & NDE roller bearing of 60 HP Pump set's Induction motor including the following works :- (a) Disconnecting the electrical cable from the terminal box of motor and decoupling the motor from the pump , remove the motor from foundation bed and lifting the motor using chain pulley block and transporting to authorised work shop. (b) Dismantle the motor and remove the unserviceable DE (drive end) roller bearing and non drive end bearing using bearing puller with necessary supports. (c) Dismantle the old bearing from rotor shaft and pressing new bearing. (d) Apply insulating varnish over both end side of the coil. (e) Replacement of unserviceable fibre tape from end side of the coil. (f) Assembling the motor as directed by the Engr-in-charge. (g) Transporting to the motor to the site refixing on foundation channel with new bolts and nuts washer and spring washer, coupling the pump and motor with correct alignment apply grease and connecting electrical connections in motor terminal box testing complete all as directed and specified by Engineer-in-charge.
M&L For Decoupling the pump & Motor and transport the pump to work shop . Dismantle the split case centrifugal pump to replace the unserviceable bearing 2 set ,Gland set replacement work of double suction brass impeller and lathe work on new stainless steel shaft along with replacement brass collar ring,gland seating stain less steel sleeve for each side of pump shaft,coupling set,gland flange etc. Assembling the pump coupling the pump and motor with correct alignment and testing complete for the following capacities of pump set complete all as specified and directed by the Engineer-in charge.
100 HP Pump set Make:- Kirloskar
60 HP Pump set Make:- Kirloskar
Scraping the old paint by using wire brush and emery paper and preparation of the surface for painting the following pump set's /control panel /suction and delivery pipe of the pump house with one coat of primer and two coat of synthetic enamel paint all as specified and directed at site of the following items of Water supply installations:-
100 HP Pump sets
60 HP Pump sets
01 HP Pump sets
LT Panels
Iron Step Ladder 3 Mtr. / 7Mtr. Height kept inside/outside the sump/reservoir
Starter Panels
Iron Step Ladder 7Mtr. Height kept inside/outside the sump/reservoir
M&L For Repair/rewinding of electric motor 12.5 HP including the following works:- (a) Disconnection of electric cable from the terminal box of motor ,Decoupling the motor from the pump remove the motor from the foundation bed and taking out the motor and transporting to authorised work shop. (b) Dismantling the motor and taking out the burnt copper winding /fibre strip/insulating materials and worn out ball bearing - 2 no. (c) Clean the stator slots by CTC solution and rewind on stator slots with super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection of fibre glass coated wire. (d) Remetaling the shaft by lathe work and welding work for correct alignment for fixing of bearing. (e) Replacement of ball bearing - 2 set (f) Transporting to the motor to the site refixing on foundation channel with new bolts and nuts , coupling the pump and motor with correct alignment apply grease and connecting electrical connections testing complete all as directed and specified by the Engr-in-charge
M&L For Repair/rewinding of electric motor 10 HP including the following works:- (a) Disconnection of electric cable from the terminal box of motor ,Decoupling the motor from the pump remove the motor from the foundation bed and taking out the motor and transporting to authorised work shop. (b) Dismantling the motor and taking out the burnt copper winding /fibre strip/insulating materials and worn out ball bearing - 2 no. (c) Clean the stator slots by CTC solution and rewind on stator slots with super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection of fibre glass coated wire. (d) Remetaling the shaft by lathe work and welding work for correct alignment for fixing of bearing. (e) Replacement of ball bearing - 2 set (f) Transporting to the motor to the site refixing on foundation channel with new bolts and nuts , coupling the pump and motor with correct alignment apply grease and connecting electrical connections testing complete all as directed and specified by the Engr-in-charge
M&L For Repair/rewinding of electric motor 5 HP including the following works:- (a) Disconnection of electric cable from the terminal box of motor ,Decoupling the motor from them pump remove the motor from the foundation bed and taking out the motor and transporting to authorised work shop. (b) Dismantling the motor and taking out the burnt copper winding /fibre strip/insulating materials and worn out ball bearing - 2 no. (c) Clean the stator slots by CTC solution and rewind on stator slots with super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection of fibre glass coated wire. (d) Remetaling the shaft by lathe work and welding work for correct alignment for fixing of bearing. (e) Replacement of ball bearing - 2 set (f) Transporting to the motor to the site refixing on foundation channel with new bolts and nuts , coupling the pump and motor with correct alignment apply grease and connecting electrical connections testing complete all as directed and specified by the Engr-in-charge
M&L For Repair/rewinding of electric motor 03 HP including the following works:- a) Disconnection of electric cable from the terminal box of motor ,Decoupling the motor from them pump remove the motor from the foundation bed and taking out the motor and transporting to authorised work shop. (b) Dismantling the motor and taking out the burnt copper winding /fibre strip/insulating materials and worn out ball bearing - 2 no. (c) Clean the stator slots by CTC solution and rewind on stator slots with super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection of fibre glass coated wire. (d) Remetaling the shaft by lathe work and welding work for correct alignment for fixing of bearing. (e) Replacement of ball bearing - 2 set (f) Transporting to the motor to the site refixing on foundation channel with new bolts and nuts , coupling the pump and motor with correct alignment apply grease and connecting electrical connections testing complete all as directed and specified by the Engr-in-charge.
M&L For Repair/rewinding of electric motor 1HP including the following works:- (a) Disconnection of electric cable from the terminal box of motor ,Decoupling the motor from them pump remove the motor from the foundation bed and taking out the motor and transporting to authorised work shop. (b) Dismantling the motor and taking out the burnt copper winding /fibre strip/insulating materials and worn out ball bearing - 2 no. (c) Clean the stator slots by CTC solution and rewind on stator slots with super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection of fibre glass coated wire. (d) Remetaling the shaft by lathe work and welding work for correct alignment for fixing of bearing. (e) Replacement of ball bearing - 2 set (f) Transporting to the motor to the site refixing on foundation channel with new bolts and nuts , coupling the pump and motor with correct alignment apply grease and connecting electrical connections testing complete all as directed and specified by the Engr-in-charge
Disconnect the electrical connection, Lifting/reerection the submersible pump set from open well/bore well of capacity 5 HP capacity and dismantling the pump set and rewinding the submersible motor with copper sleeves wire of suitable gauge and proper insulation and replacement of PvC impeller for pump ,connecting and testing and lowering the same and testing and commissioning complete all as specified and directed by Engineer-in-Charge.
Disconnect the electrical connection, Lifting /reerection the submersible pump set from open well of capacity 3 HP capacity and dismantling the pump set and rewinding the submersible motor with copper sleeveswire of suitable gauge and proper insulation and replacement of PVC impeller for pump, connecting and testing and lowering the same and testing and commissioning complete all as specified and directed by Engineer-in-Charge.
Supply and fix in replacement 3 pole power contactor type MNX 140 ,AC 1 rating 160 Ambs and AC3 rating 140 Amps Aux contacts 2 NO+2NC range from 9A-650 A ,415 Volts coil voltage ,including taking down the existing unserviceable material complete all as specified and directed by Engineer-in-Charge. Make : C&S/L&T/Legrand
Supply and fix in replacement 3 pole power contactor type MNX110 ,AC 1 rating 160 Ambs and AC3 rating 110 Amps Aux contacts 2 NO+2NC range from 9A-650 A ,415 Volts coil voltage ,including taking down the existing unserviceable material complete all as specified and directed by Engineer-in-Charge. Make : C&S/L &T/Legrand
Supply and install in replacement submersible pump controller in sheet enclosure type MU-G motor rating AC-3 duty ,415 volt 50 Hz, 3 phase relay range 9-14 Amps for 6 HP and 4.5 KW Submersible motor complete all as specified and directed by Engineer-in-Charge. Make : Havells/L&T
Supply and fix in replacement electronic star Delta timer, wide operating voltage 160-500V, 50 Hz availaable in time delay range 3-30sec and 12-120 secs including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : L&T /C&S/Havells.
Supply and fix in replacement electronic type single phase preventer 415 V ,50 Hz including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : L&T /C&S or Equivalent as approved by GE
Supply and fix in replacement FASD (Fully automatic star delta starter),ML 1.5, 415 Volts relay range 13 - 21 Amps complete all as specified and directed by Engineer-in-Charge. Make : L&T/C&S /Havells
Supply and fix in replacement FASD (semi automatic star delta starter),in sheet enclosure type MK1S, 415 Volts relay range 13 - 22 Amps complete all as specified and directed by Engineer-in-Charge. Make : L&T/C&S /Havells
Supply and fix in replacement DOL starter (Direct on line) 3 phase 415 Volts 50 Hz relay range 20 to 32 Amps including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : L&T/C&S/AE
Supply and fix in replacement DOL starter (Direct on line) 3 phase 415 Volts 50 Hz relay range 09 to 15 Amps including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : L&T/C&S/AE
Supply and fix in replacement flat submersible 3 core copper conductor PVC insulated and PVC sheathed cable of size 6 Sqmm including taking down old unserviceable Material complete all as specified and directed by Engineer-in-Charge. Make : Finolex/Havells/Plaza
Supply and fix in replacement MCB DP 32A 'C 'curve including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : L&T/C&S/Havells.
Supply and fix in replacement MCB SP 6-32 Amp 'C' curve including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : L&T/C&S/Havells.
Taking down unserviceable MCCB,supply and fix new MCCB,415V,160 4pole,35KA fixed thermal and magnetic setting complete all as specified and directed. Make:Havells/C&S/L&T
Supply and fix in replacementstainless steel foot valve 100 mm dia including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : Prayag/Prince/JSW
Supply and fix in replacement stainless steel foot valve 80mm dia including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : Prayag/Prince/JSW
Supply and fix in replacement stainless steel foot valve 65 mm dia including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : Prayag/Prince/JSW
Supply and fix in replacement stainless steel foot valve 25 mm dia including taking down old material complete all as specified and directed by Engineer-in-Charge. Make : Prayag/Prince/JSW
Material and Labour for greasing of 100 HP centrifugal pump set with grease gun/manually of suitable grease up to required level complete all as specified and directed by Engineer-in-Charge.
Material and Labour for greasing of 60 HP centrifugal pump set with grease gun/manually of suitable grease up to required level complete all as specified and directed by Engineer-in-Charge.
Sreekrupa Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .