Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 2 | Admitted-Finance 123 12TH FLOOR ATLANTA NARIMAN POINT NARIMAN POINT MUMBAI MAHARASHTRA 400021 | MUMBAI | MAHARASHTRA | 400021 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
22 Apr 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
NR OF BPT II
2021_NAVY_432871_3
COM/0302/BPT II/NR O/L-21/A
Open Tender
Marine Services
Turn-key
150 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY CONFERENCE HALL
4 Jun 2021
25 Mar 2021
23 Apr 2021
26 Mar 2021
22 Apr 2021
26 Mar 2021
26 Mar 2021 - 22 Apr 2021
3 Apr 2021
240 days
HULL SOW TUG - BPT 2 Equipment/Defect Description 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway). Note 2:- Last Undock -Aug 18
002 Hull Cleaning Under Water and Boot Top Area (a) HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and present for survey.
002 Hull Cleaning Shipside above water inluding bulwark (b) HP jet clean entire Shipside (with a pressure not exceeding 3000 PSI) to remove the salts and contaminants from the surface and present for survey and present for survey.
002 Hull Cleaning Weather Deck (d) HP jet clean entire Weather Deck (with a pressure not exceeding 3000 PSI) remove salts and contaminants from the surface and present for survey.
002 Hull Cleaning Cable locker (j) Manually clean Cable locker and present for survey. The tanks should be washed out with fresh water and soap water to remoeve any sediment or dirt present in the tank
002 Hull Cleaning Machinery compartments (l) Manually clean bilges and bulkheads of engine room using detergent solution to remove oil, grease and other contaminantsand present for survey
003 Hull survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull, boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.. Approx. area:3500 Sqm Firm to submit 07 copies of Hull survey report .
004 UTG Survey Carry out UTG survey in thge presence of QC representatives of U/W hull, ship side, superstrcture, weather deck, bulkheads, Tanks, living spaces covering entire part of hull. Firm to submit 07 copies of Hull survey report.
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Firms to indicate cost of new panelling(2mm thick) and Lagging (2" MFMB) material in the budgetary cost for 50 sqm each.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) 25 x 25 mm - 150Nos
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) 50 x50 mm - 75 Nos
007 Sea tubes (a) Grit blasting of the sea tubes to be carried out for survey and pressure testing of sea tube including sea chest . Dia - 300mm
008 Draught Marks Draught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted.
009 Sacrificial Anodes (a) Renew MK - I sacrificial anodes which are perished by over 50%. Note:- Anodes will be supplied by Navy/COY.
009 Sacrificial Anodes (b) Renew MK - V sacrificial anodes which are perished by over 50%. Note:- Anodes will be supplied by Navy/COY.
010 Surface preparation Under Water area including Boot top area with Grit Blasting (a) Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
010 Surface preparation Under Water area including Boot top area with Sweep Blasting (b) Sweep blasting to SA 2.5 on the rest of the underwater areas for removal of anti-fouling and applicationof tie coat and 03 coats of anti-fouling.
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
011 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
012 Surface Preparation Above Water Area and Bulwark (a) Surface Preparation to ST 3 on the rest of above water area for paint application as recommended by paint OEM.
012 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
012 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey) - 125 microns DFT
012 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
013 Surface Preparation Weather Decks Bridge Deck Bridge Top and Fittings (a) Carry out surface preperation to WJ 2.0 standard by using Hydro Jet Blasting for paint application for entire weather deck.
014 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
014 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
014 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
015 Surface Preparation Internal Compartments Void spaces fw tanks, ballast tanks :- Carry out mechanical cleaning to ST3 standard on paint damaged areas as per survey report of Paint OEM for paint application.
016 Painting - JOTUN Scheme. Void spaces Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme.. Void spaces Paint two in no. fresh water tanks , ballast tanks,void spaces and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns DFT
016 Painting - JOTUN Scheme. Void spaces Paint two in no. fresh water tanks , ballast tanks,voidspaces and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 2nd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns DFT
016 Painting - JOTUN Scheme.. Void spaces Paint two in no. fresh water tanks , ballast tanks,voidspaces and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns
017 Surface Preparation Tanks cable locker (a) Carry out mechanical cleaning fore peak tanks,ballast tanks and cable locker to ST3 standard on paint damaged areas as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme cable locker Paint fore peak tanks,Ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium/ Grey) - 2 X150 microns DFT
018 Painting - JOTUN Scheme cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 4th Coat: Penguard Top Coat - 50 microns
019 Surface Preparation Machinery Compartments- DG room and switcg board room (a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for paint application ( Bilges).
019 Surface Preparation Machinery Compartments- DG room and switcg board room (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application (Bulkheads).
020 Painting - JOTUN Scheme. Machinery Compartments- DG room and switch board room Paint bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
020 Painting - JOTUN Scheme. Machinery Compartments- DG room and switch board room Paint bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns DFT
020 Painting - JOTUN Scheme. Machinery Compartments- DG room and switch board room Paint Bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns
020 Painting - JOTUN Scheme. Machinery Compartments- DG room and switch board room Paint DG room and Switch board compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns.
021 Cleaning and Application of Oil RU (FODS) Tanks Manually scrap and clean RU Tank (02nos) to bare metal and apply two coats of OM 750 oil. Note:- Quoted repair cost shall be inclusive of cost of oil also
022 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. a) Anchor
022 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. b) Chain cable (Dia 17.5mm) total length of the cable 275 Mtrs
022 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and c) Swivel piece
022 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting d) Lug less joining shackles
022 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and e) Cable stopper
022 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and f) D Shackles
023 Anchor windlass/ Capstan Completely strip & overhaul anchor windlass (including lub oil renewals), renew brake linings, refit and prove for satisfactory operation. Note :- Overhaul involves removal of drum, gearbox, brake lining, motor and ovrhaul of all these items and refitment. Oil-SYS-46/HP80
024 Bollards Towing Bollards Following bollards corroded, thinned. Entire bollard to be renewed /repaired as per hull survey reports (a) Single bollards, Size: 290 mm dia, 10 mm thickness, 500 mm length. schdule-80 pipe
024 Bollards Twin bollards (b) FollowingTwin bollards corroded, thinned. Entire bollard to be repaired/renewed as per Hull survey report. Dia of bollard pipe 290 MM. Height of bollard 515 MM. Size of bollard base/ foundation1163X125X380 MM: , Thickness of pipe: 10 mm. Doubler plate size: 1230X480X10 MM, thickness: 10 mm,
025 Tyre Fender Tyre fender damaged on P&S side to be renewed with used aircraft tyre fenders moulded with 8 mm layer of white natural rubber on top and outer sides. Mat- Rubber, colour-white. No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) OD 750mm; ID 450 mm , width - 350 mm
026 Tyre Fender securing arrangement Tyre fender to be secured with 16 mm dia chain on head, stern and ship side (a) Securing chains: 16mm dia(Mat-GI)
026 Tyre Fender securing arrangement Tyre fender to be secured with D shackles on ship side (b) D Shackles 16 mm dia(Mat-GI)
026 Tyre Fender securing arrangement Securing chain is to be passed through metallic sleeves inserted into the tyre fenders (c) Securing sleeves of dia 03 inch and length 250 mm (Mat MS pipe of 06mm thick)
026 Tyre Fender securing arrangement Tyre fenders securing eye plates to bo be welded along ships side for connecting of securing chains (d) Eye plate thickness 8 mm. (Mat - MS)
027 Bulwark (a)Bulwark at various places dented/damaged. To be included in hull in survey and renew as per survey report. Thickness-6 mm
027 Bulwark coaming (b) Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renewed as per survey report. Dia 3 " Mat : MS
028 Rubber beading. Rubber beading of hatches at various places perished/crackedto be renewed and chalk test to be proved. As per NCD 5904 (a) Tensile strength Kg/cm2 (min %) 70 (b) Elongation at break (min %) 350 (c) Hardness shore A 50+/-5 ) hatch -11 nos
029 Wire mesh SS Wire mesh and MS flaps of engine room exhaust opening corroded and broken. To be renewed. (Size of opening :01 m x 0.5 m)
030 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Void spaces
031 Vertical guide roller Vertical guide roller jameed to be overhaulde for free opertioan (Size-28 mm). Mat : MS
032 WT hatches (b) Hatch clips including spring mechanism at various places jammed , to be lubricated including washer and fitted back
033 Ventilation Mushroom type ventilators on weather deck jammed ,to be removed, cleaned/ overhauled and fitted beck. (a) 200 mm dia
033 Ventilation Mushroom type ventilators to be removed, cleaned/ overhauled and fitted back. Renew if required. (b) 400 mm, Height-800 mm
033 Ventilation Supply vent trunks on weather deck jammed ,to be removed, cleaned/ overhauled and fitted beck. Dia:360 mm (c) 360mm dia
034 Breather pipe and goose neck Breather pipe including support brackets and toogle on weather deck perished/damage.To be renewed
035 Duct flap Duct flap including gasket and toogle on weather deck perished/damage.To be renewed
036 Drainage System MS Scupper lips with rubber packing corroded/thinned/holed, to be renewed at ship side
037 Extinguishers Provision of following extinguishers to be undertaken (a) 9 Ltr AFFF extinguisher
037 Extinguishers Provision of following extinguishers to be undertaken (b) 2 Kg CO2 Extinguisher
037 Extinguishers Provision of following extinguishers to be undertaken (c) 10 Kg DCP extinguisher
038 FF items/Extinguishers Provision of following fire hoses to be undertaken Fire hoses length 15 mtr dia 63 mm with end coupling of AL
039 Guard Rails Guard rails pipe damaged/ perished at Bridge deck. To be renewed. Material - GI Pipe .
040 Stanchion (a) Stanction on upper deck damaged/deformed at various loactions. To be repaired/renewed. Size- H - 970 mm and dia - 50 mm Mat- GI pipe
040 Stanchion (b) Securing chain between stanchions on upper deck damaged. To be renewed. Mat - MS, Size - 5 mm dia
041 Name board Following Tug name board perished/damaged, to be renewed/repaired. a) Painting of vessel name on bulwark in both Hindi and English at stem and stern with fluorescent paint
041 Name board Following vessel name board perished/damaged, to be renewed/repaired. b) Illuminated name board with Perspex sheet - 01
042 Foundation Foundation of deck machinery / deck fittings corroded/thinned/perished , to be renewed as per survey report
043 Lagging Lagging at indicated places to be removed to facilitate structural repairs and to be renewed with new lagging post completion of repairs.mat-ss
044 Manhole (a) Manhole covers corroded/ thinned To be renewed as per survey report Mat - IS 2062 Grade 'B' steel. Size - 2' X 1.5'
044 Manhole (b) Rubber joints deterioted, to be renewed
044 Manhole (c) Studs of manholes corroded, to be renewed. Only defective studs which are found defective on survey to be renewed. MS Studs/Nut bolt with nut, size 20 mm
045 GRP Poles (a) GRP poles damged/holed to be renwed/repaired , as per survey approx height -07 mtr
046 Buonancy foam (a) Facilate removel of buonancy foam from void spaces .
046 Buonancy foam (b) Provision of Buonancy foam in the void space as per requirment, size of the block- 20incx20inchx 20 inch
047 Rope mesh Rope mesh deterioted/torned , to be renewed size 10x20
048 vertical ladder Extension of vertcal ladder for safe movement inside the fwd and aft store
049 Raised step MS raised step on wt hatches corroded/thinned /holed to be renwed/repired as per survey reports
050 D fenders (a) D fenders to be removed, inspected and surveyed and necessary repairs to be attended on fender securing brackets(C Channel) and associted hull. Note : Quote for Fenders only. Services covered under serial D
050 D Fenders (b) D Fenders to be renewed as per sample with BLACK fenders. Specification - EPDM rubber as per NES 170, D fenders Size--D Fender 250x250x1000mm
050 D Fenders (c) Replace the fender and secure with proper nut, bolt and washers as per sample. Nut & Bolt Dia -20 mm, bolt Length-370 mm, Washer dia-22mm (Note: QUOTE FOR NUTS BOLTS AND ASSOCIATED ACCESSORIES ONLY).
050 D Fenders (d) D Fenders securing c channel corroded/thinned /holed to be renewed as per survey report , ms palte thickness 8 mm. Note : Quote for Services only materials covered under Sl-(a), (b) and (c)
ENGINNERING DL FOR BPT-2 1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA Firm not to quote
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (i) 1000 hourly routine is to be carried out on DG inclunding following jobs.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA Carry out visual examination of engine for Cleanliness and leakages if any, rectify them.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA Carry out visual examination of engine for Cleanliness and leakages if any, rectify them. (a) Replace all v belts
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (b) Check valve clearance and adjust if reqd.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (c)Check turbo charger for abnormal sound if any.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (d) Change centrifuge filter and Replace it with sealing kit..
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (e)Change engine oil.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (f)Replace duplex lube oil filters.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (g)Replace element of dry type air filter.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (h)Replace duplex fuel filters
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA (i)Change joint of rocker cover
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA ((k)Replace coolant
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA ((l)carry out perfomance trial post work completion.
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA ((m) Remove and Clean fresh water cooler and carry out pressure testing.Renew gasket & 'o' rings
1001 EQPT: HARBOUR DIESEL GENERATOR, MAKE: M/s KOEL ,MODEL: 4R1040T, 50 KVA ((n) Remove and Clean lub oil and cooler carry out pressure testing.Renew gasket & 'o' rings NOTE:-above repairs/ routines to be undertaken by OEM/ authorised firms of OEM
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE Firm not to quote
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE (a) Carry out overhauling of Pump and renew parts if equired:-Dismantle pump completely. Examine all parts for wear. Renew shaft, Drive and idler Gears, mechanical seal, bearing, bearing bracketr, bearing bushes, shaft sleeve, keys, gaskets, rubber bellow,air wheel including coupling and guard.
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE (b) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE (c) Overhaul & reset relief valve.(set pr.-5Kg/cm2)
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE (d) Coupling/Belt Guard to be renewed / Manufactured
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE (e) Renew needle valve. Mat-1/4"
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE (f) Suction &discharge presure gauges to be renewed.range 30"-0" &0-100psi
1002 DD fire pump, Make:-YANMAR , Model:- DC8Y-DE (g) Carry out alignment of pump with engine &prove for satisfactory performance.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 Firm not to quote
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 Overhaul the engine and renew worn out parts including following jobs:- (a) Carry out tappet setting of valves,injector.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (b) Remove injector& caliberate the same.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (c) Drain Lub oil sump, Clean and charge new oil.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (d) Renew air filter element, fuel filter element, and lub oil filter element.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (e) Replace the cylinder head gaskets.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 f) Renew all rubber hoses,durrets.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (g) Renew insulation/lagging of the exhaust pipe .
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (h) Renew the fuel wire weired hoses.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (i) Check for any lekages,if found same to be rectify.
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (j) Exhaust line insulation to be renewed
1003 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKARI,CAPACITY-30CU.M/HR@80BAR,MODEL-MARINE DUTY EXPLOSION TYPE,SL NO:-15756/15757 (k) Engine to be proved for satisfactory performance post work completion.
1004 EQPT : VALVES Following valves to be overhauled, repaired and pressure tested. Up to 1.5 times working pressure. Job includes renewal of 10% BER valaves if any.
1004 EQPT : VALVES (a) Gate Valves, 50 mm
1004 EQPT : VALVES (b) SD vv, 32 mm
1004 EQPT : VALVES (c) SD vv, 80 mm
1004 EQPT : VALVES (d) Gate Valves, 80 mm
1004 EQPT : VALVES e) SD vv, 28 mm
1004 EQPT : VALVES (f) SD vv, 40 mm
1004 EQPT : VALVES g) SD angle valve, 40 mm
1004 EQPT : VALVES (h) Fire hydrant valve, 50 mm
1004 EQPT : VALVES (i) SDNR valve, 65 mm
1004 EQPT : VALVES (j) SD valve, 25 mm
1005 FIREMAIN SYSTEM
1005 FIREMAIN SYSTEM (a) Fire hydrant coupling, 65 mm
1005 FIREMAIN SYSTEM (b) Hose basket to be renewd
1006 Semi Rotary Hand Pump to be Overhauled Make-VENUS,Model-N97
1006 Semi Rotary Hand Pump to be Overhauled Make-VENUS,Model-N97 (a) Pump to be overhauled includes renewal of wear down parts.
1006 Semi Rotary Hand Pump to be Overhauled Make-VENUS,Model-N97 (b) Wooden handled to be renewed.
1007 Following System Pipe to be removed,chemically cleaned,Pr tested and fitted back, Mat- Cu Ni
1007 Following System Pipe to be removed,chemically cleaned,Pr tested and fitted back, Mat- Cu Ni (a) Fire Main System pipe Dia 80 mm,Test pr-05 bar
1007 Following System Pipe to be removed,chemically cleaned,Pr tested and fitted back, Mat- Cu Ni (b) DG Engine cooling line Dia 65 mm, Test pr-06 bar
1007 Following System Pipe to be removed,chemically cleaned,Pr tested and fitted back, Mat- Cu Ni (c) Dia 32 mm, Test pr-05 bar
1007 Following System Pipe to be removed,chemically cleaned,Pr tested and fitted back, Mat- Cu Ni (d) Dia 25 mm, Test-04 bar
1008 Windlass system Firm not to quote
1008 Windlass system (a) windlass gear box to be opened for inspection
1008 Windlass system (b) leakage observed from windlass level gauge indicator, leakage to be rectified
ELECTRICAL WORK PACKAGE General:All electrical power components / spares like contactors, overload relays, etc are to to be sourced from Navy approved vendors.
IMPORTANT NOTE:- Following points are applicable for all relevant DL's and shipyards/Firms to consider and quote accordingly. (a) Renewal of Items / Spares:- (i) Renewal of items / spares wherever mentioned in the QDL to be undertaken by shipyard / firm as per the sample / drawing / details provided by SS / COA / RMT. (ii) Shipyard / Firm should undertake the routines / overhaul of the equipment including the mandatory spares required for undertaking the same, irrespective of the spares mentioned in the mandatory spares list provided by ND(V). (iii) Further, the cost should include the degutting of existing item, supply of new item, fitment and proving of the system post renewal.
The definition of overhaul of Motor / Alternator includes the following:- (a) Dismantle the motor / Alternator. The motor has to be dismantled and landed by Yard for overhauling. (b) Undertake trueness checks of rotor on the lathe. Repair observed Defects (c) Check for ovality in bearing housing. Repair observed Defects. (d) Clean the rotor and stator thoroughly with alcohol, air, varnish and bake. There should be no dust particles or other foreign particles observed after cleaning (e) Measure the insulation of windings of rotor and stator. In case insulation is below one mega ohm rewind the rotor / stator (f) Replace heater and thermistor units. (g) Assemble the motor / Alternator with new bearings if required. (h) In case of repairs to shaft trueness or replaced of winding,undertake dynamic balancing of the rotor (j) Check and rectify phase imbalance in insulation of windings (k) Undertake test bed Trials and confirm no load starting and running currents, speed, SPM readings apart from other standard checks. SPM reading are to be in green zone post overhaul. (l) All motors / Alternators and machinery body/ cabinets to be painted as per the original colur. (m) Brass Marking talleys to be provided for all equipment( 8x2 cms)- Qty 800 nos apprx total. (n) Wiring/ cabling which are removed during gutting/ degutting to be re wired whereever applicable. (p) All motors with monoblock pumps are to be proved in situ. (q) All terminal boxes rubber beading to be replaced to achieve water tight integrity.
The definition of overhaul of Starter includes the following:- (a) Dismantle the starter. The starter has to be dismantled and landed by Yard for overhauling. (b) Disconnect & Remove all components & wiring. (c) Mechanical cleaning of starter panel board,welded/repaires of any damages to the body/door hinges & painted with one cote of primer and two coat of powder coating (original colour) d) cleaning of all connections,internal components with cleaning agents. e)calibration of OLRs./Timer relays. f)Refixing all components & given the all internal connections g)check the circuitary functionality & rectify if any fault. h)Check the insulation between the phases,phase to body & improve the insulation if it is less than 5M ohms. i)Refixed in onboard & given the all connections. j)Take load trails after give the power supply.
The definition of overhaul of control panels includes the following:- (a) Dismantle the control panel. The control panel has to be dismantled and landed by Yard for overhauling. (b) Disconnect & Remove all components & wiring. (c) Mechanical cleaning of control panel board,welded/repaires of any damages to the body/door hinges & painted with one cote of primer and two coat of powder coating (original colour) d) cleaning of all connections,internal components with cleaning agents. e)calibration of OLRs,Timer relays. f)calibration of PCBs,sensors,diod rectifiers&etc. g)rifixing all components & given the all internal connections h)check the circuitary functionality & rectify if any fault. i) check the insulation between the phases,phase to body & improve the insulation if it is less than 5M ohms j)refixed in onboard & given the all connections. k)Take load trails after give the power supply.
Following 'As Fitted' drawings need to be prepared and handed over to ships staff (a) Foundations of new equipment (b) Electrical cabling (c) All As and A's including internals of control panel (Hull, Engineering & Electrical). (d) ABER replacement (Hull, Engineering & Electrical ).(Firm Not To Quote)
2001 : Eqpt/System: MAIN SWITCH BOARD Make : Marine Electrical, RATING: 415V,3PH,50HZ Located in E/R 01 no Switch board with two 3 Ph bus bar with three incomeing feedrs from two DAs. & shore supply And these three are electrically interlocked & connected to the commen bus bar in swbd. Make L&T Firm Not To Quote
2001 : Eqpt/System: MAIN SWITCH BOARD (a) MSB to be overhauled (includes defective switches to be renwed, indiacation lamp to be renewed,perished control wiring to be renewed with crimping of proper lugs, marking sleeves to be put on control wiring and loose wirng to be tied with cable ties)
2001 : Eqpt/System: MAIN SWITCH BOARD (b) Calibrate the following meters
2001 : Eqpt/System: MAIN SWITCH BOARD b1) Ammetrers 0-100A
2001 : Eqpt/System: MAIN SWITCH BOARD (b2) Volt meters 0-500V-1No,0-300V-1no
2001 : Eqpt/System: MAIN SWITCH BOARD b3) Frequncy meter 45-50-55Hz
2001 : Eqpt/System: MAIN SWITCH BOARD b4) Insulation meter
2001: Eqpt/System: MAIN SWITCH BOARD b5) KW meter 0-50Kw
2001 : Eqpt/System: MAIN SWITCH BOARD (c ) Renewal of following meters (Firm Not To Quote)
2001 : Eqpt/System: MAIN SWITCH BOARD (c ) (i) Ammeter : 415V AC, with moving coil Rect scale :240, Input Mode CT operated, CT ratio 150/5A, Accuracy class 1, Range 0-100A, Red Mark at 63A, Size : 96x96mm, Gasket Required
2001 : Eqpt/System: MAIN SWITCH BOARD (c ) (ii) KW meter : with moving coil Rect scale :240, Input voltage 415V AC, Syatem : 3 wire 2 element, Input current : 5A, Range 0-50KW, Red Mark at 36KW, Size : 96x96mm,Gasket Required
2001 : Eqpt/System: MAIN SWITCH BOARD (c ) (iii) Frequency Meter : Input voltage415VAC, Analog type, scale :240, Accuracy class 1, Range 45-50-55Hz Size : 96x96mm, Gasket Required.
2001 : Eqpt/System: MAIN SWITCH BOARD (d) Volt meters 0-500V Make AE/Rishab
2001 : Eqpt/System: MAIN SWITCH BOARD (e ) Rubber mat : Insulating Rubber Mat deteriorated. To be Renewed with high voltage Electrical rubber mat in front of MSB.(Thickness- 3mm) Make : vardhaman, model : class c
2002 Eqpt/System: Control Panels The following Control Panels are to be over hauled, defctive components to be replaced with new one & made them operational. (Firm Not To Quote)
2002 Eqpt/System: Control Panels (a) Anchor windlass control panel including master controller 415V,3Ph,50Hz, 12.5HP .Size:17.5mm Dia Chain; Make: Hemant Engineering Works
2002 Eqpt/System: Control Panels (b) Group Starters panel (it was consisting of 8 in nos DOL starters) located in MSB room
2002 Eqpt/System: Control Panels (c ) Navigational lights control panel.Located in MSB room)
2003 Eqpt/System: Navigational Lighting Power supply and alarm modules (230V AC & 24V DC) Make:Marine Electrical. Carryout routines mentioned below and prove them for satisfactory performance (Firm Not To Quote)
2003 Eqpt/System: Navigational Lighting Power supply and alarm modules (230V AC & 24V DC) (a) Check the functions of all fuse units-10nos,control cards (fault detection moduels)-5nos, indication lamps-15nos & horn-1no.
2003 Eqpt/System: Navigational Lighting Power supply and alarm modules (230V AC & 24V DC) (b) If deffective repair them
2003 Eqpt/System: Navigational Lighting Power supply and alarm modules (230V AC & 24V DC) (c ) Check and repair the control cards and prove for satisfactory performance
2004 Eqpt/System:Navigational Light fittings. (Firm Not To Quote)
2004 Eqpt/System:Navigational Light fittings. (a) Overhauling the Navigational Light Fittings(AC) Make:M/S Arvin Industries 230V for AC,(Two tier set) .
2004 Eqpt/System:Navigational Light fittings. (b) Overhauling the Navigational Light Fittings(AC) Make:M/S Arvin Industries 230V for AC,(single tier set) .
2004 Eqpt/System:Navigational Light fittings. (c ) Renew the incoming cable 2core,1.5sq.mm,Length-.20rmtrs for each fitting from switch socket to light fitting-4Nos fittings located at FWD & AFT
2004 Eqpt/System:Navigational Light fittings. (d ) The navigational light cable are run through 2" dia 2mm thickness GI pipe from switche to light point at FWD & AFT
2004 Eqpt/System:Navigational Light fittings. (e ) Renew the AC navigational bulbs 230V,60w
2004 Eqpt/System:Navigational Light fittings. (f) Navigational light switch boxes (2nos) are to required to renew with stainless steel material due present boxes are corroded
2005 Eqpt/System:Light fittings (Firm Not To Quote)
2005 Eqpt/System:Light fittings a) Repair the flood light LED lamp fittings 200W,230V AC
2005 Eqpt/System:Light fittings (b) If Unrepairable replace the flood light LED lamp fittings 200W,230V AC Make:Sysca
2005 Eqpt/System:Light fittings (c) Replace the 2X20W,2" industrial tube light fitting shade covers.
2006 Eqpt/System:invertor input supply 1) AC 3ph 415V, 2) DC 360V & output supply AC 3ph,415V
2006 Eqpt/System:invertor input supply 1) AC 3ph 415V, 2) DC 360V & output supply AC 3ph,415V a) carryout overhauling routines,servicebilty checks & prove it operational.
2007 Eqpt/System: Shore Supply Box. Make:L&T,100amps,415V,3ph
2007 Eqpt/System: Shore Supply Box. Make:L&T,100amps,415V,3ph a)Carryout routines mentioned below and prove them for satisfactory performance
2007 Eqpt/System: Shore Supply Box. Make:L&T,100amps,415V,3ph (b) Renew the indication lamps with holders
2007 Eqpt/System: Shore Supply Box. Make:L&T,100amps,415V,3ph (c ) Renew the window glass 5mm thicknes for s/s panel door size 15"X6"
2007 Eqpt/System: Shore Supply Box. Make:L&T,100amps,415V,3ph (d ) Mechanical cleaning of supply panel board & painted with one cote of primer and two coat of powder coating (original colour)
2007 Eqpt/System: Shore Supply Box. Make:L&T,100amps,415V,3ph (e ) Renewal of Phase Sequence Indicator with arrow mark rotating indicator. 415V 3Phase, 50 Hz
2007 Eqpt/System: Shore Supply Box. Make:L&T,100amps,415V,3ph (f) Renewal of shore suppply cable 3x50 sqmm, rubber insulated, Copper multi stranded wire marine cable with terminals are to be lugging (lug hole size 20mm dia)
2008 Eqpt/System: Wall mounted Electrical fans (Oscillating) (a) Repair the fans fitted at various places and prove them for satisfactory performance
2008 Eqpt/System: Wall mounted Electrical fans (Oscillating) (b) If unrepairable renew the fans and prove them for satisfactory performance Make:C&G, Type- 400 mm Sweep:
2009 Eqpt/System: Lead Acid Batteries. Make:Exide,180AH,12V
2009 Eqpt/System: Lead Acid Batteries. Make:Exide,180AH,12V (a) Renew the maintenance free battery 180AH 12V Make:Exide.
2009 Eqpt/System: Lead Acid Batteries. Make:Exide,180AH,12V (b ) Renew the Parallel link cable connectors in emergency batteries bank
2009 Eqpt/System: Lead Acid Batteries. Make:Exide,180AH,12V (c ) serviceability checks of Electrolyte free exide power safe 52AH,2V cells
2009 Eqpt/System: Lead Acid Batteries. Make:Exide,180AH,12V (d) Renew the Electrolyte free exide power safe 52AH,2V cells along with link connectors & cabinets (Each cabinate is accomidate 6 in nos cells)
2010 Eqpt/System: Battery chargering Unit, Input;240V, 1ph, 50Hz. Out put 24V/12V 42A DC (1.0KW-1no)
2010 Eqpt/System: Battery chargering Unit, Input;240V, 1ph, 50Hz. Out put 24V/12V 42A DC (1.0KW-1no) (a) One in no1.0 kw 1ph 230V AC as input & 24V/12V,DC as out put charger unit to be provide. ( Along with make neccesary cabling work to be done) and to be made operational
2010 Eqpt/System: Battery chargering Unit, Input;240V, 1ph, 50Hz. Out put 24V/12V 42A DC (1.0KW-1no) b) 2 in nos Multi stand copper cable 1core 20sq.mm cable to be laying inside of GI pipe (2" dia 2mm thickness) between stbd & port DG rooms
2010 Eqpt/System: Battery chargering Unit, Input;240V, 1ph, 50Hz. Out put 24V/12V 42A DC (1.0KW-1no) (c ) provide the changeover DP MCB 60A,installe,make connection & prove it operational at STBD DG room
2010 Eqpt/System: Battery chargering Unit, Input;240V, 1ph, 50Hz. Out put 24V/12V 42A DC (1.0KW-1no) (d) provide the changeover DP MCB 100A,installe,make connection & prove it operational at STBD DG room
2010 Eqpt/System: Battery chargering Unit, Input;240V, 1ph, 50Hz. Out put 24V/12V 42A DC (1.0KW-1no) (e ) Provide a MCB Distribution Metal box (double door type) for fixing of DP MCBs 60A-2nos,100A-1no
2011 Eqpt/System: Cabeling
2011 Eqpt/System: Cabeling (a) side lights & horn cable to run th metal condute pipe (suitable dia)
2012 Eqpt/System:Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. (total 04 Nos) Only ZZ standard bearing (SKF/FAG) is to be used.
2012 Eqpt/System:Motors Over hauling (a) Axial Bolwers 230V,3ph,50Hz,2HP,
2012 Eqpt/System:Motors Over hauling (b) Anchor wind loss motors 3Ph,415V 12.5HP
2013 Eqpt/System:Electrical horn 24V DC, MEGASONIK Renew the Marine Electrical Horn (Dual trumpet electric horn ,100% Stainleass Steel housing,304 non magnetic grade with rust proof bright polished finish for using exterior in salt water environment 24V DC, DB level 120dB) fitted on deck near by shore supply box.
2014 Eqpt/System : DG Primemover (ENGINES) Electrical Control System MAKE : Kirloskar oil india ltd, MODEL-4R 1040 T, SL NO:-Port DG:- 4H.8601/1500005 Stbd DG:- 4H.7003/1500001 OUT PUT-45KVA@1500RPM (Carried out by OEM only) (routine may be carried out with assistance of OEM or authorised Rep)
2014 Eqpt/System : DG Primemover (ENGINES) Electrical Control System (a) Control panel system,pressure switches,sensers and relays to be checked,rectification of faults,calibrated & to be proved for satisfactory operation
2014 Eqpt/System : DG Primemover (ENGINES) Electrical Control System (b) Renew the Fresh water temperature sensors 24V Dc
2014 Eqpt/System : DG Primemover (ENGINES) Electrical Control System c ) Overauling the Engine self starting motors.24V,DC
2014 Eqpt/System : DG Primemover (ENGINES) Electrical Control System (d) Overauling the Engine driven battery charger alternator .24V,DC
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM Carryout routines mentioned below and prove them for satisfactory performance.(routine may be carried out with assistance of OEM or authorised Rep).
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM (a)overhaul the generators/alternator
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM (b) Check the insulation of Alternator with 500V Megger. The insulation resistance should not be less than 2 mega ohm. If less isolate the system and improve the insulation. Check inductance and capacitance of the alternator winding.
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM (c ) Inspection of Lugs, clean the lugs with zero paper and replace if damaged.
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM (d) Check the condition of all sealing of the alternators, repaired if required.
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM (e ) Check the rotating rectifier assembly for any loose connection and check proper connection.
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM (f) Take SPM reading of DE/NDE bearing of alternators; carry out greasing by grease gun if required (yellow zone).
2015 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,45KVA,50Hz,1500RPM (g) Renew the AVR (Aumatic Voltage Regulator) Model:MX 321
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
ASMACS
Sadhav Offshore Engineering Company
WINTECH ENGINEERING WORKS
Patel Engineering Works Vizag
ULTRA MARINE
SEABLUE SHIPYARD LTD
YEOMAN MARINE SERVICES PVT. LTD.
ASHA ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .