Loading…
Loading…
Tender ID
Tender Value
₹12.7 L
EMD Value
₹15,870
Closing Date
16 Mar 2026, 5:30 pmClosed
Karnataka Power Transmission Corporation Limited
Kumar M
Conducting detailed survey for Construction of MC Line from existing 220kV Vajamangala-TK Halli line to proposed 220kV T.Narasipura R/s and construction of associated 66kV Lines emanating from proposed 220kV T.Narasipura R/s in T Narasipura Taluk, Mysuru District
KPTCL/2025-26/SE2347
KPTCL/2025-26/SE2347
Open
Electronic Documents, First(One Cover)
KPTCL SEE Works and Mantainance Circle Mysuru
10 documents required · 10 mandatory
₹500
₹15,870
16 Mar 2026
7 Mar 2026
2 Mar 2026
KARNATAKA POWER TRANSMISSION CORPORATION LTD.,
Transmission (Projects) KPTCL, Mysore
Conducting detailed survey for Construction of MC Line from existing 220kV Vajamangala-TK Halli line to proposed 220kV T.Narasipura R/s and construction of associated 66kV Lines emanating from proposed 220kV T.Narasipura R/s in T Narasipura Taluk, Mysuru District using Modern survey Techniques
NOTE :- Fill in Blue Coloured Cells and upload Annexure:-A
Bid Enquiry: SEE/T(Proj)Circle/Mys/EE(O)/AE-3/2025-26/220kV T.Narasipura/04 Dtd: 16.02.2026
The tenderer shall upload all documents in support of the information mentioned hereunder. This information will not be incorporated in the Contract. Failure to upload the documents mentioned hereunder will be liable for rejection of the tender.
Details of the Tenderer
1 Name of the Tenderer :
2 Address of the Tenderer :
3 Name of the Proprietor / Contact Person :
4 Mobile No./Phone No. :
7 Class of Empanellement & Validity of Empanellement
7 Good and Service Tax Registration No. or Code
8 E.P.F. No. or Code :
11 No. of Survey Works carried out using Modern Survey Technique :
13 Rubber Stamp of the Firm / bidder
KARNATAKA POWER TRANSMISSION CORPORATION LTD.,
Transmission (Projects) KPTCL,, Mysore
Conducting detailed survey for Construction of MC Line from existing 220kV Vajamangala-TK Halli line to proposed 220kV T.Narasipura R/s and construction of associated 66kV Lines emanating from proposed 220kV T.Narasipura R/s in T Narasipura Taluk, Mysuru District using Modern survey Techniques
Bid Enquiry: SEE/T(Proj)Circle/Mys/EE(O)/AE-3/2025-26/220kV T.Narasipura/04 Dtd: 16.02.2026
NOTE :- Fill in Blue Coloured Cells and upload Annexure:-B
1) The tenderer shall upload all documents in support of the information mentioned hereunder. This information will not be incorporated in the Contract. Failure to upload the documents mentioned hereunder will be liable for rejection of the tender. 2) Details of surveying and geo-technical investigation works carried out for engineering projects as Prime Contractor (in the same name) to State / Central Government Departments/ Organizations, Public sector/ Companies during the five years.
Details of Experiences
Sl. No Name of the organization Name of the project Total Contract value (Rs. in lakhs) Contract period
Rubber Stamp of the Firm / bidder
KARNATAKA POWER TRANSMISSION CORPORATION LTD.,
Transmission (Projects) KPTCL, Mysore
Conducting detailed survey for Construction of MC Line from existing 220kV Vajamangala-TK Halli line to proposed 220kV T.Narasipura R/s and construction of associated 66kV Lines emanating from proposed 220kV T.Narasipura R/s in T Narasipura Taluk, Mysuru District using Modern survey Techniques
Bid Enquiry: SEE/T(Proj)Circle/Mys/EE(O)/AE-3/2025-26/220kV T.Narasipura/04 Dtd: 16.02.2026
NOTE :- Fill in Blue Coloured Cells and upload Annexure:-C
1) The tenderer shall upload all documents in support of the information mentioned hereunder. This information will not be incorporated in the Contract. Failure to upload the documents mentioned hereunder will be liable for rejection of the tender. 2) Details of surveying and geo-technical investigation works carried out for engineering projects as Prime Contractor (in the same name) to State / Central Government Departments/ Organizations, Public sector/ Companies during the five years.
(A) Existing commitments and on-going works:
Sl. No. Name of the organization Name of the project Total Contract value (Rs. in lakhs) Balance Contract period
(B) Works for which Tenders already submitted:
Sl. No. Name of the organization Name of the project Amount put to tender (Rs. in lakhs) Contract period
Rubber Stamp of the Firm / bidder
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Bid Enquiry: SEE/T(Proj)Circle/Mys/EE(O)/AE-3/2025-26/220kV T.Narasipura/04 Dtd: 16.02.2026
Conducting detailed survey for Construction of MC Line from existing 220kV Vajamangala-TK Halli line to proposed 220kV T.Narasipura R/s and construction of associated 66kV Lines emanating from proposed 220kV T.Narasipura R/s in T Narasipura Taluk, Mysuru District using Modern survey Techniques
NOTE :- Fill in Blue Coloured Cells and upload Annexure:-D
The tenderer shall upload all documents in support of the information mentioned hereunder. This information will not be incorporated in the Contract. Failure to upload the documents mentioned hereunder will be liable for rejection of the tender.
SLNo. Particulars Financial Year Total Financial TurnOver Amount (Rs.) Total Financial TurnOver only in all types of surveying / geo-technical investigation / consultancy works Amount (Rs.)
1 Annual Financial turn over for the years. Upload Certificate certified by Chartered Accountant Year(1) 2020-21
Place Seal of the Firm
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
Estimate for CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 220kV LILO LINE USING AAAC MOOSE CONDUCTOR FROM THE EXISTING 220KV VAJAMANGALA-T.K HALLI DC LINE TO THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA FOR A DISTANCE OF ABOUT 15 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. The rates include walk over/reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8 km in case of 400 kV Line upto 5 km in case of 220 kV Line upto 3 km in case of 110 kV Line, upto 2 km in case of 66 kV Lines and upto 1 km in case of 33 kV Lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms. 15 4235.00 63525.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 15 17061.00 255915.00
3 Sub Total 319440.00
4 GST @ 18% on Sub Total 57499.2
5 Missellaneous for rounding off 3060.80
Report: - This estimate amounting to Rs. 3,80,000/- (Rupees Three Lakh Eighty Thousand only) is prepared for CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 220kV LILO LINE USING AAAC MOOSE CONDUCTOR FROM THE EXISTING 220KV VAJAMANGALA-T.K HALLI DC LINE TO THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA FOR A DISTANCE OF ABOUT 15 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT.
The above work has been approved in 86th TCCM held on 29.06.2021.Hence to CONDUCT Detailed survey this estimate has been prepared.
Certificate:- Certified that, I have personally visited the spot and prepared estimate in most economical and safe way of executing the works using present Major Works COMMON SCHEDULE OF RATES 2023-24.
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 220kV LILO LINE USING AAAC MOOSE CONDUCTOR FROM THE EXISTING 220KV VAJAMANGALA-T.K HALLI DC LINE TO THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA FOR A DISTANCE OF ABOUT 15 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. The rates include walk over/reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8 km in case of 400 kV Line upto 5 km in case of 220 kV Line upto 3 km in case of 110 kV Line, upto 2 km in case of 66 kV Lines and upto 1 km in case of 33 kV Lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms. 15 4235.00 63525.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 15 17061.00 255915.00
3 Sub Total 319440.00
4 GST @ 18% on Sub Total 57499.2
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS WORKS DIVISION, MYSURU
ESTIMATE FOR CONDUCTING DETAILED SURVEY FOR CONVERSION OF EXISTING 66kV EXISTING SC LINE TO DC LINE FROM 66kV GARGESHWARI TO 66kV THAYUR SUB-STATION WITH COYOTE CONDUCTOR ALONG WITH ONE NUMBER OF 66kV TB EACH AT GARGESHWARI AND THAYUR SUBSTATION FOR A DISTANCE OF 15kMS using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 15 3993.00 59895.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 15 16214.00 243210.00
3 Sub Total 303105.00
4 GST @ 18% on Sub Total 54558.9
5 Missellaneous for rounding off 2336.10
Report: - This estimate amounting to Rs. 3,60,000/- (Rupees Three Lakh Sixty Thousand Rupees only) is prepared for CONDUCTING DETAILED SURVEY FOR CONVERSION OF EXISTING 66kV EXISTING SC LINE TO DC LINE FROM 66kV GARGESHWARI TO 66kV THAYUR SUB-STATION WITH COYOTE CONDUCTOR ALONG WITH ONE NUMBER OF 66kV TB EACH AT GARGESHWARI AND THAYUR SUBSTATION FOR A DISTANCE OF 15kMS using Modern survey Technique.
The above work has been approved in 86th TCCM held on 29.06.2021.Hence to CONDUCT Detailed survey this estimate has been prepared.
Certificate:- Certified that, I have personally visited the spot and prepared estimate in most economical and safe way of executing the works using present Major Works COMMON SCHEDULE OF RATES 2023-24.
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS WORKS DIVISION, MYSURU
CONDUCTING DETAILED SURVEY FOR CONVERSION OF EXISTING 66kV EXISTING SC LINE TO DC LINE FROM 66kV GARGESHWARI TO 66kV THAYUR SUB-STATION WITH COYOTE CONDUCTOR ALONG WITH ONE NUMBER OF 66kV TB EACH AT GARGESHWARI AND THAYUR SUBSTATION FOR A DISTANCE OF 15kMS using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 15 3993.00 59895.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 15 16214.00 243210.00
3 Sub Total 303105.00
4 GST @ 18% on Sub Total 54558.9
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV MC LINE ON 110KV DC TOWER USING COYOTE CONDUCTOR FROM PROPOSED 220kV T.NARASIPURA STATION TO DC LILO THE 66kV GARGESHWARI-THAYUR DC LINE FOR A DISTANCE OF ABOUT 10 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 10 3993.00 39930.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 10 16214.00 162140.00
3 Sub Total 202070.00
4 GST @ 18% on Sub Total 36372.6
5 Missellaneous for rounding off 1557.40
Report: - This estimate amounting to Rs. 2,40,000/- (RupeesTwo Lakh Forty Thousand only) is prepared forCONSTRUCTION OF PROPOSED 66kV MC LINE ON 110KV DC TOWER USING COYOTE CONDUCTOR FROM PROPOSED 220kV T.NARASIPURA STATION TO DC LILO THE 66kV GARGESHWARI-THAYUR DC LINE FOR A DISTANCE OF ABOUT 10 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
The above work has been approved in 86th TCCM held on 29.06.2021.Hence to CONDUCT Detailed survey this estimate has been prepared.
Certificate:- Certified that, I have personally visited the spot and prepared estimate in most economical and safe way of executing the works using present Major Works COMMON SCHEDULE OF RATES 2023-24.
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV MC LINE ON 110KV DC TOWER USING COYOTE CONDUCTOR FROM PROPOSED 220kV T.NARASIPURA STATION TO DC LILO THE 66kV GARGESHWARI-THAYUR DC LINE FOR A DISTANCE OF ABOUT 10 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 10 3993.00 39930.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 10 16214.00 162140.00
3 Sub Total 202070.00
4 GST @ 18% on Sub Total 36372.6
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
Estimate for CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV SC LINE ON 110KV DC TOWER USING COYOTE CONDUCTOR BY LILOING OF 66kV TALAKADU - PARINAMIPURA SC LINE FROM THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA FOR A DISTANCE OF ABOUT 15 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 15 3993.00 59895.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 15 16214.00 243210.00
3 Sub Total 303105.00
4 GST @ 18% on Sub Total 54558.9
5 Missellaneous for rounding off 2336.10
Report: - This estimate amounting to Rs. 3,60,000/- (Rupees Three Lakh Sixty Thousand only) is prepared forCONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV SC LINE ON 110KV DC TOWER USING COYOTE CONDUCTOR BY LILOING OF 66kV TALAKADU - PARINAMIPURA SC LINE FROM THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA FOR A DISTANCE OF ABOUT 15 KMS IN T.NARASIPURA TALUK MYSURU.
The above work has been approved in 86th TCCM held on 29.06.2021.Hence to CONDUCT Detailed survey this estimate has been prepared.
Certificate:- Certified that, I have personally visited the spot and prepared estimate in most economical and safe way of executing the works using present Major Works COMMON SCHEDULE OF RATES 2023-24.
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV SC LINE ON 110KV DC TOWER USING COYOTE CONDUCTOR BY LILOING OF 66kV TALAKADU - PARINAMIPURA SC LINE FROM THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA FOR A DISTANCE OF ABOUT 15 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 15 3993.00 59895.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 15 16214.00 243210.00
3 Sub Total 303105.00
4 GST @ 18% on Sub Total 54558.9
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
Estimate for CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV SC LINE ON 110KV DC TOWER USING COYOTE CONDUCTO FROM THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA TO 66kV VYASRAJPURA SUBSTATION ALONG WITH ONE NUMBER OF TB AT VYASRAJPURA SUBSTATION FOR A DISTANCE OF ABOUT 7 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 7 3993.00 27951.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 7 16214.00 113498.00
3 Sub Total 141449.00
4 GST @ 18% on Sub Total 25460.82
5 Missellaneous for rounding off 8090.18
Report: - This estimate amounting to Rs. 1,75,000/- (Rupees One Lakh Seventy Five Thousand only) is prepared for CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV SC LINE ON 110KV DC TOWER USING COYOTE CONDUCTO FROM THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA TO 66kV VYASRAJPURA SUBSTATION ALONG WITH ONE NUMBER OF TB AT VYASRAJPURA SUBSTATION FOR A DISTANCE OF ABOUT 7 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT
The above work has been approved in 86th TCCM held on 29.06.2021.Hence to CONDUCT Detailed survey this estimate has been prepared.
Certificate:- Certified that, I have personally visited the spot and prepared estimate in most economical and safe way of executing the works using present Major Works COMMON SCHEDULE OF RATES 2023-24.
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
PROJECTS DIVISION, MYSURU
CONDUCTING DETAILED SURVEY FOR CONSTRUCTION OF PROPOSED 66kV SC LINE ON 110KV DC TOWER USING COYOTE CONDUCTO FROM THE PROPOSED 220/66/11KV RECEIVING STATION AT T.NARASIPURA TO 66kV VYASRAJPURA SUBSTATION ALONG WITH ONE NUMBER OF TB AT VYASRAJPURA SUBSTATION FOR A DISTANCE OF ABOUT 7 KMS IN T.NARASIPURA TALUK MYSURU DISTRICT using Modern survey Technique.
Sl.No Description of item Units Qty Unit Rate Amount in Rs
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications, in all types of terrain. The rates includes walk over/ reconnaissance survey along the alignment of the line with collecting topographical details on either side upto 8Kms in case of 400kV line upto 5 Kms in case of 220kV line upto 3Kms in case of 110kV line and upto 2 Kms in case of 66kV lines. The output shall be in the form of digitized route alignment colour drawings with latest topographical and other details on either side of the alignment (both in hard and soft copies) and submission of preliminary survey reports in 3 set for approval of the final route alignment. Kms.
1 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, in all types of terrain. Kms. 7 3993.00 27951.00
2 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipments like DGPS/Total stations/Digital theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work, using PLS-CADD software in all types of terrains and includes the following. 1. Drawing the route profile including geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc., 2. Leveling of the profile with reference to Survey of India bench marks (MSL). 3. Tower Schedule with optimization of tower location Itower spotting. 4. Line Schedule along the Right of Way. 5. Burgie details and providing GPS, Co-ordinates at each anchor points for identification of anchor locations including permanent marks, like poles, telephones lines, buildings etc., 6.Soil resistivity along the selected route with measurement at a distance not exceeding 2Kms. 7. Route marking along the approved route with GPS Co-ordinates for all tower locations duly marking river/ road /power line /telecommunication/ railway line crossings. 8. Making 150mm dia bore holes for a depth not less than 3 mtrs or refusal strata at all tower locations in case of 400kV and 220kV transmission lines and atanchor points for 110kV and 66kV transmission lines and furnishing the bore log details for soil classification for tower foundations along with GPS Co-ordinates for each bore holes and back filling of bore holes on completion of work. 9. Digitized contouring at undulated / hilly tower locations for assessing the quantum of benching and revetment required. 10. Detailed land schedule along the Right of Way duly plotting the line corridor on the digitized Revenue village maps to show details of land along the corridor with Sy. No, and computation of estimate of land compensation for line corridor and tower foot area as per the prevailing guidance value notified by GOK. 11. Preparation of schedules for processing for statutory clearances such as PTCC proposal (30 copies), Railway crossing proposal (10 sets per crossing), Forest proposal (10 sets) in required number of copies (both hard and soft copies) as per the requirement of respective departments. 12. Tree schedule containing the details like name of tree, girth size of tree, distance from center line of the alignment, approximate height of tree etc. 13. Submission of detailed consolidated final report for surveying work done appending all the approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos / videos taken at site and submitting soft copies of all documents and hard copy of reports in 6 sets. The detailed report shall contain following approved draft reports Preliminary Report Detailed Survey Report Soil Resistivity Report Soil classification report with location wisel Tree Schedule/ Line Schedule/ Land schedule/ Burgie details/ Digitized contours/ Digitized village map geo referenced and superimposed on the line corridor. Kms. 7 16214.00 113498.00
3 Sub Total 141449.00
4 GST @ 18% on Sub Total 25460.82
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Techno Commercial 220kV TN Pura.xlsx
Techno-Commercial Worksheet • 0.03 MB
NIT Survey.docx
Tender Document • 0.05 MB
220kV TN Pura survey.xlsx
Others - Estimate • 0.06 MB
220 kV Technical Specification.docx
Tender Document • 0.05 MB
IFB ITB tender document 220kV TN Pura.docx
Tender Document • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .