Tender Value
₹5.0 Cr
EMD Value
₹5.0 L
Closing Date
19 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, R&B Division, Bhuj
Construction of Godown Building for 2000 MT Capacity for Civil Supply at Nakhatrana Dist.Kachchh.
352036
51 For 2026-27
Open
Civil Works - Buildings
Works
Kutch
13 documents required · 13 mandatory
₹12,000
Executive Engineer, R and B Division, Bhuj
₹5.0 L
5 Oct 2026
5 Oct 2026
5 Oct 2026
19 Oct 2026
5 Oct 2026
Name of work :-
Construction of Godown Building for 2000 MT Capacity for Civil Supply at
Nakhatrana Dist. Kachchh.
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
1 1706.40 Excavation for foundation upto 1.5 122.94 Rupees One Cu.M.
mt. depth including sorting out and Hundred
stacking of useful materials and Twenty Two
disposing the excavated stuff upto And Paise
any. lead (A) Loose or soft soil Ninety Four
2 792.00 Excavation for foundation upto 1.5 170.69 Rupees One Cu.M.
mt.to 3.0mt depth including Hundred
sorting out and stacking of useful Seventy And
materials and disposing the Paise Sixty
excavated stuff upto 50 mt. lead Nine Only
(B) Dence and Hard soil
3 792.00 Excavation for foundation for depth 184.77 Rupees One Cu.M.
from 3.0 m to 5.0 m including Hundred
sorting out and stacking of useful Eighty Four
materials and disposing off the And Paise
excavated stuff upto 50 Meter Seventy Seven
lead.(B) Dense or Hard soil Only
4 106.00 Providing and laying controlled 3956.63 Rupees Three Cu.M.
cement concrete M-150 and curing Thousand Nine
complete including the cost of form Hundred Fifty
work and reinforcement for Six And Paise
reinforced concrete work in : (a) Sixty Three
Foundations, footings Bases of Only
columns and the like and Mass
5 399.00 Providing and laying controlled 4619.42 Rupees Four Cu.M.
cement concrete M 250 using B.T. Thousand Six
stone aggregate and curing Hundred
complete including the cost of form Nineteen And
work but excluding the cost of Paise Forty
reinforcement for reinforced Two Only
concrete work in. (A) Foundation
footing, base of columns & mass
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
6 43.00 Providing and laying controlled 6047.88 Rupees Six Cu.M.
cement concrete M 250 using B.T. Thousand
stone aggregate and curing Forty Seven
complete including the cost of form And Paise
work but excluding the cost of Eighty Eight
reinforcement for reinforced Only
concrete work in. For RCC
Columns up to Plinth level.
7 287.00 Providing & laying cement concrete 3637.01 Rupees Three Cu.M.
1: 3 : 6 ( 1 Cement : 3 Coarse sand Thousand Six
: 6 graded B.T stone aggregate Hundred Thirty
20mm nominal size) Curing comp. Seven And
including cost of form work in Paise One Only
foundation and plinth.
8 219.00 Provinding and Laying controlled 5798.41 Rupees Five Cu.M.
cement concrete M-250 & including Thousand
finising smooth with curing Seven Hundred
complete including the cost of form Ninety Eight
work but excluding cost of And Paise
reinforcement concrete for RCC Forty One Only
PLINTH BEAM for any cross
sectional area of beam.
9 274.00 Brick work using common Brunt 4214.33 Rupees Four Cu.M.
clay building bricks having Thousand Two
crushing strength not less than 35 Hundred
Kg./Sq.cm.. in cement mortar 1:6 Fourteen And
(1cement : 6 fine sand) (b) Paise Thirty
Conventional In Foundation and Three Only
10 5199.00 Filling in foundation and plinth 269.75 Rupees Two Cu.M.
with murrum or selected soil in Hundred Sixty
layers of 20cm. thickness including Nine And Paise
watering, ramming and Seventy Five
consolidating etc. complete. Only
11 1260.00 Filling in plinth with sand under 481.80 Rupees Four Cu.M.
floors including watering ramming, Hundred
consolidating and dressing complete Eighty One
12 239.00 Filling available excavated earth 136.92 Rupees One Cu.M.
(excluding rock) in trenches. plinth, Hundred Thirty
sides of foundations etc. in layers Six And Paise
not exceeding 20 cm. in depth Ninety Two
consolidating each disposited layer Only
by ramming and watering
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
13 1194.00 Applying general insecticide pest 91.63 Rupees Ninety Sq.M.
control treatment to floors, One And Paise
cupboards etc. including labour Sixty Three
material etc. complete. Using Only
Heptachloride 20 EC. As Per
6113_pests Concentration Weight
0.50 percent is recommended one
litre chemical emulsion dilute with
39 litter of water will give. Total
dilute concentration will be 40 litre
inclusive of one litre chemical
emulsion application 0.5 Litre
chemical / Sq.M.. of surface is
recommended as per I.S
14 941.00 Providing and laying Ordinary 5547.93 Rupees Five Cu.M.
cement concrete M 250 for C. C. Thousand Five
Road / wearing coat with Hundred Forty
Providing and mixing 12 mm Seven And
Recron 3S 900 gm / cubic meter Paise Ninety
and curing including cost of Three Only
formwork, compaction and
finishing of cement concrete
road by trimix vacuum
dewatering process on cement
concrete road surface by using
vacuum dewatering pump, surface
floater, surface vibrator including
channelling and making grooves
and rough finish to surface
by providing expansion joints,
construction joints and filling of
joints with asphalt filler as directed
by Engineer In Charge and as per
specification .
15 32.50 Providing and laying controlled 9347.72 Rupees Nine Cu.M.
cement concrete M-250 and curing Thousand
comp. including the cost of form Three Hundred
work but excluding the cost of Forty Seven
reinforcement for reinforced And Paise
concrete work for Columns, pillars, Seventy Two
posts and struts AT GROUND Only
16 38.00 Provinding and Laying controlled 9388.66 Rupees Nine Cu.M.
cement concrete M-250 and with Thousand
curing etc.complete. Including the Three Hundred
cost of formwork but excluding the Eighty Eight
cost of reinforcement for R.C.C And Paise Sixty
work in Column heving any cross Six Only
section area of Column.For First
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
17 41.00 Provinding and Laying controlled 7665.91 Rupees Seven Cu.M.
cement concrete M-250 and with Thousand Six
curing etc.complete. Including the Hundred Sixty
cost of formwork but excluding the Five And Paise
cost of reinforcement for R.C.C Ninety One
work in beam heving any cross Only
section area of BEAM. for First
18 41.00 Providing and laying controlled 7429.56 Rupees Seven Cu.M.
cement concrete M-250 and curing Thousand Four
complete including the cost of form Hundred
work but excluding the cost of Twenty Nine
reinforcement for reinforced And Paise Fifty
concrete work in Beam and Lintels Six Only
19 67.00 Providing and laying controlled 7416.43 Rupees Seven Cu.M.
cement concrete M-250 and curing Thousand Four
complete including the cost of form Hundred
work but excluding the cost of Sixteen And
reinforcement for reinforced Paise Forty
concrete work in CHHAJJAS For All Three Only
20 39.00 Provinding and Laying controlled 13030.14 Rupees Cu.M.
cement concrete M-250 including Thirteen
finising smooth with curing Thousand
complete including the cost of form Thirty And
work but excluding cost of Paise Fourteen
reinforcement for reinforced Only
concrete work in VARTICAL AND
HORIZONTAL FINS/ PADADI For
21 193823.00 Providing TMT Bar FE 550D 94.99 Rupees Ninety Kg
reinforcement for R.C.C. work Four And Paise
including bending, binding and Ninety Nine
placing in position complete upto Only
floor two level
22 107.00 Providing and laying brick work 4496.05 Rupees Four Cu.M.
using common burnt clay building Thousand Four
conventional type bricks having Hundred
crushing strength not less than 35 Ninety Six And
Kg./Sqcm. in super structure in Paise Five Only
cement mortar 1:6 (1 cement :
fine sand) for Ground floor
including the cost of all materials
and labour charges etc. complete.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
23 80.00 Providing and laying brick work 4538.48 Rupees Four Cu.M.
using common burnt clay building Thousand Five
conventional type bricks having Hundred Thirty
crushing strength not less than 35 Eight And
Kg./Sqcm. in super structure in Paise Forty
cement mortar 1:6 (1 cement : 6 Eight Only
fine sand) for First floor including
the cost of all materials and labour
charges etc. complete.
24 50.00 Providing and fixing rolling shutters 3554.40 Rupees Three Sq.M..
of approved make made of 80 mm Thousand Five
wide M.S. laths inter-locked Hundred Fifty
together through their entire length Four And Paise
and jointed together at the ends by Forty Only
end locks mounted on specially
designed pipe shaft with bracket
plates, guide channels and
arragements for inside and outside
locking with push-pull operation
including the cost of hood cover
and spring etc. complete.(B)
Shutters having width below 3.5 M.
25 36.00 Providing and fixing Glass bicks 3077.47 Rupees Three Sq.M..
Partition using glass brick of Thousand
required design,type size of glass Seventy Seven
bick 19 x 19 cm and fixing the And Paise
same with 4mm dia alluminium Forty Seven
bar at every 3rd layer with white Only
cement etc.complete.
26 1045.00 Providing & fixing M.S. Grill using 132.31 Rupees One Kg
16 mm dia M.S. Bars @ 15 cm C/C Hundred Thirty
fixed in frame using angle 35 mm x Two And Paise
6 mm, 35 x 6 mm flat in center, Thirty One Only
and Galvanized wiremesh jali
20mm x 20 mm spacing, including
red lead primer coat and two coats
of oil painting etc. complete.
27 262.00 Providing 10 mm thick cement 212.15 Rupees Two Sq.M..
plaster in single coat on fair side Hundred
brick/concrete walls for interior Twelve And
plastering upto floor two level and Paise Fifteen
finished even and smooth in Only
cement mortar 1:3 (1 cement :
sand) including finishing with a
floating coat of neat cement slurry
etc. complete for Ceiling .
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
28 1029.00 Providing 15mm thick cement 211.82 Rupees Two Sq.M.
plaster in single coat on Hundred
brick/concrete walls for interior Eleven And
plastering upto floor two level and Paise Eighty
finished even and smooth in (i) Two Only
Cement mortar 1:4 (1-cement:4-
sand) including finishing with a
flating coat of neat cement slurry
etc. complete. for Ground Floor
29 1409.00 20mm thick sand faced cement 315.69 Rupees Three Sq.M.
plaster on walls upto height 10 Hundred
metres above ground level Fifteen And
consisting of 12mm thick backing Paise Sixty
coat of C.M. 1:3 (1-cement : 3- Nine Only
sand) and 8mm thick finishing coat
of C.M. 1:1 (1-cement : 1-sand) etc.
30 114.00 Providing and laying polished Kota 1013.87 Rupees One Sq.M.
stone slab flooring over 20mm Thousand
(Average) thick base of cement Thirteen And
mortar 1:6 (1-cement : 6-coarse Paise Eighty
sand) or L.M. 1.1.5 (1-Lime putty Seven Only
:1.5 - coarse sand) laid over and
jointed with grey cement slurry
mixed with pigment to match the
shade of slab including rubbing
and polishing etc. complete. (A)
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
31 141.00 Providing and laying water proofing 1070.33 Rupees One Sq.M.
tretment with chaina mosaic tiles Thousand
flooring over avg 40 mm C.C. 1:2:4 Seventy And
{1 Cement : 2 sand : 4 Kapachi / Paise Thirty
Gritt 6 to 12 mm size} bedding for Three Only
maintaining slope for plain and
curve surface & 12 mm to 20 mm
of broken piece of seramic / glazed
tiles ( one for more color as directed
) to be laid over cement mortar
bedding of C M 1:3 (1 cement :
sand ) containg one Kg of water
profing materials per bag of O P C
at plain or / and slops and to be
tempered to bring mortar eramic
up to surface with using white
cement and colour pigment
including rounding of junctions
and extending them up to 15 cm
along the wall and curing with
bends any pattens or design as per
drawing and cleaning by using
oxalic acid etc complete.
32 2950.00 Applying two coats of putty & two 40.59 Rupees Forty Sq.M.
coats of primer of approved brand And Paise Fifty
and manufacture on new wall Nine Only
surface to give an even shade
including thoroughly brushing the
surface free from mortar dropping
and other foreign matter and sand
papered smooth.
33 2950.00 Wall painting (two coats) with 84.37 Rupees Eighty Sq.M.
plastic emulsion paint of approved Four And Paise
brand and manufacture on Thirty Seven
undecorated wall surface to give an Only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered smooth.
34 5908.00 Finishing wall with weatherproof 120.26 Rupees One Sq.M.
exterior emulsion paint on wall Hundred
surface (two coats) to give an Twenty And
required shape even shade after Paise Twenty
thoroughly brushing the surface to Six Only
remove all dirt and remains of loose
powdered materials.etc.complete.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
35 1526.00 Providing and Fixing PROFLEX type 4055.15 Rupees Four Sq.M.
self supported Roof (Arch Type) Thousand Fifty
using Cold rolled,Galvalume steel Five And Paise
colour coated sheet 1.1mm thick Fifteen Only
conforming to ASTMA 653,A792
DIN,ALU Zinc Coating : AZ150 and
Regular Modified Polyster painting
with epoxy primer service coat at
bottom,including necessary fixtures
& Fastening for Lighting
arrangement and turbo ventilator
with sky light.
36 9.00 Providing and fixing Turbo 20321.20 Rupees Twenty Nos
Ventilator made from Alluminium Thousand
and stainless steel with ploy Three Hundred
Carbonate Sky Light of size 3 x 7 Twenty One
feet including fixing in roof with And Paise
ISI mark chemical water proofing Twenty Only
as directed by Engineer in charge
37 286.00 Providing throating or Plaster Drip 43.05 Rupees Forty Rmt
and moulding to RCC Chhajja. Three And
Paise Five Only
38 578.00 Providing 12mm wide groove/notch 20.20 Rupees Twenty Rmt
in plaster incluiding finishing the And Paise
same etc.complete for all height/ Twenty Only
39 143.00 Painting three coats on steel and 185.88 Rupees One Sq.M..
other metal surface with enamel Hundred
paint of approved quality brushing Eighty Five
interior to give an even shade And Paise
including cleaning the surface of all Eighty Eight
dirt, dust and other matters Only
including applying priming coat
over new steel.
40 1142.00 Providing and laying damp proof 321.97 Rupees Three Cu.M.
course 25mm thick cement Hundred
concrete 1:2:4 (1-Cement : 2 coarse Twenty One
sand : 4 stone aggregate 10 mm And Paise
nominal size) and curing complete Ninety Seven
41 3612.00 Removing dry or oil bound 11.53 Rupees Eleven Sq.M..
distemper by a washing and And Paise Fifty
scraping and sand papering the Three Only
wall surface smooth including
necessary repairs to scratches
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
42 1718.00 Box cutting the road surface to 109.24 Rupees One Cu.M.
proper slope and camber for Hundred Nine
making a base of road work And Paise
including removing the Twenty Four
excavated stuff and depositing Only
on the road side slope as
directed upto50 mts, lead.
43 675.00 Proviidng and laying W.B.M. of 1165.54 Rupees One Cu.M.
B.T.M.C. metal of size 45 mm to Thousand One
63 mm size including 20% Gritt Hundred Sixty
{Stone scrinning} & stone dust Five And Paise
as filler including spreading, Fifty Four Only
watering & consolidaion by
vibratory roller 80KN to
100KN static weight.
44 520.40 Providing and laying cement 3099.68 Rupees Three Cu.M.
concrete 1:3:6 (1 cement : 3 Thousand
coarse sand : 6 B.T. Crushed Ninety Nine
stone aggregates 40 mm. nominal And Paise Sixty
size) and curing complete Eight Only
excluding cost of from work in
:(a) Foundation and plinth
45 185.00 Providing and fixing pre-cast 400.87 Rupees Four Rmt.
concrete kerb stone of gray cement Hundred And
based concrete block 30cm Paise Eighty
length,30cm height and 15cm thick Seven Only
of M200 grade concret as per
approved design and including
excavation for fixing in proper line
and level,filling the joint with C:M
1:3 (1cement:3fine sand) etc
46 10.00 Providing & Fixing Of 06 Kg Dry 2730.03 Rupees Two Nos.
Chamical Powder Type Abc Fire Thousand
Extinguishers Of Stored Pressure Seven Hundred
Type With Mono Ammonium Thirty And
Phosphate Discharge Tube And Paise Three
Pressure Gauge Complete. As Per Is Only
47 10.00 Providing & Fixing Of 4.5 Kg Co2 5982.23 Rupees Five Nos.
Gas Type Fire Extinguishers Fitted Thousand Nine
With Screw Down Type High Hundred
Pressure Control Valve With 1.0 Eighty Two And
Mtr Long Rubber Braided Paise Twenty
Discharge Hose With Horn. The Three Only
Body Shall Be Cce Approved With
Is:2878 Marking And Supplied With
Initial Charge Of Co2 Gas. The
Valve Shall Confirm To Is:3224 And
As Per Is:15638.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
48 0.71 Clearing and grubbing road land 28455.09 Rupees Twenty Hectare
includinguprooting rank vegetation Eight
grass bushes, shrubs, sapling and Thousand Four
trees girth upto 300 mm removal of Hundred Fifty
stumps of trees cut earlier and Five And Paise
disposal of unservicable materials Nine Only
(C.) By meachanical means in area
of light jungle
49 461.00 Earth work for embankment 169.28 Rupees One Cu.M.
including breaking clods, dressing, Hundred Sixty
with all, lead and lift (excluding Nine And Paise
watering and consolidation) (E) Twenty Eight
From borrow area within 3 Km. lead Only
50 3046.00 Rolling & watering of earthwork in 22.96 Rupees Twenty Cu.M.
layers with vibratory roller Two And Paise
including filling in depressions Ninety Six Only
which occurs during the process
51 560.00 Providing 6.0 Kg f/cm2 working 210.08 Rupees Two Rmt.
pressure polythelene pipes of the Hundred Ten
following outside dia. Low density, And Paise
complete with special flange Eight Only
compression type fittings wall
clamps etc. including making good
the wall, ceiling and floor including
Lowering, laying in TRENCHES and
jointing PVC pipes and specials of
following class and diameter
including cost of conveyance
52 400.00 Providing 6.0 Kg f/cm2 working 431.27 Rupees Four Rmt.
pressure polythelene pipes of the Hundred Thirty
following outside dia. Low density, One And Paise
complete with special flange Twenty Seven
compression type fittings wall Only
clamps etc. including making good
the wall, ceiling and floor. including
Lowering, laying in TRENCHES and
jointing PVC pipes and specials of
following class and diameter
including cost of conveyance
53 10.00 Providing and Construction of 1135.24 Rupees One Nos
Junction chambers of size 0.35 x Thousand One
0.35 x 0.60 mt. with Foundation Hundred Thirty
Concrete in CM 1:2:4 10 Cm thick, Five And Paise
Half Brick Masonary wall in CM Twenty Four
1:4, 50 mm thick Flooring in CC Only
1:2:4 Inside Plaster 15 mm thick in
C.M. 1:4 including connecting of
rainwater pipe as per detailed
drawing and as directed by
Engineer in charge
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
54 4.00 Providing and constructing filter 11807.91 Rupees Eleven Nos
chamber of size 2.06 x 1.21 x 1.20 Thousand
mt. with Foundation Concrete in Eight Hundred
CM 1:2:4 12.5 Cm thick, 23 cm Seven And
thick Brick masonary in CM 1:6, Paise Ninety
Half Brick Masonary Partition wall One Only
in CM 1:4, Inside Plaster 15 mm
thick in C.M. 1:4 and cover slab
cm thick in CM 1:2:4 with
necessaary reinforcement and
Filling 30 cm with 25 to 40 mm size
Kapachi and Coarse sand for 90 cm
as directed including connection
rainwater pipes as per detailed as
directed by Engineer in charge
including cost of labour and
55 4.00 Providing water harvesting pit of 54827.85 Rupees Fifty Nos
2.00 mt x 2.00mt x 4.00 mt. size Four Thousand
for water logging with excavation in Eight Hundred
any strata upto four meter depth, Twenty Seven
filling the pit with B.T.Metal 40 mm And Paise
in 0.60 mt. depth with 25-40mm Eighty Five
kapachi, 0.30 mt. depth and 2.0 Only
mt. depth with coarse sand in
layers including making P.V.C. line
for water inlet etc. as directed with
250mm dia bore 35 mt. depth and
150mm dia P.V.C. pipe of 10 Kg.
f/Cm2 casing with gravel packing
or as directed.
56 2.00 Providing septic tank for sanitary 23497.65 Rupees Twenty Nos
line with excavation in hard Three
murrum CC 1:3:6 foundation Thousand Four
conventional brick masonry in Hundred
foundation and plinth in Cement Ninety Seven
Mortar 1:5, CC M-200 for RCC slab And Paise Sixty
and required TMT bars Five Only
reinforcement 15mm thick cement
plaster in CM 1:3 inside with
floating coat neat cement slurry,
25mm thick sand faced plaster for
out side of septic tank, 50mm thick
CC 1:2:4 I.P.S. flooring with CC
1:3:6 bedding, 100mm dia C.I.
airvent pipe with cowl 0.60 x
mtr size C.I. manhole cover fixing
with RCC slab etc complete
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
57 2000.00 Providing erecting and fixing double 3.94 Rupees Three Litre
coated ISI water tank of required And Paise
capacity each with all necessary Ninety Four
fittings and .connection etc. Only
complete on terrace
58 125.00 Steel work, welded in built up 9361.96 Rupees Nine Qtl.
sections framed work including Thousand
cutting, hoisting, fixing in position Three Hundred
and applying a priming coat of read Sixty One And
lead paint. (D) In trussses and Paise Ninety
trussed purlins, upto 25 M. span Six Only
and 15 M. ovarall height.
59 140.00 Painting two coats (excluding 92.20 Rupees Ninety Sqm.
priming coat) on new steel and Two And Paise
other metal surface with enamel Twenty Only
paint, brushing, interior to give an
even shade including cleaning the
surface an even shade including
cleanicn the surface of all dirt, dust
and other foreign matter.
60 250.00 Providing corrugated G.I. sheet of 734.19 Rupees Seven Sqm.
class-3 roofing fixed with Hundred Thirty
glavanished iron J or L Hooks, Four And Paise
Bolts and nuts 8mm diameter with Nineteen Only
bitumen and G.I. limpet washer or
G.I. limpet washer. filled with white
lead complete excluding the cost of
purlins, Rafters and Trusses.(1)
0.80 mm thick sheet.
61 24.00 Point wiring for Light / Bell with 491.87 Rupees Four Pt.
2-1.5 sq.mm & earth wire of 1.5 Hundred
sq.mm (Green) both are of ISI Ninety One
marked 1.1 kV grade FRLS PVC And Paise
insulated multi strand copper wires Eighty Seven
up to 10 mtr length , in below type Only
of pipe erected with 6A Modular
type switch / bell push &
accessories and earth continuity of
following type, erected on PVC /
Metallic/Wooden box, single
mounting base frame covered with
textured/metallic/white front plate
modules erected on / in wall /
ceiling as per pipe erected, with
necessary Lamp holder/ceiling rose
/ H.D.Connector as directed. (j) in
existing pipe erected concealed in
wall/ceiling complete
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
62 10.00 Point wiring for Individual Plug 681.75 Rupees Six Pt.
with & earth wire of 1.5 sq.mm Hundred
(Green) both are of ISI marked 1.1 Eighty One
kV grade FRLS PVC insulated multi And Paise
strand copper wires up to 10 mtr Seventy Five
length, in below type of pipe Only
erected complete with Modular
type switch & 5 pin Plug erected
on PVC / Metallic/Wooden box
covered with appropriate front plate
modules erected on / in wall /
ceiling as per pipe erected with
following type of accessories. [II]
For 16A Plug and 16 amp switch
with 2-2.5 sq.mm Cu. Wire from
mcb db board. (j) in existing pipe
erected concealed in wall/ceiling
complete Cat. III
63 10.00 Point wiring for on board Looped 309.06 Rupees Three Pt.
Plug with 6A Modular type switch & Hundred Nine
5 pin socket erected on PVC / And Paise Six
Metallic/Wooden box, single Only
mounting base frame covered with
textured / metallic/white front
plate modules erected on / in wall
/ ceiling with following type
64 400.00 Providing and erecting ISI mark 24.24 Rupees Twenty Mtr.
Medium class RIGID PVC PIPES of Four And Paise
following size complete to be Twenty Four
erected on/in wall or ceiling Only
erected with necessary PVC fittings
& Junction boxes fixed with
adhesive solution & Clamps with
following dia of pipes, in approved
manner as directed (a)20 mm
65 350.00 (b) 25 mm 33.33 Rupees Thirty Mtr.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
66 200.00 Providing and erecting Mains with 58.58 Rupees Fifty Mtr.
1.1 kV grade FRLS PVC insulated Eight And
ISI marked stranded Copper Paise Fifty
conductor wire in following type of Eight Only
pipe to be erected concealed in
/flushed on wall/ceiling, with
sq. mm copper conductor FRLS
PVC insulated stranded wire of
green colour for earth continuity of
following size (E) in existing pipe
(a) 2 wire 1.5 sq. mm
67 300.00 (E) in existing pipe (b) 2 wire 2.5 sq. 78.78 Rupees Mtr.
mm Seventy Eight
68 120.00 providing and erecting Mains with 152.51 Rupees One Mtr.
1.1 kV grade FRLS PVC insulated Hundred Fifty
ISI marked stranded Copper Two And Paise
conductor wire in following type of Fifty One Only
pipe to be erected in / on wall /
ceiling with 2.5 sq. mm copper
conductor FRLS PVC insulated
stranded wire of green colour for
earth continuity of following size (E)
in existing pipe (b) 2 wire 6 sq. mm
69 20.00 providing and erecting Mains with 70.70 Rupees Mtr.
ISI marked, 1.5kV grade electrolyte Seventy And
multi stranded, annealed copper Paise Seventy
conductor with heat resistant PVC Only
insulated conforms to IS 694, IEC -
227 erected in existing pipe of
following size (Specifically for
control panel, relays, power
switchgears, motor starters &
control wiring) with required size of
copper lugs, nuts and bolts if
required. (e) One wire 6.00 sq. mm
70 5.00 (g) One wire 16.00 sq. mm 177.76 Rupees One Mtr.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
71 120.00 Supplying and erecting Flexible 58.58 Rupees Fifty Mtr.
PVC insulated multi strand multi Eight And
core 1.1 kV grade ISI marked Paise Fifty
copper wires of following size to be Eight Only
erected as directed. (e) 1.50 Sq.mm
3 core round PVC sheathed
72 5.00 Providing & erecting Switch board 1133.22 Rupees One Ea.
for Computer or electric apparatus Thousand One
consisting of following modular Hundred Thirty
type accessories mounted with Three And
PVC / Metallic concealed/open Paise Twenty
box with single mounting base Two Only
frame covered with
textured/metallic /white front
plate,modules erected with
necessary connections as directed.
1 no. 6A/16A universal plug-switch
combined. 3 nos. 6A Switch 3 nos.
6A 5 pin Plug For Modular Type
Accessories Cat. III
73 24.00 Supplying and erecting LED indoor 535.30 Rupees Five Ea.
fittings with LEDs of wattage 0.2 Hundred Thirty
Watt to 0.5 Watt assembled on Five And Paise
single MCPCB, with housing used Thirty Only
as a heat sink shall be made of
thick sheet Steel conforming to IS:
513/CRCA/ aluminium die cast
powder coated and high U.V. &
corrosion resistance with diffuser
with company mark/name 160V to
270V, Power Factor more than
CCT 3000 K to 6500K,
Luminaire efficacy>
lumens/watt ,LED
LED driver efficiency > 85 %
( fitting required LM-79 & LM-80
Certificates)(NOTE: Below
description have shown ranges of
Wattage capacity of LED
fittings.The Engineer incharge may
select any wattage capacity
between the ranges shown.)
(A) Tube Light with integral driver
(v) 36-40 Watts, Surge-2 kV, IP-20,
conventional 4 feet
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
74 10.00 Supplying and erecting LED street 5080.30 Rupees Five Ea.
light / Flood light fittings with High Thousand
power White LEDs wattage of 3 Eighty And
Watt and above assembled on Paise Thirty
single MCPCB, efficiency more than Only
130 lm/w and corrosion free High
pressure die cast aluminum
housing with smooth finish powder
coated and heat sink extruded
aluminium with diffuser and
Polycarbonate optics/ lenses, with
toughened glass with company
mark/name engraved or embossed
160 to 270 V,Power Factor more
than 0.95, THD < 10 %, CCT
K to 5700K,Uniformity ratio >0.45,
Luminaire efficacy>
lumens/watt . LED driver efficiency
> 85 %.( fittings required LM-79 &
LM-80 certificates)(NOTE: Below
description have shown ranges of
Wattage capacity of LED
fittings.The Engineer incharge may
select any wattage capacity
between the ranges shown.)
(A) Street Light (IP-65), Surge
protection -4KV integral and ,Light
must have 440VAC line supply with
over-voltage protection.
75 28.00 (B) Flood Light (IP-65), Surge 6177.16 Rupees Six Ea.
protection -4kV integral and ,Light Thousand One
must have 440VAC line supply with Hundred
over-voltage protection. Seventy Seven
(iv) 90 - 119 watts Cat-lll And Paise
76 2.00 Providing and erecting Approved 6790.23 Rupees Six Ea.
make Four pole moulded case Thousand
circuit breaker having breaking Seven Hundred
capacity ICU of 25 KA. at 415 Ninety And
V,having normal current rating up Paise Twenty
to 25 A to 100A. with Fixed thermal Three Only
& magnetic release suitable to work
on A.C. supply 50 Hz. with all
internal connections, spreader
tinned copper & complete erected
in existing 16 G.M.S. housing.
ICS=100% of ICU only Cat III
77 1.00 Enclosure of FP MCCB 25A to 679.02 Rupees Six Ea.
100A. (10% amount of SOR item Hundred
no.3-4-1 has been considered) Seventy Nine
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
78 0.80 Supplying and erecting triple pole 3202.71 Rupees Three Rn.Mtr
& neutral 440V / 500V panel Thousand Two
mounting Copper Busbars with Hundred Two
four equal Nos. of electrolyte bus And Paise
having current density not more Seventy One
than 1.6 Amp. / sq.mm (Rated Only
current / cross section area) duly
wrapped with colour insulating
tape for phase sequence of
following current carrying capacity,
erected with necessary bus bar
supports /insulators, main cable
socket to each bar, erected in
existing cubical panel with
necessary connections. (B)
Suitable for 200 Amp. capacity
79 56.00 providing and erecting Miniature 123.22 Rupees One Ea.
circuit breaker single pole 6A to Hundred
25A suitable to operate on 240 V Twenty Three
A.C. system and having breaking And Paise
capacity 10 KA to be erected in Twenty Two
existing box. confirming to IS Only
8828/1996 with ISI Mark
80 12.00 Providing & erecting 240 V MCB 362.59 Rupees Three Ea.
double pole switch for motor & Hundred Sixty
inductive load (C Curve) having Two And Paise
10 KA breaking capacity & Fifty Nine Only
confirms to IS : 8828 in existing
box having following capacity
81 5.00 Providing & erecting 415 V MCB 736.29 Rupees Seven Ea.
Four Pole for Motor & Inductive Hundred Thirty
Load (C Curve) having 10KA Six And Paise
breaking capacity & confirms to IS Twenty Nine
:8828 in existing box having Only
following capacity
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
82 4.00 Providing and erecting Sheet Steel 1492.78 Rupees One Ea.
powder coated MCB distribution Thousand Four
board - flush / surface mounted Hundred
fitted with busbar, neutral link, Ninety Two
earth bar and DIN rail, Conforms to And Paise
IS 8623-1 & 3, IEC 61439-1 & 3 Seventy Eight
without MCB to house appropriate Only
nos. of MCBs.(The DBs should be
used of same company of MCB to
be used) suitable for
(A) single phase incoming and
horizontal single phase outgoing
(b) sheet steel double door
83 4.00 providing and erecting Approved 2458.34 Rupees Two Ea.
make RCCBs conforming to IS: Thousand Four
12640 and having sensitivity of 30 Hundred Fifty
mA and Short Circuit withstand Eight And
capacity of 10 KA and suitable for Paise Thirty
operation on single phase 240 Four Only
V,50Hz. having characteristic of
quick action & tripping with all
advance feature & do not
incorporate any electronic
component. for following Max.
rating erected as directed
(ii) 40Amps. DP
84 12.00 Providing and erecting HOT deep 77.77 Rupees Kg
Galvanised iron strip/wire Seventy Seven
4.064mm to 1.626mm. And Paise
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
85 4.00 Supplying & erecting earth pit of 4591.46 Rupees Four Ea.
minimum bore dia.150mm size Thousand Five
approved make Earthing Electrode Hundred
consisting Pipe-in-Pipe Technology Ninety One
as per IS 3043-1987 made of And Paise
corrosion free hot dipped G.I.Pipes Forty Six Only
having Outer pipe dia of 50mm
having 80-200 Micron galvanising,
Inner pipe dia of 25 mm having 200-
250 Micron galvanising, connection
terminal dia of 12mm with
constant ohmic value surrounded
by highly conductive compound
with high charge dissipation
suitable for following type of
applications with chamber and
heavy duty cover. (A)(approved
make OEM has to submit test
certificate including value of earth
resistance of installation duly
stamped and signed by agency and
officer Incharge has to ensure the
value of earthing resistane
mentioned in test Certificate) &
having back filling compound of (B)
Inner chemical (CCM Compound)-
Resistivity:- 0.2 ohm / meter
testing as per IEC 62561-2017,
Voltage drop:- < 1 volt at no load &
86 1.00 Providing & erecting weather proof, 10468.65 Rupees Ten Sq.Mtr
dust & vermin proof, floor mounted Thousand Four
front operated indoor type cubical Hundred Sixty
panel board necessary IP-42 and Eight And
above protection as per approval Paise Sixty Five
from engineer incharge made from Only
14 SWG thick CRC M.S. sheet for
outer body & doors, 16 SWG thick
CRC M.S.sheet for internal
partitions with necessary
accesories , supporting angles/
flats channel including cutting,
bending, drilling, welding, riveting
with internal partitions & cable
alley as per requirements &
instruction of engineer-in-charge
with erection of supplied switch
gears, BUSBARS, suitable size of
inter connecting PVC copper wire /
copper-aluminium strips, rubber
grommets, rib, bakelite control
fuses/MCB for measuring
instruments, earth bus & earth
bolts, foundation flange - bolts-
base Plates, sufficient nos. of
hinged doors, handles with locking
arrangement and rubber
gasket,heavy duty end terminal
connection,danger notice
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
87 25.00 Providing , erecting , fabricating the 77.77 Rupees Kg
M.S. structure as per requirement Seventy Seven
on site incorporating proper size of And Paise
M.S. angles,square,round, flats, Seventy Seven
bars, channels, sections complete Only
with cutting, welding, grinding &
finishing duly painted with one
coat of red oxide with erection on
site as per direction of engineer in
charge with necessary grouting,
cementing, plastering & finishing
88 50.00 Providing and erecting FRLS- 264.62 Rupees Two Mtr.
XLPE(IS:7098)(I)-88 ISI armoured Hundred Sixty
cable multistrand Aluminium Four And Paise
conductor for 1.1 kV. to be laid on Sixty Two Only
wall with necessary clamps or in
existing trench / pipe of following
size of cables (B) 3 1/2 core
Sq. mm ( 16 Sq. mm 1/2 core)
89 400.00 Providing and erecting FRLS-XLPE 168.67 Rupees One Mtr.
(IS:7098)(I)-88 ISI armoured cable Hundred Sixty
multistrand / Solid Aluminium Eight And
conductor for 1.1 kV. to be laid on Paise Sixty
wall with necessary clamps or in Seven Only
existing trench / pipe of following
size of cables (C) 4 core 10 Sq. mm
90 200.00 Making trench in Hard Murrum / 74.74 Rupees Mtr.
Tar Road of suitable width of 90 cm Seventy Four
or required depth for laying any And Paise
size of cable or locating the fault Seventy Four
all over the run and back filling the Only
same and making the surface as
91 30.00 Providing & laying. R.C.C. Hume 226.24 Rupees Two Mtr.
pipe for cable to be laid 90 cm. Hundred
below ground across the road Twenty Six And
crossing or on floor with necessary Paise Twenty
material in an approved manner Four Only
and making the ground as per
(F) 100 mm dia.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
92 220.00 Providing & laying approved make 62.62 Rupees Sixty Mtr.
Double walled corrugated pipes Two And Paise
(DWC) of polyethylene(conforming Sixty Two Only
to IS 14930 II )with necessary
connecting accessories of same
material at required depth in
existing trench for laying of cable.
below ground / road surface for
enclosing cable (A)50 mm outer dia
93 48.00 Providing and, fixing heavy duty 38.38 Rupees Thirty Ea.
flange type brass cable gland with Eight And
rubber ring for PVC insulated Paise Thirty
armoured cable complete with out Eight Only
going tails, insulating tape etc for
following size of cables.
(C) 2 to 4 core 10 Sq. mm
94 2.00 Providing and, fixing heavy duty 75.75 Rupees Ea.
flange type brass double Seventy Five
compression type cable gland with And Paise
rubber ring for PVC insulated Seventy Five
armoured cable complete with out Only
going tails, insulating tape etc for
following size of cables.
(B) 3 & 1/2 core 35/50 Sq. mm
95 192.00 Solder less crimping type 13.13 Rupees Ea.
Aluminium lugs conforming to IS Thirteen And
suitable for cable of following size Paise Thirteen
evenly crimped with high pressure Only
tool & connected to switchgear
terminals with brass/cadmium
plated nut bolts in an approved
96 2.00 (C) 16/25 Sq.mm. 15.15 Rupees Fifteen Ea.
97 6.00 (D) 35/50 Sq.mm. 20.20 Rupees Twenty Ea.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
98 10.00 Supply of approved make FRP Pole 13476.43 Rupees Ea.
having following specifications: Thirteen
FRP Light Pole made by CNC Thousand Four
filament winding machine using Hundred
thermoset resin polyester/epoxy Seventy Six
resin system) having minimum And Paise
62% glass content. The pole should Forty Three
be in one piece and tapered round Only
in shape, having smooth finish and
should be totally free from
corrosion as well as non conductive
& shock proof Pole should be
provided with FRP Anchor Base
and it should be heavy duty, or MS
Material duly painted with Epoxy
paint. Pole should be flame
retardant as per IS 6746. Resin
used shall be UV resistance and
pigmented. A highly weather
resistant polyurethane coating
shall be applied to the pole after
applying suitable primer system
that ensures proper adhesion of the
paint. Minimum coating thickness
shall be 80 to 100 micron.
Deflection of the pole shall not
exceed more than 10% of the
length of pole for the given load“
Pole should be generally made as
99 10.00 Providing FRP/GRP arm bracket of 2186.65 Rupees Two Ea.
having 15˚ arm with 50 mm OD Thousand One
pipe *5 mm thk,1000mm long from Hundred
pole centre Eighty Six And
(A) Single arm bracket Paise Sixty Five
100 14.00 Supplying & erecting approved 476.72 Rupees Four Ea.
make SMC press moulded Hundred
composite FRP. loop-in, loop-out Seventy Six
approx. 2mm thick box complete And Paise
with Bakelite connector strip Seventy Two
5way(3P+N+E),DIN rail for Only
mounting mob & hinged doors as
per requirement having locking
arrangements with mounting clamp
with nuts, bolts & washers suitable
for erection on pole with cable
clamps& earth bolt of following size
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
101 1.00 Supplying & erecting approved 3168.37 Rupees Three Ea.
make Digital time switch having Thousand One
lithium cell 6 years operative and Hundred Sixty
operate battery backup 1 channel Eight And
day clock with 14 memory Paise Thirty
programme, suitable to operate on Seven Only
240V + 5%, 16A with, floating
contacts Minimum switching setup
time 1 minimum & LCD display.
Also comprised permanent
ON/OFF switching. Programming
switches & housed in fire proof
thermoplastic enclosure &
transparent cover erected as
required with necessary connection
erected as directed.
102 1.00 Supplying & erecting power 857.49 Rupees Eight Ea.
contactor ,AC3 duty for time switch Hundred Fifty
complete erected as per direction Seven And
Cat III Paise Forty
(C) 4 pole 440V 16 Amp. Nine Only
103 1.00 Supplying and erecting approved 1275.63 Rupees One Ea.
make panel mounting type Digital Thousand Two
Voltmeter having 3 digits LED Hundred
display, 0 to 750 AC Volts range Seventy Five
erected on existing panel board And Paise Sixty
with all connection, wiring etc .with Three Only
manufacturers calibration
104 1.00 Supplying and erecting approved 1558.43 Rupees One Ea.
make panel mounting type Digital Thousand Five
Ammeter having 3 digits LED Hundred Fifty
display, external CT operated, Eight And
calibrated for 0 to 1000 Amps Paise Forty
suitable to operate on 500 Volt AC , Three Only
erected on existing panel board
with all connection, wiring etc .with
manufacturers calibration
105 2.00 Supplying and erecting Ammeter / 317.14 Rupees Three Ea.
Voltmeter selector switch for 3 Hundred
phase AC Supply 500 V on existing Seventeen And
panel board with necessary Paise Fourteen
connections. Only
106 3.00 Providing & erecting L.T. Current 274.72 Rupees Two Ea.
Transformer with bar primary 50/5 Hundred
to 1000/5 ratio 15 VA burden Seventy Four
erected in existing CRCA box duly And Paise
secured with insulating materials Seventy Two
connected to the meter Only
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
107 3.00 Supplying and erecting approved 43.43 Rupees Forty Ea.
make suitable panel indicator LED Three And
type lamp, lens cover, complete Paise Forty
erected with necessary connections. Three Only
Rupees Five Crore Three Lakh(s) Forty Two Thousand Nine Hundred Forty Two And Paise
Forty Four Only
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Note-2 Labour Cess shall be recovered as per SBD
Note-3 GST and Income tax TDS will be deducted at a source while making payments of bills.
Note-4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
BUILDING SPECIFICATIONS BOOK.pdf
Detailed Specifications.pdf
GR-1.pdf
GR-2.pdf
SBD Book.pdf
Spe. Index.pdf
Drawings.pdf
Memorandum of Understanding.pdf
Nominated Contractors.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .