Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | ₹8.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.7 L+₹48,321 (5.90%)Rejected-AOC | ₹8.7 L+₹48,321 (5.90%) | L2 | Rejected-AOC L2 |
| 3 | L3₹11.7 L+₹3.5 L (43.1%)Rejected-AOC | ₹11.7 L+₹3.5 L (43.1%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M/S SUDHIR KUMAR GUPTA L2 | BHARDWAJ CONSTRUCTION & B.M SUPLLYER L3 | M/s JAI BHAWANI ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantlingof existingstructures likeculverts, bridges, retainingwallsandother
structurescomprisingofbrickmasonry, includingdisposalofunserviceablematerial
and stacking the serviceablematerial with all lift and lead of 1000mas per
Technical Specification Clause 202. | 117.83 | cum | 50 ₹5,891.5 Lowest | 500 ₹58,915 | 361 ₹42,536.63 |
| 1.02 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203. SOR - 2-2 | 89.6 | cum | 3,500 ₹3,13,600 | 5,000 ₹4,48,000 | 3,436 ₹3,07,865.6 Lowest |
| 1.03 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar. SOR - 11-5-2 | 32.2 | cum | 3,200 ₹1,03,040 Lowest | 5,000 ₹1,61,000 | 3,742 ₹1,20,492.4 |
| 1.04 | Plastering with cement mortar (1:4),15 mm thick on brickwork in substructure asper technical specification Clauses 613.4 & 1204. SOR - 12-3 | 184 | Sqm | 100 ₹18,400 Lowest | 200 ₹36,800 | 132 ₹24,288 |
| 1.05 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) P.C.C. grade M 20
12-5-2-2 Nominal mix (1:2:4) | 75.6 | cum | 5,500 ₹4,15,800 | 6,000 ₹4,53,600 | 4,130 ₹3,12,228 Lowest |
| 1.06 | Providing steel R.S . Js /buil up steel sections including cutting welding rivetting hoisting fixing in position for composite girders with shear conncctors com;lete with paining as per drawing and technical specifications | 100 | Nos | 80 ₹8,000 | 90 ₹9,000 | 60 ₹6,000 Lowest |
| 1.07 | S/F of stone i/c all cost complete work | 1 | Nos | 2,000 ₹2,000 Lowest | 4,000 ₹4,000 | 5,000 ₹5,000 |
Tender Value
₹15.2 L
EMD Value
₹45,690
Closing Date
6 Feb 2026, 5:00 pmClosed
Municipal Commissioner NNR
nagar nigam roorkee
Construction of drain and CC road from Anoop Vermas house towards the old Tehsil police station in Ward No. 31
2026_MCNNR_91312_1
776/NNR/2025-26
Open Tender
Civil Works
Item Rate
90 days
Nagar nigam roorkee
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Municipal Commissioner Nagar Nigam
₹45,690
2 Apr 2026
27 Jan 2026
7 Feb 2026
27 Jan 2026
6 Feb 2026
28 Jan 2026
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
termcondition35.pdf
Tender Documents • 2.97 MB
BOQ_108160.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .