Loading…
Loading…
Tender Value
₹39.8 L
EMD Value
₹40,000
Closing Date
7 Aug 2026, 6:00 pmClosed
Executive Engineer, R&B Division, Bhuj
Repairing of Existing Major Bridge Damaged Retaining Wall on Pandhro - Narayan Sarovar Road Km. 28/600 to 28/800
329549
34 For 2026-27
Open
Repair and Maintenance
Works
Kutch
10 documents required · 10 mandatory
₹1,500
Executive Engineer, R and B Division, Bhuj
₹40,000
31 Jul 2026
31 Jul 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
Name of work :-
Repairing of Existing Major Bridge Damaged Retaining Wall on Pandhro -
Narayan Sarovar Road Km. 28/600 to 28/800
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated In Figures In Words
to estimated Quantities
1 1.00 Clearing and grubbing road land 511.11 Rupees Five Hectares
including uprooting rank vegetation Hundred
grass bushes,shrubs,sapling and Eleven And
trees girth up to 300 mm removal Paise Eleven
of stumps of trees cut earlier and Only
disposal of unserviceable materials
(C) By mechanical means in area
of light jungle
2 490.00 Excavation for Foundation of Piers, 511.11 Rupees Five Cum
Abutment foundations in sand, Hundred
gravel, clay, soft soils, murrum, Eleven And
hard murrum, boulders, very stiff Paise Eleven
or sticky clays, soft rock, etc. Only
including shoring, strutting and
dewatering as necessary and
depositing of the excavated stuff as
directed for all lead, back filling the
excavated pit by approved
excavated material etc. complete as
per specification.
3 160.00 Providing and Filling Rubbles 1094.11 Rupees One Cum
including hand packing and filling Thousand
interstices with quarry spalls Below Ninety Four
Foundations as directed. And Paise
4 570.00 Earth work for embankment 1083.81 Rupees One Cum
including breaking clods, dressing Thousand
with all lead and lift and including Eighty Three
watering, rolling and consolidation And Paise
of subgrade in layers at O.M.C. to Eighty One
required dry density, including Only
filling the depressing, which occurs
during the process using power
roller of 8 tonne to 10 tonne all as
per specification.
5 80.00 Providing and laying dry stone 4185.44 Rupees Four Cum
pitching of 300 mm thick on slopes Thousand One
with RCC Panel CC Beam of 300 x Hundred
300 in M20 Concrete including Eighty Five
hand packing, filling joints as And Paise
directed by engineer in charge for Forty Four Only
all lead and lift.
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
6 250.00 Providing and laying ‐ Filter Media 309.84 Rupees Three Sqm.
150mm thick directed at the back Hundred Nine
of abutments, returns and wing And Paise
walls as per detailed specifications. Eighty Four
7 1100.00 Providing & making Gabion 1971.52 Rupees One Cum
structure with Mechanically Woven Thousand Nine
Double Twisted Hexagonal Shaped Hundred
Wire mesh Gabion Boxes as per IS Seventy One
16014:2012, MORT&H Clause And Paise Fifty
2500, of required size, Mesh Type Two Only
10x12 (D=100 mm with tolerance of
± 2%) Zinc coated, Mesh wire
diameter 3.0 mm, mechanically
edged/selvedged with partitions at
every 1m interval and shall have
minimum 10 numbers of openings
per meter of mesh perpendicular to
twist, tying with lacing wire of
diameter 2.2 mm, supplied @3% by
weight of Gabion boxes, filled with
boulders with least dimension of
200 mm, as per drawing, all
complete as per direction of
Engineer-in-charge.
8 240.00 Providing and fixing Geo-Synthetic 131.30 Rupees One Sqm.
Drain behind retaining wall Hundred Thirty
passport instruction of site incharge One And Paise
9 650.00 Providing and filling sand behind 504.42 Rupees Five Cum
Gabion Wall in layers as directed. Hundred Four
Rupees Thirty Nine Lakh(s) Eighty Four Thousand One Hundred Thirty Six And Paise Fifty One
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing Charges for the quality of material shall be recovered as per SBD
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4 TFP!q)qZ__$ YL
ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L ,FU] 50X[P
Note-9 Labour Cess shall be recovered as per SBD
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the difference of
cement consumption shall be deducted from rate of original item at the rate of star rate mentioned in
tender. However for Increase in quantity of cement no additional payment shall be made.
Note-14 For earthquake resistance provision the work shall be carried out as per the instruction of Engineer in-
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4 TFP_$q!!q!5
D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM ZC[X[ H[
V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S .HG[ZGF GFD4
SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF SFD 5Z CFHZ YIF
V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST XZT D]HA lGI]lST YFI
TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI NZdIFG lGI]S SZ[, .HG[Z
SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT SZJFDF\ VFJX4 H[ GMG ZLO\0[A,
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
Detailed Specifications.pdf
GR.pdf
ROAD WORK Booklet - 1.pdf
ROAD WORK Booklet - 2.pdf
SBD Book.pdf
Spe. Index.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .