Tender Value
₹4.1 Cr
EMD Value
₹3.6 L
Closing Date
1 Apr 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
ADEN BME
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less: where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a work contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
Defination of Similar Work :- Supply and installation of track mounted automatic Gauge face lubricator on Curves "by RDSO approved Vendors
20 conditions · 2 needing a document upload
General Conditions of the Contract (GCC) for service, 2018 is applicable to this contract.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
It shall not be obligatory on the said authority to accept the lowest tender and no tenderer/tenderers shall demand any explanation for the cause of rejection of his/their tender.
If the tenderers deliberately gives/give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer/s expires after the submission of his/their tender or after the acceptance of his tender, the Rly. shall deem such tender as cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled unless the firm retains its character.
Installation of track mounted automatic Gauge Face Lubricators on curves in the Jurisdiction of Sr. DEN/West of Jodhpur Division
180of2025-26
180of2025-26
Open
Service - General
66 Months
Jodhpur, Rajasthan
₹0
₹3.6 L
1 Apr 2026
5 Mar 2026
18 Mar 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,13,76,977.46 | ||
| — | 91.00 | — | — | ||
| Supply, Installation, Commissioning & Operation (For 5 Years) of Track Based Rail Lubricator (Electronic Type) Complete System as per RDSO's Technical Specification IRS: T-48 Version 2.0 (ACS 1& 2 March/2022) -updated. Payment schedule: 1) After supply, installation & commissioning - 30% (2) After 1 year 20% (3) After 2 year 20% (4) Balance 30% in 3 equal installments in balance 3 years. (Rate including 18% GST). The supplier firm has to ensure all required maintenance and necessary assistance in all respect including skilled engineers, man power, all tools, plants, leading machinery to the site of installation etc. | — | — | — | 3,81,54,212.46 | |
| — | 13650.00 | — | — | ||
| "Supply of grease as per RDSO technical specifications for Rail lubricator including GST etc. The supplier firm has to ensure all required manpower, T&P for leading the grease to site and refilling into the lubricator. " | — | — | — | 32,22,765 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
IRST48Ver2_01.pdf
ATTACHMENT
TBL-E.pdf
ATTACHMENT
Technicaleligibilityletterdated17_02_2023.pdf
ATTACHMENT
AnnexuresforGFL1.pdf
ATTACHMENT
PolicyofvendorsofitemTBL.pdf
ATTACHMENT
specialconditionsTBL.pdf
ATTACHMENT
GCCServicework2018Compress.pdf
ATTACHMENT
Tender Document
ATTACHMENT
TennderDocumentforServicecontractdtd19081920-08-2019-75.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .