Tender Value
₹6.6 Cr
EMD Value
₹6.6 L
Closing Date
22 Jun 2026, 6:00 pmClosed
Superintending Engineer, P. H. Circle, Anjar-Kutch
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as intake wells/structures structures, staff quarters, pump house, all bulk transmission and distribution pipelines, valves, pumping machinery & electrical equipment etc. for the 150 MLD Jackwell no 3 water supply scheme/s, including supply of 150 MLD Raw water to Sapeda GWIL HW 60 months period. District: Kutch based on TapparDam Excluding supply of PAC, bleaching powder and chlorine gas. ( Including All Electromechanical Componenet , 1516 MM Dia MS Pipe , 6 Nos of Ex Army Security for TapparDam , Line Man and Pump Operator )( VT PUMP 4+2 - 1700 M3 / Hr , 76 M Head , 550 KW )
307452
01/2026-27
Open
Civil Works - Water Works
Works
Kutch
7 documents required · 7 mandatory
₹12,000
Executive Engineer, P.H. Works Division , GWSSB, Anjar
₹6.6 L
21 May 2026
21 May 2026
21 May 2026
22 Jun 2026
21 May 2026
Name of Work:Comprehensive Operation & Maintenance of Civil & Electromechanical assets such
as intake wells/structures structures, staff quarters, pump house, all bulk transmission and
distribution pipelines, valves, pumping machinery & electrical equipment etc. for the 150 MLD
Jackwell no 3 water supply scheme/s, including supply of 150 MLD Raw water to Sapeda GWIL HW
60 months period. District: Kutch based on TapparDam Excluding supply of PAC, bleaching powder
and chlorine gas. ( Including All Electromechanical Componenet , 1516 MM Dia MS Pipe , 6 Nos of
Ex Army Security for TapparDam , Line Man and Pump Operator )( VT PUMP 4+2 - 1700 M3 / Hr ,
M Head , 550 KW )
Estimated Cost : Rs.
Gujarat Water Supply & Sewerage Board
THIS PAGE IS LEFT INTENTIONALLY BLANK
SR. NO. PARTICULARS
THIS PAGE IS LEFT INTENTIONALLY BLANK.
Schedule showing approximate quantity of materials to be supplied to the contractor at the govt. store
for the work to be executed on contract and the rate which they are to be charged.
Sr. Particular Quantity Issue Rate Unit Place of
Add rows as required
1. Materials not included in “Schedule – A” but required for the work shall be provided by the
contractor at his own cost.
2. Any materials required for items other than labour charges items mentioned in “Schedule – B” and
materials not included in “Schedule – A” but available with dept. will be issued on request of the
contractor at departmental issued rate or market rate whichever is more.
3. The contractor shall provide his own arrangement for loading, unloading and transporting the
materials issued by the dept. from store to site at his own cost. Contractor will be responsible for
damages whatsoever during transfer.
4. The unused materials issued by the department for this work shall be returned to the department
in good and acceptable condition by the contractors. Any such unused materials not returned by
the contractor in time or issued will be recovered at Double of (As per issue rate + 3% storage
charge or Board RC + 3% storage charges) whichever is more.
5. All materials such as Specials, Fittings, Spares,etc. shall bebrought by Agency / Contractor at site
6. The material which requires to be procured by contractor and same as available with the
department the same can be issued to the contractor after prior approval from the competent
authority and charged for the same will be at the current market rate or issue rate fixed by the
department whichever is higher. The contractor shall have to deposit total cost of materials
issued or shall be recovered from the running account bill.
7. The materials issued for the above work shall be used in the above O&M work only. If any of
materials issued for this work and found used in other works shall be charged at the double rate.
8. As per the instructions of the competent authority and availability of materials, if needed contractor
have to transport the same from the other store to ………Scheme for which no extra carting,
loading, unloading will be paid.
9. The materials issued free of cost to the contractor is to be transported to the site of work in good
condition by the contractor for which no extra payment will be made.
10. The materials to be brought/purchase by the contractor shall be got approval from the EIC before
using in the work.
Signature of the contractor
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as
intake wells/structures structures, staff quarters, pump house, all bulk transmission and distribution
pipelines, valves, pumping machinery & electrical equipment etc. for the 150 MLD Jackwell no
water supply scheme/s, including supply of 150 MLD Raw water to Sapeda GWIL HW 60 months
period. District: Kutch based on TapparDam Excluding supply of PAC, bleaching powder and
chlorine gas. ( Including All Electromechanical Componenet , 1516 MM Dia MS Pipe , 6 Nos of Ex
Army Security for TapparDam , Line Man and Pump Operator )( VT PUMP 4+2 - 1700 M3 / Hr , 76 M
Head , 550 KW )
KANDLA-GANDHIDHAM REGIONAL WATER SUPPLY SCHEME
NAME OF WORK:-Comprehensive Operation & Maintenance of Civil & Electromechanical
assets such as intake wells/structures structures, staff quarters, pump house, all bulk
transmission and distribution pipelines, valves, pumping machinery & electrical equipment
etc. for the 150 MLD Jackwell no 3 water supply scheme/s, including supply of 150 MLD
Raw water to Sapeda GWIL HW 60 months period. District: Kutch based on TapparDam
Excluding supply of PAC, bleaching powder and chlorine gas. ( Including All
Electromechanical Componenet , 1516 MM Dia MS Pipe , 6 Nos of Ex Army Security for
TapparDam , Line Man and Pump Operator )( VT PUMP 4+2 - 1705 M3 / Hr , 76 M Head ,
QTY Unit Name of Work Rate Unit Amount
Comprehensive Operation &
Maintenance of Civil &
Electromechanical assets such as
intake wells/structures structures,
staff quarters, pump house, all bulk
transmission and distribution
pipelines, valves, pumping
machinery & electrical equipment
etc. for the 150 MLD Jackwell no
water supply scheme/s, including
supply of 150 MLD Raw water to
Sapeda GWIL HW 60 months period.
District: Kutch based on TapparDam
Excluding supply of PAC, bleaching
powder and chlorine gas. ( Including
All Electromechanical Componenet
1516 MM Dia MS Pipe , 6 Nos of Ex
Army Security for TapparDam , Line
Man and Pump Operator )( VT PUMP
12.00 Month For 1st Year (12 Months) 971000.34 Month
12.00 Month For 2nd Year (12 Months) 1029260.36 Month
12.00 Month For 3rd Year (12 Months) 1091015.98 Month
12.00 Month For 4th Year (12 Months) 1156476.94 Month
12.00 Month For 5th Year (12 Months) 1225865.56 Month
Item no :- 02 , Inside-Outside
Painting to all Functional civil
structures, as per schedule
Finishing wall with weather proof
exterior emulsion paint of on wall
surfaces (Two coats)to give an
required shape even shade after
throughly brushing the surface to
remove all dirt and remains of loose
poedered materials etc complete
Pump House - Existing
1530.00 Sqm At Jackwell - 12 x 15 Mtr 119.07 Sqm
1360.00 Sqm Near Transformer Area for Jackwell 119.07 Sqm
Oil paint colour: All type of doors,
windows, ventilation, shutter,
pump, motor, all valves &
equipment inside pump house,
transformer yard, D.P. structure,
transformer etc
918.00 Sqm Item No 03 :- Painting two coats 91.29 Sqm
(excluding priming coat) on new
steel and other metal surface with
enamel paint, brushing interior to
give an even shade including
cleaning the surface an even shade
including cleaning the surface of all
dirt ,dust and all othe foreign
Item No :- 04 Inside Painting to all
Functional civil structures, as per
Pump House - Propossed
1530.00 Sqm At Jackwell - 12 x 15 Mtr 75.92 Sqm
1360.00 Sqm Near Transformer Area for Jackwell 75.92 Sqm
1.00 Nos Item No :- 05 Energy Audit and 79550.00 Nos
Performance evaluation of Tappar
JW-3 HW (150MLD)- Anjar
Total of Schedule B in Rupees.Six CroreSixty FourLakhs Ten Thousand ThreeHundredFive Rupees
and FiftyNinePaisaOnly
I / We am / are willing to carry out the work at_________ % above / Below percent (should be
written in figure and words) of the estimated rates mentioned above amount of my / our tender
works out as under.
Estimated amount Put to tender: Rs. Estimated amount Put to tender: Rs.
Deduct ______ % above Rs. ____________ Add ______ % above Rs.
In words Rupees __________________________ In words Rupees __________________________
Rates to be quoted exclusive of GST.
Part A is payable on monthly basis whereas part B is subject to completion of activities and
approval of the measurement.
Water supply of target quantity of water to all habitations (village, towns and hamlets)on a
daily basis. If due to breakdown, agency is not capable of supplying water then such quantity
should be supplied the next day to cope up with the shortage. Such that the water supplied on
the next day will be 2 times the regular per day target.
Contractor should quote rate in words & figure both.
Insurance Policy should be procured in favour of Executive Engineer, PH Works Division,
ANJAR, and contractor has to produce it before entering into agreement with department, for
the full period of O&M.
The bidders should strictly note that rate will be fixed and firm. No escalation will be given
during the maintenance period.
The work should be carried out as per the terms and conditions laid down in the tender
The cost of raw water, electricity will be borne by GWSSB.
GWSSB will supply necessary stock of Chlorine gas, PAC & bleaching powder. All other
required material for O&M work shall be brought by the contractor at his own cost including
loading, unloading and carting and the same material shall get approval from the Engineer-in-
charge before use in the work.
The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading,
carting labour charges payment to labour including insurance, P.F. and all other liabilities for
the staff engaged for the O&M work.
All replaced material (provided from the department’s store) shall be returned to department
store by the contractor at his own cost.
Painting of overall structures:Internal/external painting of civil structures, machineries,
manifolds, valves etc.
Interior Paint: Distemper paint to all civil assets
Exterior paint: shall be acrylic emulsion paint colour (like APEX): pump house, treatment
plants, treated water pumping stations, GSRs, ESRs, sump, stores, etc all.
Oil paint colour: All type of doors, windows, ventilation, shutter, pump, motor, all valves &
equipment inside pump house, transformer yard, D.P. structure, transformer etc
Black Japan colour: air valve, sluice valve, riser pipe of air valve, zero velocity valve, butterfly
valve (outdoor), bypass arrangement etc.
Breakup of Schedule B
Part A: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as intake
wells/structures structures, staff quarters, pump house, all bulk transmission and distribution
pipelines, valves, pumping machinery & electrical equipment etc. for the 150 MLD Jackwell no 3 water
supply scheme/s, including supply of 150 MLD Raw water to Sapeda GWIL HW 60 months period.
District: Kutch based on TapparDam Excluding supply of PAC, bleaching powder and chlorine gas. (
Including All Electromechanical Componenet , 1516 MM Dia MS Pipe , 6 Nos of Ex Army Security for
TapparDam , Line Man and Pump Operator )( VT PUMP 4+2 - 1705 M3 / Hr , 76 M Head , 550 KW )
KANDLA-GANDHIDHAM REGIONAL WATER SUPPLY SCHEME
NAME OF WORK:-Comprehensive Operation & Maintenance of Civil & Electromechanical
assets such as intake wells/structures structures, staff quarters, pump house, all bulk
transmission and distribution pipelines, valves, pumping machinery & electrical equipment
etc. for the 150 MLD Jackwell no 3 water supply scheme/s, including supply of 150 MLD
Raw water to Sapeda GWIL HW 60 months period. District: Kutch based on TapparDam
Excluding supply of PAC, bleaching powder and chlorine gas. ( Including All
Electromechanical Componenet , 1516 MM Dia MS Pipe , 6 Nos of Ex Army Security for
TapparDam , Line Man and Pump Operator )( VT PUMP 4+2 - 1705 M3 / Hr , 76 M Head ,
QTY Unit Name of Work Rate Unit Amount
Comprehensive Operation &
Maintenance of Civil &
Electromechanical assets such as
intake wells/structures structures,
staff quarters, pump house, all bulk
transmission and distribution
pipelines, valves, pumping
machinery & electrical equipment
etc. for the 150 MLD Jackwell no
water supply scheme/s, including
supply of 150 MLD Raw water to
Sapeda GWIL HW 60 months period.
District: Kutch based on TapparDam
Excluding supply of PAC, bleaching
powder and chlorine gas. ( Including
All Electromechanical Componenet
1516 MM Dia MS Pipe , 6 Nos of Ex
Army Security for TapparDam , Line
Man and Pump Operator )( VT PUMP
12.00 Month For 1st Year (12 Months) 971000.34 Month
12.00 Month For 2nd Year (12 Months) 1029260.36 Month
12.00 Month For 3rd Year (12 Months) 1091015.98 Month
12.00 Month For 4th Year (12 Months) 1156476.94 Month
12.00 Month For 5th Year (12 Months) 1225865.56 Month
Item no :- 02 , Inside-Outside
Painting to all Functional civil
structures, as per schedule
Finishing wall with weather proof
exterior emulsion paint of on wall
surfaces (Two coats)to give an
required shape even shade after
throughly brushing the surface to
remove all dirt and remains of loose
poedered materials etc complete
Pump House - Existing
1530.00 Sqm At Jackwell - 12 x 15 Mtr 119.07 Sqm
1360.00 Sqm Near Transformer Area for Jackwell 119.07 Sqm
Oil paint colour: All type of doors,
windows, ventilation, shutter,
pump, motor, all valves &
equipment inside pump house,
transformer yard, D.P. structure,
transformer etc
918.00 Sqm Item No 03 :- Painting two coats 91.29 Sqm
(excluding priming coat) on new
steel and other metal surface with
enamel paint, brushing interior to
give an even shade including
cleaning the surface an even shade
including cleaning the surface of all
dirt ,dust and all othe foreign
Item No :- 04 Inside Painting to all
Functional civil structures, as per
Pump House - Propossed
1530.00 Sqm At Jackwell - 12 x 15 Mtr 75.92 Sqm
1360.00 Sqm Near Transformer Area for Jackwell 75.92 Sqm
1.00 Nos Item No :- 05 Energy Audit and 79550.00 Nos
Performance evaluation of Tappar
JW-3 HW (150MLD)- Anjar
Total for Part A& B in. Rupees Six Crore Sixty Four Lakhs Ten Thousand Three Hundred Five
Rupees and Fifty Nine Paisa Only
Rate Analysis for above item
… Part B- Maintenance (separately payable on actuals, as measured)
Qty. Unit Item Per Amount in
Inside-Outside Painting to all Functional civil
structures, as per schedule (twice in the
contract period)Finishing wall with weather
proof exterior emulsion paint of on wall
surfaces (Two coats)to give an required
shape even shade after throughly brushing
the surface to remove all dirt and remains of
loose poedered materials etc complete
a Pump House - Existing
765.00 Sqm At Jackwell - 12 x 15 Mtr 119.07 Sqm
Near Transformer Area for Jackwell - 3 (20 x
B1 Inside Painting to all Functional civil
(iii) structures, as per schedule
1 Pump House –Propossed
765.00 Sqm At Jackwell - 12 x 15 Mtr 75.92 Sqm
Near Transformer Area for Jackwell - 3 (20 x
680.00 Sqm 75.92 Sqm
Oil paint colour: All type of doors, windows,
ventilation, shutter, pump, motor, all valves
& equipment inside pump house,
transformer yard, D.P. structure, transformer
Qty. Unit Item Per Amount in
Painting two coats (excluding priming coat)
on new steel and other metal surface with
enamel paint, brushing interior to give an
even shade including cleaning the surface an
even shade including cleaning the surface of
all dirt ,dust and all othe foreign matter.
Energy Audit (See Annexure-1)
<add rows in each item>
Total- Part B (B1+B2+B3)
Total for Part B in. Rupees Seven Lacs Twenty Six Thousands Eight HundreadSeventy Five rupees
and Thirty Two paisa(words) Only
NAME OF WORK: Energy Audit and Performance evaluation of Various Water Work Pumping Stations in
Zone-4 Kutch Gujarat.
Unit Rate Quantity Amount
No. Item Description
Item No. 1: (Pump Study)
Carrying out individual pump set study for determination
of existing efficiencies and preparation of operation
characteristic curves by simultaneous measurements of
flow, head, power, frequency etc. at various flow
conditions with one minute data logging for a min. period
of one hour. Also testing the pump for cavitations,
vibration and heating condition per individual pump is to
be observed for proper ratings, percentage loading at
various operating condition, measurement of no load loss
for predicting operating efficiency of motor set and
deriving best operative range.
Item No. 2: (Motor Study)
Carrying out individual motor study for performance
2 investigation ted in terms of proper rating – safe margin 1675 6
for operating at best efficiency, deviation from
characteristic at no load & full load of energy consumption
Item no. 3: (parallel pump)
Carrying out parallel pump study for the measurements of
total flow, head and power with one minute data logging
3 Per Job 5000 5
for a min. period of fifteen minutes as well as determining
suitability of individual pump to be run in parallel
Item No. 4: (Demand Profile)
Study of electrical services to construct Demand profile by
measurement and analysis of daily Load variation at mains
of services with one minute data logging for a period of
hours and measurements of operating parameters for
individuals motors for possible reduction in demand and
optimum utilization of tariff i.e. to get maximum benefit in
Time of use Unit and Night Hours Unit etc.
Item No. 5 Transformer:
Performance evaluation through simultaneous
measurement of major electrical parameters on H.T. and
L.T. side and rationalization of transformer, if needed.
Item No. 6 Power Factor and Capacitor, APFC Panel:
Measurement of power factor at various points of PCC
MCC, Load centre etc. and analysis of the same for
optimizing losses and to improve power factor by required
capacitor for maximum benefits in tariff bill by means of
suggesting fine tuning of capacitor operation.
Item No. 7: Electrical Distribution Network alongwith
All the electrical accessories in Electrical distribution
network of each service should be checked for their proper
functioning and ratings such as Transformer, capacitors,
etc all. Technical analysis regarding proper location of
malfunctioning overheating sparking and facilitate quick
maintenance.Checking the condition of protection system
7 in electrical panels and inspection of panels for loose Job 1675 1
contacts, arcing chattering etc. Recommendations should
be made for ensuring the proper functioning of all installed
equipments including System unbalance with respect to
voltage and current shall be checked for motors and cable
termination for loose contacts and heating. Transformer
and need for additional control device based on technical
analysis.Review of existing meters for adequate
monitoring requirements.
Item No. 8: (Illumination Study)
Study of Illumination for lighting load of electrical service
for pumping station by measurements of lighting load
8 profile and Lux levels and study of switching system per Job 850 1
service. Prices should be quoted on “per electrical service”
basis and suggestions for non-conventional resource
utilization like solar/LED.
Item No. 9: (Harmonics Study)
Study of Harmonics at certain key location of each
electrical service by measurements of THD in voltage and
current as also individual measurements of harmonics per
service. Prices should be quoted on “per electrical service”
basis including suggestions for filtration.
Item No: (10) Valves :
The study/ checking the working condition of all type of
existing valves & DPCV. Observations regarding pressure
drops across the devices if any.
Item No: (11) Auxiliary load :
Study / measurements the auxiliary load like crane, hoist,
air conditioner, blowers dewatering pumps etc. and
identify the energy losses and suggest the remedial
measure and quantum of saving if any.
Total For Category A
Part C- Upgradation or Repair of non-functional legacy assets
Qty. Unit Item Per Amount in
Repair, upgradation of non-functional assets
1 which are crucial for safe and efficient
functioning of RWSS
<add BOQ description for each item. Add
rows as required>
Total- Part C [Sum C]
Total for Part C in. Rupees ……………………………………………………………………(words) Only
Providing and supplying Electric Two Wheeler including RTO registration, Insurance, road
tax with the name of DEE, P.H.S.Sub division, Gandhidham for use of supervision and
monitoring of project without any pay. Qty : 01 No.
Ather RiztaS - 3.7 kwh Battery Pack with Riding Range of 159km. Qty : 01 No.
Brother DCP-L2541DW Auto Duplex Laser Printer With 30 PPM Print Speed,
Multifunction Print Scan Copy, Automatic Document Feeder, 2 in 1 ID Copy Button, (WIFI,
WIFI Direct, LAN, USB) without any pay.
Part C: Detailed BOQ
Brief note on operational issues and need for the repairs:______________________________
_______________________________________________________(include notes from inspection
by DEE and the need for such items)
Abstract of BOQ for Part C
<Attach/ add abstracttable>
Total Estimated Cost of Part C: _________________________________(in figures and words)
Total time limit for completion of Part C scope of work: ________________ (months) (shall not be
more than 12 months from start date of contract.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Price Bid 150 MLD 5 year o and m.pdf
2 150 MLD Techanical Bid PDF GCC.pdf
sh-B.pdf
Tender Circuler Stander bid documents sudharo.pdf
3. O and M circular for 5 year_31072024.pdf
8. Laghutam Vetan Paripatra Dtd 01.04.24.pdf
16. Vigilance Insurance Dt 19 03 12 GR.pdf
20. Circular GST 07-01-22(1).pdf
21. Circular of GST 10.7.17.pdf
DMO_2941_01-Apr-2026_744.pdf
IP Address.pdf
Letter for nCode Mobile App.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .