Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.1 L+₹76,650 (12.0%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.3 L+₹96,150 (15.1%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹7.7 L+₹1.4 L (21.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹7.9 L+₹1.6 L (24.8%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
18 Mar 2020, 2:00 pmClosed
VARGHESE P O
DMM P AND P FACT LTD
Pre-Fabrication And Erection of Sulphuric Acid Lines in Connection with replacement of in CI lines of FAT pumping lines and SA pumping lines from SAP to PAP, FACT-CD.
2020_FACT_549175_1
04097/2019-2020/E21207
Limited
Miscellaneous Services
Item Rate
180 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM102A)
3 documents required · 3 mandatory
₹0
₹12,000
Yes
26 Mar 2020
2 Mar 2020
19 Mar 2020
2 Mar 2020
18 Mar 2020
2 Mar 2020
Pre-Fabrication And Erection of Sulphuric Acid Lines in Connection with replacement of in CI lines of FAT pumping lines and SA pumping lines from SAP to PAP, FACT-CD.
Fabrication of Pipeline and Fittings with SS 316 L Materials size 80NB to 400 NB for replacing CI pipes and fittings in FAT pumping lines and SA pumping line from SAP to PAP, FACT-CD. Work involves:- The required materials shall be transported from store / site. New pipes, fitting, special fittings etc. shall be fabricated with SS 316 L material. The required mitre bends / mitre fittings shall also be fabricated if required to suit the site conditions in SS 316L material. Elbows, tees and reducers shall be fabricated in addition as required at site in SS316L material. The pipes shall be cut by plasma cutting machine, length as per instructions from engineer in charge. Pipe ends shall be ground properly and take suitable bevel / single Vee. The pipes / fittings / mitres shall be fabricated by TIG Welding (with argon purging) with stub ends and MS flanges / welded SS 316L flanges. All welding shall be 100% DP tested. Pipes shall be in pieces or in full pipe length as per instructions from engineer in charge.
Erection of Fabricated SS 316 L Pipe and Fittings. Work involves:- Make necessary site arrangements for the work. The newly fabricated SS 316 L pipe lines with fittings shall be transported to site. The SS 316 L pipes with fittings shall be erected / fixed in position at all elevations with proper gaskets and fasteners / welding pipe joint at site. Flange joints shall be tightened properly to avoid any leakage. Temporary supports shall be provided as required. The route / orientation of the pipelines shall be as per approved drawings / site instructions. Any pipelines joint requires welding at site shall be done by TIG welding only after proper bevelling of joints. The pipelines shall be erected without any strain. Any rework required shall be done. All welding joints shall be 100% DP tested. Pipelines shall be erected along side existing lines and necessary supports shall be provided and during ATA / shutdown connections shall be given. After complete erection entire pipeline circuit shall be successfully leak tested. Site shall be cleared off scrap, unused pipes shall be neatly stacked in the area earmarked.
Fabrication and Erection of Pipeline Supports. Work involves:- Collection of required materials from FACT -CD stores / plant area and transport to the work site at SA Plant. New structural supports for pipelines / pipe bridges / saddle supports etc. shall be fabricated and erected at site as per relevant drawing/ instruction of the officer - in -charge to meet site requirement.
Dismantling and Removal of Pipelines / Structurals. Work involves:- The existing CS / CI pipelines [all sizes] and structural supports, pipe bridges shall be cut and removed from all heights and elevations as per the instructions from engineer in charge to facility erection and rerouting of cooling water and acid headers. Damaged pipes shall be transported to scrap yard, after taking the weight and deposited in the appropriate areas ear marked for different materials. Usable materials shall be transported to specific locations and neatly stacked as per instruction.
GOPINATHA PANICKER ENGINEERING CONTRACTOR
M M THAMBI
PAREETH V V
BABY B
K G SIVANANDAN
HASSAN MM
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_575536.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .