| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.1 L
EMD Value
₹30,000
Closing Date
30 Jun 2026, 5:00 pmClosed
Superintending Engineer RWSS Division Rourkela
RWSS Division Rourkela
Construction of office building for RWSS Section Koida under RWSS Division Rourkela
2026_RWSS_131957_1
01 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Koida
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹30,000
Yes
3 Jul 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
30 Jun 2026
18 Jun 2026
18 Jun 2026 - 30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work:- Earthwork in excavation of foundation in all kinds of soil within initial lead of 50m. and initial lift of 1.50m. etc. all complete as per the direction of Engineer-in-charge. | 0.4 | Cum. | 293.37 | ₹117.05 |
| 2 | Supplying all labour, T&P and material for providing and filling sand in F&P including watering and ramming and conveyance of materials to work site as per the dirction of Engineer-in-charge. | - | Cum. | 934 | - |
| 3 | Supplying all labour, T&P and material for Providing C.C. (1:3:6) using 4cm. size CBHG metal including watering, curing and conveyance of all materials to work site etc. complete as per the dirction of Engineer-in-charge. | - | Cum. | 6,722 | - |
| 4 | Supplying all labour, T&P and material for Providing C.C. (1:1.5:3) using 12mm size CBHG chips for RCC works including watering, curing, hoisting, laying and conveyance of all materials to work site etc. complete as per the dirction of Engineer-in-charge. | 1 | Cum. | 9,004 | ₹8,995 |
| 5 | Supplying all labour, T&P and material for Providing Fly ash Brick msonry work in cm (1:6) using 25x12x8 cm. size FA bricks inclduing watering, curing and conveyance of all materials to work site etc. complete as per the dirction of Engineer-in-charge
.(a) Foundation & Plinth | 1 | Cum. | 6,001 | ₹5,995 |
| 6 | 5. (b) Super Structure | 0.8 | Cum. | 6,034 | ₹4,821.17 |
| 7 | Supplying all labour, T&P and material for Providing rigid & smooth centering and shuttering for RCC works including false work and dismantling them after casting etc. complete as per the dirction of Engineer-in-charge.
(a) Base of Column | 1 | Sqmt | 254 | ₹253.75 |
| 8 | 7. (a) Lintel | - | Sqmt | 578 | - |
| 9 | 7. (b) Roof Slab & Chajja | 0.2 | Sqmt | 759 | ₹151.04 |
| 10 | 7.(c )Beam & Column | 1 | Sqmt | 1,200 | ₹1,198.8 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
KOIDADTCN.pdf
Tender Documents • 4.57 MB
BOQ_596291.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .