Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.1 LAccepted-AOC DARPAN RAM | 1 | Accepted-AOC Lowest Rates |
Tender Value
₹35.2 L
EMD Value
₹71,000
Closing Date
27 Oct 2021, 3:00 pmClosed
EE ID BAGESHWAR
ID BAGESHWAR
Renovation of 1 no minors under nabard of 24no 53.420 Km scheme of block Garur distt Bageshwar GADSER Minor Job no 08
2021_IRDCE_37229_1
JOB NO 8
Open Tender
Civil Works - Canal
Item Rate
180 days
GARUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
EE ID BAGESHWAR
₹71,000
Yes
21 Jan 2023
11 Oct 2021
27 Oct 2021
11 Oct 2021
27 Oct 2021
22 Oct 2021
Amount
Earth work in Excavation in Foundation of wall i/c all cost of labour T&P etc .
Plain cement concrete with cement,coarse sand and 40mm gauge stone ballast in proportion 1:4:8 in foundation i/c supply of all materials, Labour,T&P etc. complete all as per specification.
RR 1:6 Stone Masonry in wall i/c all cost of Labour Materials T&P etc.complete all as per Specification.
RR Dry Stone Masonry in wall i/c all cost of Labour Materials T&P etc.complete all as per Specification.
HP Stone Filling in back of wall i/c all cost of Labour Materials T&P etc. complete all as per specification.
RR 1:5 Stone Masonry in Minor. i/c all cost of Labour Materials T&P etc.complete all as per Specification.
Cement Pointing 1:3 in Minor i/c all cost of labour Materials T&P etc. complete all as per Specification.
C.C in 1:3:6 nominal mix. Including supply of all cost of Materials,labour,T&P, royalty etc. Complete all as per specification.
C.C in 1:2:4 nominal mix. Including supply of all cost of Materials,labour,T&P, royalty etc. Complete all as per specification.
Cement plaster 15mm thick 1:4 on stone masonry i/c supply of all Materials,labour, T&P,royalty etc. complete all as per Specification.
R.C.C in M-20(1:2:4) Including supply of all cost of Materials,labour,T&P, royalty etc. Required for proper completion of work as per specification.
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification
laying 500mm dia cement concrete pipe NP3 (burried conduits) on first class bedding of granullar materia including fixing collar with cement sand mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary work in head wall and parapets.
Cooling Walling i/c all cost of Labour Materials T&P etc. complete.
Slip/Loose materials clearance.(by manual means)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .