Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10,893.94Admitted-Finance | -32.00% | ₹10,893.94 | L1 | Admitted-Finance |
| 2 | L2₹11,022.10+₹128.16 (1.18%)Admitted-Finance | -31.20% | ₹11,022.10+₹128.16 (1.18%) | L2 | Admitted-Finance |
| 3 | L3₹11,887.21+₹993.27 (9.12%)Admitted-Finance | -25.80% | ₹11,887.21+₹993.27 (9.12%) | L3 | Admitted-Finance |
| 4 | L4₹12,015.38+₹1,121.43 (10.3%)Admitted-Finance | -25.00% | ₹12,015.38+₹1,121.43 (10.3%) | L4 | Admitted-Finance |
| 5 | L5₹13,104.77+₹2,210.83 (20.3%)Admitted-Finance | -18.20% | ₹13,104.77+₹2,210.83 (20.3%) | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
1 Jun 2026, 6:00 pmClosed
XEN CMD SVP
Kangan
Securing Headworks, beat quarter and canal b w o Installation of gates and Barbed wire chain link fencing.
2026_SPDC_309647_1
CMD SVP K 01 of 2026
Open Tender
Civil Works
Percentage
45 days
SUMBAL
Please refer Tender documents.
4 documents required · 4 mandatory
₹505
CPAO USHP II
₹20,000
Yes
4 Jun 2026
9 May 2026
3 Jun 2026
10 May 2026
1 Jun 2026
10 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | - | cum | 256.85 | - |
| 2 | Providing and laying stone boulders of size upto 200mm including carraige complete job as per direction of engineer in charge. | - | cum | 1,000 | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | 286.35 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 6,591.25 | - |
| 5 | Structural steel work in single section, fixed with or wiyhout connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | Kgs | 120.8 | - |
| 6 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire | - | Meter | 19.85 | - |
| 7 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge. Made of G.I. wire of dia 4 mm | - | Sqm | 809.9 | - |
| 8 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angles 40x40x6mm for diagonal braces | - | Sqm | 5,493.9 | - |
| 9 | Cement avg. lead 5km | - | mt | 178.43 | - |
| 10 | Aggregate avg lead 10km | - | cum | 279.04 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.58 MB
BOQ_1002272.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .