Loading…
Loading…
Tender Value
₹19.3 L
EMD Value
₹19,276
Closing Date
27 Jun 2026, 5:00 pmClosed
G.M WATCO Division, Rourkela
G.M WATCO Division, Panposh,Rourkela
Construction of under ground sump at Hostel No 1 to 4 inside the Campus of Govt ITI Rourkela
2026_WDRKL_132273_1
Bid Identification No. GMWATCORKL-05 /2026-27 dt. 09.06.2026
Open Tender
Civil Works - Water Works
Percentage
60 days
Rourkela
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹19,276
Yes
23 Jul 2026
18 Jun 2026
29 Jun 2026
18 Jun 2026
27 Jun 2026
18 Jun 2026
18 Jun 2026 - 25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m. initial lead and 1.5m.initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the Department. | 230.72 | % cum | 29,952.7 | ₹69,10,686.94 |
| 2 | Supplying all materials, labour, T&P and providing for Filling F & P with sand, well watered and rammed including cost, conveyance, royalty or materials. | 9.33 | Cum | 601.6 | ₹5,612.93 |
| 3 | Supplying all materials, labour, T&P and providing for C.C. (1:3:6) using 40mm. size hard granite metal including laying compacting, curing with all cost, conveyance, royalty of materials etc. | 9.33 | Cum | 6,087.5 | ₹56,796.38 |
| 4 | Supplying all materials, labour, T&P and providing C.C. (1:11/2:3) using 12mm. size down graded H.G.C.B. chips for RCC work including laying. compacting, curing with all cost, conveyance, royalty of materials etc. | 46.48 | Cum | 8,461.9 | ₹3,93,309.11 |
| 5 | Supplying all materials, labour, T&P and providing M.S. Reinforcement for R.C.C. works including cutting, bending, binding and tying grills and placing in position including cost of M.S. Rods, binding wire 18 to 20 gauge. | 46.48 | Qntl | 8,837.1 | ₹4,10,748.41 |
| 6 | Supplying all materials, labour, T&P and providing Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground (RCC foundation, Plinth band, footings, column base, Mass Sump 1 & 2 , Sump No. 3 & 4
Raft | 13.86 | Sqm | 261.1 | ₹3,618.85 |
| 7 | RCC beeams, columns, griders & bressmere etc. for Sump 1 & 2 , Sump No. 3 & 4 | 262.42 | Sqm | 1,204.5 | ₹3,16,084.89 |
| 8 | Roof slab for Sump 1 & 2 , Sump No. 3 & 4 | 36 | Sqm | 762.1 | ₹27,435.6 |
| 9 | Supplying of all materials, 2. thick grading concrete (2:2) on roof slab with 6mm. Size on new work crusher broken Granite chips with all cost, conveyance & taxes etc. all complete as per P.W.D. specification & direction of Engineer-in-charge | 55.42 | Sqm | 379.8 | ₹21,048.52 |
| 10 | Supplying all material, labour T&P and 12 mm. thick cement plaster in cement mortar (1.4) over RCC work including lead & royalty of materials etc for Sump 1 & 2 , Sump No. 3 & 4 | 106.26 | Sqm | 198.6 | ₹21,103.24 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
DTCN.pdf
Tender Documents • 1.66 MB
BOQ_596813.xls
BOQ • 0.27 MB
Corrigendum.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .