Tender Value
₹7.1 L
EMD Value
₹8,000
Closing Date
17 Jul 2026, 6:00 pm
Executive Engineer, Kachchh Branch Canal , Division No. 2/6,Bhachau
Repairing and laying Chainlink Wire fancing for safety purpose at CSY for Kachchh Branch Canal @ Ch. 166.910 km.
313883
04 of 2026-27
Open
Civil Works
Kutch
13 documents required · 13 mandatory
₹1,062
Executive Engineer, Kachchh Branch Canal Division no.2/6,Bhachau
₹8,000
3 Jul 2026
3 Jul 2026
3 Jul 2026
17 Jul 2026
3 Jul 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and
verified by the Engineer and valued at the rates and prices tendered in the priced Bill
of Quantities, where applicable, and otherwise at such rates and pricesas the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied in
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered
in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor of
at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of Work:- Repairing and laying Chainlink Wire fancing for safety purpose at CSY for Kachchh
Branch Canal @ Ch. 166.910 km.
Description of Item Unit Quantity Rate in Rs Amount in Rs
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
1 materials and disposing off the excavated 14.00 Cum 210.42
stuff upto 50 Meter lead. (A) Loose or soft
Providing and laying cement concrete 1:2:4
(1- Cement : 2-Coarse sand : 4- graded
2 stone aggregates 20 mm nominal size) and 14.00 Cum 3703.19
curing complete excluding cost of formwork
in (A) Foundation and Plinth
Providing and fixing to wall, ceiling and floor
galvanised Mild steel tubes (Medium grade)
3 of the following nominal bore, tube fitting 222.00 Rmt 602.33
and clamps including making good the wall
ceiling and floor. (E) 40mm
Providing and fixing to wall, ceiling and floor
galvanised Mild steel tubes (Medium grade)
4 of the following nominal bore, tube fitting 550.00 Rmt 496.01
and clamps including making good the wall
ceiling and floor. (D) 32mm
Steel work, welded in built up sections
framed work including cutting, hoisting,
fixing in position and applying a priming coat
of red lead paint. (A) In beams and joists,
channels angles Tees, flats, with connecting
plates or angle cleats as in main and cross
beams. Hip and jack rafters, purlins
conneted to common rafters and the like
Providing and fixing Chain link, 2 inch 10 x
10 Guage G.I. Wire for Fencing including
labour charges for erecting in line and level
with rivetting as directed etc. complete.
Painting two coats (excluding priming coat)
on new steel and other metal surface with
enamel paint, brushing, interior to give an
7 even shade including cleaning the surface 412.50 Sqmt 91.29
an even shade including cleanicn the
surface of all dirt, dust and other foreign
percent (Should be written in figures and words) of the estimated rate
mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender:- 709349.12/- Estimated amount put to tender:- 709349.12/-
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure)
(C)Net Tendered Amount (A-B) (in figure)
1 The Contractor shall exhibit a board with detailed specification and details
of work as directed by the Engineer-In-Charge for which no extra payment
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work
3 GST and Income tax TDS will be deducted at a source while making
payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been
taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Divisional Accountant Executive Engineer
Bhachau Bhachau
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD of Chain linking fancing work.pdf
Drawing of Chain linking work.pdf
2.Technical Specifications (Sec-V).pdf
BOQ fencing.pdf
Download all tender documents and submit your bid