Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 LAccepted-AOC RUDRAPRAYAG | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹28.2 L Quoted ₹29.6 L | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹36.9 LRejected-Finance BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹36.9 L | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | L3₹43.2 LRejected-Finance | ₹43.2 L | L3 | Rejected-Finance NOT QUALIFIED |
| Sl No | Description | Qty | Unit | Aarna Electrical And Co L2 | FLORA TECHNOLOGIES L3 | DEVENDRA SINGH BHANDARI L1 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | ||||||
| 2.00 | DEAD END CLAMP WITH I HOOK ABCABLE SP-21 | 29 | NOS | 17,255 ₹17,255 | 17,690 ₹17,690 | 14,355 ₹14,355 |
| 3.00 | PG Clamp 25 to 25 mm line to line | 56 | NOS | 16,688 ₹16,688 | 17,920 ₹17,920 | 11,088 ₹11,088 |
| 4.00 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 20 | NOS | 7,660 ₹7,660 | 8,200 ₹8,200 | 5,660 ₹5,660 |
| 5.00 | SUSPENSION CLAMP WITH EYE HOOK | 93 | NOS | 55,335 ₹55,335 | 64,635 ₹64,635 | 46,035 ₹46,035 |
| 6.00 | SHACKLE INSULATOR 100X115 mm WITH N&B | 20 | NOS | 1,780 ₹1,780 | 2,200 ₹2,200 | 1,580 ₹1,580 |
| 7.00 | PIERCING CONNECTOR 95 SQ.mm - 50
SQ.mm | 78 | NOS | 24,960 ₹24,960 | 25,116 ₹25,116 | 24,024 ₹24,024 |
| 8.00 | SHACKLE INSULATOR CLAMP FOR SP-21 | 20 | NOS | 7,000 ₹7,000 | 7,100 ₹7,100 | 6,420 ₹6,420 |
| 9.00 | LT BARE N.CONN. PG CLAMP FOR DB 50-50MM² | 80 | NOS | 17,600 ₹17,600 | 25,600 ₹25,600 | 15,840 ₹15,840 |
| 10.00 | IPC 70/35 sqmm For line to line tapping | 76 | NOS | 23,560 ₹23,560 | 24,320 ₹24,320 | 23,408 ₹23,408 |
Tender Value
Refer Docs
EMD Value
₹54,000
Closing Date
17 Jun 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Replacement of Bare Conductor L.T. Line By AB Cable at Bangaon Gramsabha under Electricity Distribution Rudrapryag
2025_UPCL4_84214_1
14/EDC(K)/2025-26
Open Tender
Repair and Maintenance Works
180 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹2,360
EE EDD GOPESHWAR
₹54,000
29 Dec 2025
23 May 2025
18 Jun 2025
24 May 2025
17 Jun 2025
24 May 2025
SUPPLY OF MATERIAL PORTION
DEAD END CLAMP WITH I HOOK ABCABLE SP-21
PG Clamp 25 to 25 mm line to line
STAY CLAMP FOR SP-21 WITH NUT & BOLT
SUSPENSION CLAMP WITH EYE HOOK
SHACKLE INSULATOR 100X115 mm WITH N&B
PIERCING CONNECTOR 95 SQ.mm - 50 SQ.mm
SHACKLE INSULATOR CLAMP FOR SP-21
LT BARE N.CONN. PG CLAMP FOR DB 50-50MM²
IPC 70/35 sqmm For line to line tapping
IPC 70 sqmm to 25sqmm for Dist. box
Head shrink type end caps for LT ABC
1Ph. LT Dist. Box, inbuilt panel lock
3Ph. LT Dist. Box, inbuilt panel lock
LT XLPE Cable 1x35 sqmm
LT AB Cable 3x35+1x25 sqmm
LT AB Cable 1x35+1x25 sq.rmm.
Crimping Type Al lug (25-100)Sqmm
MS Half Clamp for LT Distribution Box
LABOUR PORTION
ERECTION OF EARTHING ROD
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-21 POLE
MUFFING OF POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 2 P 3 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
PAINTING OF SP-21/23 POLE
CARTAGE SP-21/23 POLE, 71-100 KM
CARTAGE OF PETTY MATERIAL,71-100 KM
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
LAYING OF LT AB CABLE 3X35+1X25 SQMM
Straight of Tilted Poles of STP SP 10
Straight of Tilted Poles of STP SP 21
BACK CARTAGE OF PETTY MATERIAL,71-100 KM
Installation of LT Distribution Box
Laying and fixing of 1x35sqmm XLPE Cable
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
DISCONN & RECONN. OF SERVICE CONN. 1PH.
LAYING OFLT AB Cable 1x35+1x25sqmm
Aarna Electrical And Co (BID ID -387111)
FLORA TECHNOLOGIES (BID ID -387135)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid