Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-I₹78.0 LAccepted-Finance | ₹78.0 L | H-I | Accepted-Finance Bid Valid |
| 2 | H-II₹1.4 CrAccepted-Finance | ₹1.4 Cr | H-II | Accepted-Finance Bid Valid |
| 3 | Not Admitted-Fee | - | - | Not Admitted-Fee RFP conditions not met |
| 4 | Not Admitted-Fee | - | - | Not Admitted-Fee RFP conditions not met |
| 5 | Not Admitted-Fee | - | - | Not Admitted-Fee RFP conditions not met |
Tender Value
Refer Docs
Closing Date
30 Sept 2021, 3:00 pmClosed
Regional Officer, MoRTH, Gandhinagar
Office of the Regional Officer (Gujarat, Daman and Diu, Dadar and Nagar Haveli) Ministry of Road Transport and Highways 4th Floor, Block no. 14, New Sachivalaya Gandhinagar, Gujarat
Consultancy Services for Detailed Project Report Preparation for upgradation of existing 6 Lane road including elevated corridor as per site requirements from km 0/00 to km 12/00 of NH-47 (Narol Jn to Ujala Jn.) in the State of Gujarat.
2021_MoRTH_636047_2
RW/GNR/DPR NH-47/2021
Open Tender
Consultancy
Works
300 days
Ahmedabad
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Bharatkosh
Exempted
Gandhinagar
3 Jan 2022
6 Sept 2021
1 Oct 2021
6 Sept 2021
30 Sept 2021
15 Sept 2021
14 Sept 2021
Amount
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixining boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Total Cost net of GST:
Sub Total Including GST
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed Topographic surveys using mobile /aerial LiDAR or betterTechnology.
Description of Work / Item(s)
Amount
Procuring and Fixing boundary pillars and its installation , complete in all respect as per IRC:25,1967:Whereve the proposed alignment follows the exissting alignment, the boundary pillars shall be fixed at an interaval of 200m on either side of proposed right of way. Wherever there is a proposal of realignment of the existing Highway and/or construction of new bypass, consutant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval (lumsum)
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer/equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring)
a) Boring in all type of soils (other than hard rock) ,(for project of length <110km ) or 2000m( for project of length >110 km ) ,Qty. in m.
b)Boring in hard rock ,(for project of length <110km ) or 300m( for project of length >110 km ) ,Qty. in m.
Sub Total
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Description of Work / Item(s)
Amount
Lumsum
Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Amount
Airlines
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Amount
Miscellaneous expenses
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment)
STAFF 1
STAFF 2
STAFF 3
STAFF 4
STAFF 5
STAFF 6
STAFF 7
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The rent cost includes maintenance, Cleaning, repairs, etc.
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Computer Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Indian Technocrat Limited
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
Casta Engineers Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .