Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.0 LAdmitted-Finance | ₹62.0 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹48.2 L (77.7%)Admitted-Finance | ₹1.1 Cr+₹48.2 L (77.7%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹55.9 L (90.3%)Admitted-Finance | ₹1.2 Cr+₹55.9 L (90.3%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹97.1 L (156.7%)Admitted-Finance | ₹1.6 Cr+₹97.1 L (156.7%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹1.4 Cr (227.4%)Admitted-Finance | ₹2.0 Cr+₹1.4 Cr (227.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | visakhatrades L5 | VIZAG ENGINEERING L1 | SHASI ENTERPRISES L4 | ST JOSEPH FIBER AND GENERAL ENGINEERING WORKS L2 | Dreamtech Builders L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Condensation and leakage observed from deck head panelling of cool and cold rooms. Carryout repairs. Repair Scope of work includes renewal of insulation on the deckhead. No. of rooms - 04 nos | 100 | M2 | 2,237.5 ₹6,86,250 | 1,500 ₹1,75,000 Lowest | 3,000 ₹6,00,000 | 6,150 ₹7,15,000 | 750 ₹3,00,000 |
| 2.00 | Renewal of damaged Lagging in payload compartment and other accommodation spaces. Scope of work involves removal of trunking, old damaged lagging, executing pin welding, adhesive pasting of lagging with glass tape and refitment of trunking in payload compartment. Renewal of lagging including pin welding, adhesive pasting of lagging with glass tape in accommodation spaces. Renewal to be undertake with FAT insulation complying to NCD 1430 Issue 2. Only FAT Insulation, Glass tape, Pins & Self locking washers will be supplied by yard. Remaining all accessories like glue, welding electrodes etc., for execution of above job will be under contractor scope | 900 | M2 | 1,700 ₹19,57,500 | 750 ₹6,75,000 | 2,000 ₹27,00,000 | 400 ₹4,50,000 Lowest | 1,000 ₹25,20,000 |
| 3.00 | Carry out Insulation checks of all Cool/Cold rooms. Scope of work includes removal of all layers of paneling, checking of insulation and refitment of all layers of paneling. Total compartments - 08 | 8 | NOS | 8,75,000 ₹70,00,000 | 22,000 ₹2,04,000 | 25,000 ₹2,00,000 | 2,00,000 ₹16,00,000 | 12,500 ₹1,72,000 Lowest |
| 4.00 | Visually examine the entire length of cold lagging. Renewal of damaged cold lagging. Scope of work includes removal of damaged cold lagging, supply and installation of new cold lagging, as per existing type in the ship. Approx Total Length -350 mtr | 350 | M | 1,900 ₹15,13,750 | 500 ₹5,07,500 Lowest | 1,000 ₹14,00,000 | 1,200 ₹7,35,000 | 750 ₹7,87,500 |
| 5.00 | Visually examine entire length of hot lagging for domestic hot water system. Renewal of damaged hot lagging. Scope of work includes removal of damaged hot lagging, supply and installation of hot lagging, as per existing type in the ship. Approx Length - 200 mtrs | 200 | M | 2,800 ₹16,47,500 | 450 ₹1,70,000 Lowest | 1,200 ₹9,40,000 | 500 ₹2,20,000 | 750 ₹4,50,000 |
| 6.00 | Removal and refitment of exhaust silencer cladding and lagging, Size - 250mm, 06 qty | 6 | M | 10,437.5 ₹62,625 | 1,800 ₹23,400 | 5,000 ₹30,000 | 1,200 ₹7,200 Lowest | 1,500 ₹42,000 |
| 7.00 | Renewal of old cladding and lagging for exhaust silencer, Size - 250mm, 06 qty. Scope of work includes removal of old cladding-lagging and fitment of new cladding-lagging | 6 | M | 3,900 ₹70,275 | 1,800 ₹23,400 | 2,000 ₹42,000 | 1,200 ₹20,400 Lowest | 1,500 ₹42,000 |
| 8.00 | "Removal and refitment of exhaust line cladding and lagging. Dia 350MM. Mat. - MS, Qty - 15 Mtrs | 15 | M | 11,400 ₹1,71,000 | 2,200 ₹72,000 | 3,000 ₹45,000 | 1,400 ₹21,000 Lowest | 1,500 ₹1,12,500 |
| 9.00 | Renewal of old cladding and lagging for exhaustsilencer. Dia 350MM. Mat. - MS, Qty - 15 Mtrs.Scope of work includes removal of old claddinglaggingand fitment of new cladding-lagging | 15 | M | 12,437.5 ₹1,86,562.5 | 2,200 ₹72,000 | 5,000 ₹1,65,000 | 1,400 ₹54,000 Lowest | 1,500 ₹1,12,500 |
| 10.00 | Renewal of hot lagging and metal cladding on various main and auxiliary machinery (M/E, Combat Das, DGs, DD Firmain, DD HPAC, EDA etc). Area - Hot Lagging 200 mtrs, Cladding 100 Mtrs. Scope includes removal of old lagging-cladding and fitment of new lagging-cladding | 300 | M | 2,025 ₹31,38,750 | 2,500 ₹13,20,000 | 2,500 ₹22,50,000 | 5,666 ₹20,19,600 | 1,450 ₹12,75,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
23 Feb 2026, 11:00 amClosed
M(SRC-OS)
HSL
Accommodation Degutting and Regutting Work ON 22050
2026_HSL_98964_1
SR COMPLEX/PRODUCTION/OUT SOURCEREQUISITION/2025/796
Open Tender
Miscellaneous Services
Service
30 days
VISAKHAPATNAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹90,000
Yes
16 Apr 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
Condensation and leakage observed from deck head panelling of cool and cold rooms. Carryout repairs. Repair Scope of work includes renewal of insulation on the deckhead. No. of rooms - 04 nos
Renewal of damaged Lagging in payload compartment and other accommodation spaces. Scope of work involves removal of trunking, old damaged lagging, executing pin welding, adhesive pasting of lagging with glass tape and refitment of trunking in payload compartment. Renewal of lagging including pin welding, adhesive pasting of lagging with glass tape in accommodation spaces. Renewal to be undertake with FAT insulation complying to NCD 1430 Issue 2. Only FAT Insulation, Glass tape, Pins & Self locking washers will be supplied by yard. Remaining all accessories like glue, welding electrodes etc., for execution of above job will be under contractor scope
Carry out Insulation checks of all Cool/Cold rooms. Scope of work includes removal of all layers of paneling, checking of insulation and refitment of all layers of paneling. Total compartments - 08
Visually examine the entire length of cold lagging. Renewal of damaged cold lagging. Scope of work includes removal of damaged cold lagging, supply and installation of new cold lagging, as per existing type in the ship. Approx Total Length -350 mtr
Visually examine entire length of hot lagging for domestic hot water system. Renewal of damaged hot lagging. Scope of work includes removal of damaged hot lagging, supply and installation of hot lagging, as per existing type in the ship. Approx Length - 200 mtrs
Removal and refitment of exhaust silencer cladding and lagging, Size - 250mm, 06 qty
Renewal of old cladding and lagging for exhaust silencer, Size - 250mm, 06 qty. Scope of work includes removal of old cladding-lagging and fitment of new cladding-lagging
"Removal and refitment of exhaust line cladding and lagging. Dia 350MM. Mat. - MS, Qty - 15 Mtrs
Renewal of old cladding and lagging for exhaustsilencer. Dia 350MM. Mat. - MS, Qty - 15 Mtrs.Scope of work includes removal of old claddinglaggingand fitment of new cladding-lagging
Renewal of hot lagging and metal cladding on various main and auxiliary machinery (M/E, Combat Das, DGs, DD Firmain, DD HPAC, EDA etc). Area - Hot Lagging 200 mtrs, Cladding 100 Mtrs. Scope includes removal of old lagging-cladding and fitment of new lagging-cladding
Sea water found accumulating in drain from exhaust NR Flap of Port DA. Suspect NR Flap dislodged/ loose. Carry out overhauling of valve. Replace if found BER. Overhauling of valve & replacement will be carried out by yard. Contractor scope of work involves removal and renewal of exhaust lagging and cladding. Type - NR Flap Type, Dia - 350mm, Mat - MS"
Supply and fitment of perforated sheets to protect compartment lagging at engineering lab ladder spaces of AMR 3 and AMR 4.
Degutting and Regutting of all type of paneling, including but not limited to CRCA, SS, GI & perforated in way of Steel Renewals in various compartments.
Removal of all type of lagging/insulation, including but not limited to FAT, MWMB & MFMB in way of Steel Renewals in various compartments.
Degutting and Regutting of all type of accommodation items, including but not limited to bunks, Lockers, Tables, Sofas, Galley items in way of Steel Renewals in various compartments.
Removal of all type of flooring, including but not limited to epoxy/Microtech, FRP, cement, Tiles & Cement in way of Steel Renewals in various compartments
Heavy corrosion observed under WC and bath space cubicles on deck in AFT PO bath room , Jr sailors electrical bath room, Jr sailor seamen bath room. Scope of work entails removal of bathroom cubicles including all fittings and refitment back to its location post completion of following works (survey, repair/renewal of deck and epoxy flooring/ deck covering) by the yard.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tender_documents.rar
Tender Documents • 12.56 MB
BOQ_108534.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .