Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 472 C 1 TOCOL MACHINE TOOLS PRIVATE LIMITED 13TH CROSS 4TH PHASE PEENYA INDUSTRIAL AREA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically rejected since the firm has not submitted the documentary proof as requested in CSL tender |
Tender Value
Refer Docs
Closing Date
28 Nov 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM(SRM)
Ship Repair Materials Department Cochinshipyard LTD Perumanoor PO
TBU JOBS IN NAVY VESSEL (RM.0807)
2024_CSL_215595_1
CSL/SR1/ADV357
Open Tender
Marine Services
Works
90 days
Karwar/ CSL/ Cochinport
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Dec 2024
21 Nov 2024
29 Nov 2024
21 Nov 2024
28 Nov 2024
21 Nov 2024
21 Nov 2024 - 28 Nov 2024
Amount
TD Auxiliaries - TBU (Turbo Blower Unit) - SERVICE COST
1.3.15. The regular maintenance of TBU shall be made in 5 years of operation. The maintenance shall be made with removal of upper halves of steam turbine, gas turbine, compressor and inspection of flow part. The content and the sequence of inspection are set out in operational manual.
1.3.16. Remove air bypass flap from the line. clear the innner part of housing and valve housing.
1.3.17. Open TBU flap spindle shaft bearings and intermediate shaft bearings, valves, wash them down and fill with lubrication grease lithol-24 gost 21150-87. Assemble and install the valve. check the proper operation of the valve. qty - 8
1.3.18. Check the settings for the key components of regulation, control, and protection system 1.3.18.1. Command block, 1.3.18.2. Over speed regulator, 1.3.18.3. Locking device 1.3.18.4. Lubrication lock-up valve Qty - 04 components
1.3.20. Check condition of turning gear assembly, engaging/disenganing mechanism, overhauling as required
1.3.21. Inspect condition of bellows and compensators of system of various sizes, Repair/ renew as required (05 per TBU)
1.3.22. Overhauling of lub oil flow orifices, fliter body and filter element.
1.3.23. Inspection of mounts and foundation of gearbox and pump casing.
Hot Lagging & Cladding - SERVICE COST
1. 42. 5 Cladding over Steam auxiliary machineries 1.42.5.3 TBU
TBU AIR INTAKE AND EXHAUST SYSTEM - SRVICE COST
Carry out visual inspection of the damping branch pipes and their cleaning. replace the branch pipes, in case of deterioration of the rubber surfaces. qty - 08 units ,job includes removal /repair /renewal /degutting if required/fitment
Boilers and TD Auxiliaries - SERVICE COST
Renewal /Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (TBU's)
TD Auxiliaries - TBU (Turbo Blower Unit) - MATERIAL COST
1.3.15. The regular maintenance of TBU shall be made in 5 years of operation. The maintenance shall be made with removal of upper halves of steam turbine, gas turbine, compressor and inspection of flow part. The content and the sequence of inspection are set out in operational manual.
1.3.16. Remove air bypass flap from the line. clear the innner part of housing and valve housing.
1.3.17. Open TBU flap spindle shaft bearings and intermediate shaft bearings, valves, wash them down and fill with lubrication grease lithol-24 gost 21150-87. Assemble and install the valve. check the proper operation of the valve. qty - 8
1.3.18. Check the settings for the key components of regulation, control, and protection system 1.3.18.1. Command block, 1.3.18.2. Over speed regulator, 1.3.18.3. Locking device 1.3.18.4. Lubrication lock-up valve Qty - 04 components
1.3.20. Check condition of turning gear assembly, engaging/disenganing mechanism, overhauling as required
1.3.21. Inspect condition of bellows and compensators of system of various sizes, Repair/ renew as required (05 per TBU)
1.3.22. Overhauling of lub oil flow orifices, fliter body and filter element.
1.3.23. Inspection of mounts and foundation of gearbox and pump casing.
Hot Lagging & Cladding - MATERIAL COST
1. 42. 5 Cladding over Steam auxiliary machineries 1.42.5.3 TBU
TBU AIR INTAKE AND EXHAUST SYSTEM - MATERIAL COST
Carry out visual inspection of the damping branch pipes and their cleaning. replace the branch pipes, in case of deterioration of the rubber surfaces. qty - 08 units ,job includes removal /repair /renewal /degutting if required/fitment
Boilers and TD Auxiliaries - MATERIAL COST
Renewal /Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (TBU's)
TOCOL MACHINE TOOLS PRIVATE LIMITED (BID ID -775267)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .