Loading…
Loading…
Tender Value
₹45.1 L
EMD Value
₹90,120
Closing Date
28 Apr 2026, 4:00 pmClosed
Executive Engineer RnB Division Tangmarg
Executive Engineer RnB Division Tangmarg
Construction of Primary School Malikpora Katipora (Building less Primary).
2026_PWDJK_308071_1
NIT No.03/RnB/Tangmarg of 2026-27
Open Tender
Civil Works
Percentage
180 days
Tangmarg
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Division Tangmarg
₹90,120
17 Apr 2026
17 Apr 2026
29 Apr 2026
18 Apr 2026
28 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | - | Cum | - | - |
| 2 | Providing and laying of Stone solling, Hand packed ,levlling ,filling of voids including all leads , lifts & carriage of same upto site of work complete. | - | Cum | - | - |
| 3 | Filling of availble excavated soil with in 50 mt of lead including loading unloading all complete. | - | Cum | - | - |
| 4 | Filling of rooms with nallah muck/ dstone dust including loading unloading all complete. | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in superstructure including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | - | Cum | - | - |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and
other frames, wrought framed and fixed in position with hold fast lugs or with
dash fasteners of required dia and length (hold fast lugs or with dash fasteners
shall be paid for separately): Imported Kail Wood | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_998791.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .