| 1 | 1₹6.9 LAccepted-AOC B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹7.5 L+₹51,429.80 (7.41%)Rejected-Finance 60 HILL VIEW COLONY INDIRA NAGAR DEHRADUN 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | 2 | Rejected-Finance L2 | |
| 3 | 3₹8.0 L+₹1.1 L (15.7%)Rejected-Finance GROUND FLOOR LANE NO 5 SUBHASH NAGAR DEHRADUN U K 248 B O 286 PRAGATI NAGAR MEERUT | 248 | 3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹21,000
Closing Date
20 Jan 2022, 5:00 pmClosed
SUPERINTENDING ENGINEER, O and M CIRCLE,
SUPERINTENDING ENGINEER, O and M CIRCLE, PTCUL, Yamuna Colony, Dehradun
Annual Maintenance Contract of 220 kV Jhajhra- Khodri line, 132 KV Jhajhra-Kulhal and 132 KV Jhajhra- Dhalipur Lines under 220 KV(OandM) Sub Division, Jhajhra against Tender specification No.T-06/SE (OandM)/CR/D.Dun/2021-22
2021_PTCUX_40531_1
T-06/SE (OandM)/CR/D.Dun/2021-22
Open Tender
Miscellaneous Services
Lump-sum
365 days
dehradun
as per bid
3 documents required · 3 mandatory
₹590
Executive Engineer (O and M), Division, PTCUL Dehr
₹21,000
15 Sept 2023
20 Dec 2021
21 Jan 2022
21 Dec 2021
20 Jan 2022
21 Dec 2021
Amount
ROUTINE WORK Work of Patrolling and thermoscanning (Thermoscanning cameras will be provided by PTCUL) of 220kV Jhajhra - Khodri line (Tower to Tower) for one year, and submitting the Patrolling Report with thermoscanning report in prescribed Performa to related Sub Division on every patroling in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 35 meter wide gallery. Checking Points are given as below:- 1. Position of disc insulator. 2. Identification and number of missing tower parts. 3. Dislocation of dampers. 4. Condition of the conductor. 5. Condition of the earth wire. 6. Identification of weak joints, deterioration of Jumpers, hot points and clamps etc. (Observed by Thermoscanning Camera) 7. Position of tower earthing. 8. Position of tower foundation. 9. Position of Danger plate, number plate and name plate.
Lopping and Chopping of tree branches near & under the gallery of 220kV Jhajhra - Khodri Line from the 35 metre wide gallery of the line safely with rope for the safety of line conductors and to minimise future trippings.
Work of Patrolling and thermoscanning of 132kV Jhajhra - Kulhal Line (Tower to Tower) for one year, and submitting the Patrolling Report with thermoscanning report in prescribed Performa to related Sub Division on every patroling in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 27 meter wide gallery. Checking Points are given as below:- 1. Position of disc insulator. 2. Identification and number of missing tower parts. 3. Dislocation of dampers. 4. Condition of the conductor. 5. Condition of the earth wire. 6. Identification of weak joints, deterioration of Jumpers, hot points and clamps etc.(Observed by Thermoscanning Camera) 7. Position of tower earthing. 8. Position of tower foundation. 9. Position of Danger plate, number plate and name plate.
Lopping and Chopping of tree branches near & under the gallery of 132kV Jhajhra - Kulhal Line from the 27 metre wide gallery of the line safely with rope for the safety of line conductors and to minimise future trippings.
Work of Patrolling and thermoscanning of 132kV Jhajhra - Dhalipur Line (Tower to Tower) for one year, and submitting the Patrolling Report with thermoscanning report in prescribed Performa to related Sub Division on every patroling in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 27 meter wide gallery. Checking Points are given as below:- 1. Position of disc insulator. 2. Identification and number of missing tower parts. 3. Dislocation of dampers. 4. Condition of the conductor. 5. Condition of the earth wire. 6. Identification of weak joints, deterioration of Jumpers, hot points and clamps etc.(Observed by Thermoscanning Camera) 7. Position of tower earthing. 8. Position of tower foundation. 9. Position of Danger plate, number plate and name plate.
Lopping and Chopping of tree branches near & under the gallery of 132kV Jhajhra - Dhalipur Line from the 27 metre wide gallery of the line safely with rope for the safety of line conductors and to minimise future trippings. NOTE: The Contractor will provide 06 person team (01 number Supervisor, 02 number skilled lineman and 03 number semiskilled labour) along with 01 number Jeep at 220KV Substation, Jhajhra, Dehradun. All the required T&P and it's transporation will be provided by the contractor. Line T&P store of contractos must be located within 05 Km from 220 KV Substation Jhajhra, Dehradun For detailed BOQ see the Tender document (GST will be paid extra as applicable)
Shiv Shakti Construction
m/s star power solutions
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .