Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance DOON VALLEY UTTARAKHAND UT | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹50,344.67 (0.22%)Admitted-Finance | ₹2.3 Cr+₹50,344.67 (0.22%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical ANANDIPURAM KUSUMKHERA HALDWANI | NAINITAL | UTTARAKHAND | 244713 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical NEAR SBI TAKULA ROAD DISTT BAGESHWAR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ANAND SINGH MEHTA L1 | NATURES VALLEY CONSTRUCTION L2 |
|---|---|---|---|---|---|
| .01Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. | |||||
| 1.00 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge | 2,149.56 | Cum | 411 ₹8,83,469.16 Lowest | 413 ₹8,87,768.28 |
| 2.00 | Cement plum masonry with 40% plum & 60% 1:3:7 cu.m cement concrete including supply of all material,labour, T&P etc. required for proper completion of thework.(As per PWD Uttarakhand specifications) | 783 | Cum | 4,400 ₹34,45,200 Lowest | 4,414 ₹34,56,162 |
| 3.00 | Random Rubble Stone Masonry laid in 1:6 cement and cu.msand mortar, in breast walls, retaining walls, parapets,scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhandspecifications) | 3,622.42 | Cum | 4,000 ₹1,44,89,680 Lowest | 4,005 ₹1,45,07,792.1 |
| 4.00 | Random Rubble Masonary laid dry in breast cu.mwall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc, required for proper complition of work.(As per PWD) ( Uttarakhand specifications) | 1,341.27 | Cum | 2,280 ₹30,58,095.6 Lowest | 2,284.3 ₹30,63,863.06 |
| 5.00 | H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete. | 757.43 | Cum | 1,050 ₹7,95,301.5 Lowest | 1,064.4 ₹8,06,208.49 |
| 6.00 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). | 90 | No | 8,120 ₹7,30,800 Lowest | 8,123.3 ₹7,31,097 |
Tender Value
Refer Docs
EMD Value
₹5.4 L
Closing Date
10 Oct 2023, 1:00 pmClosed
Superintending Engineer
1st Circle P.W.D. Almora
Under the state Disaster mitigation fund the protection work of the motar road for the prevention of landslides occurring in km 15 to 18 of Kapkot Pindari glacier motor road of kapkot assembly onstituency of district Bageshwar.
2023_pwd_61311_1
2764(i)/Niveeda-01/2023-24 Dtd 25-07-2023
Open Tender
Civil Works - Roads
Item Rate
450 days
Kapkot(Bageshwar)
2 documents required · 2 mandatory
₹5,900
Yes
Executive Engineer C.D. PWD Kapkot
₹5.4 L
Yes
19 Dec 2023
25 Jul 2023
10 Oct 2023
25 Jul 2023
10 Oct 2023
14 Aug 2023
Amount
Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment.
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
Cement plum masonry with 40% plum & 60% 1:3:7 cu.m cement concrete including supply of all material,labour, T&P etc. required for proper completion of thework.(As per PWD Uttarakhand specifications)
Random Rubble Stone Masonry laid in 1:6 cement and cu.msand mortar, in breast walls, retaining walls, parapets,scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhandspecifications)
Random Rubble Masonary laid dry in breast cu.mwall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc, required for proper complition of work.(As per PWD) ( Uttarakhand specifications)
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete.
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions).
NATURES VALLEY CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .