Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC H NO 6 1ST FLOOR P B ROAD SUHAGPUR REBARARI GUWAHATI 08 | GUWAHATI | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical K60 ROSHANPURA NAJAFGARH NEW DELHI SOUTH WEST DELHI 110043 | WEST | DELHI | 110043 | - | - | Rejected-Technical L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | RS COOLING APPLIANCES L1 | Accurate Engineers L2 | SR UDYOG L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing & Commissioning of modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling, having all hermetically sealed inverter type Scroll Compressor(s), minimum two compressors for above 14 HP modules, microprocessor based Controller, top discharge type condensing unit(s), with R410A Refrigerant, vibration isolators, suitable foundation etc, with lifting / shifting of the system to required location at terrace/ platform (as per actual site condition) complete as required. The unit shall deliver the rated capacity at AHRI Conditions and work even at 50°C ambient temperature without tripping. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply. The units shall be of latest technology/latest generation of VRF system of the manufacturer and in successful operation for at least last three years. The unit shall be filled with first charge of the refrigerant and ready for use as required. The Unit should have free phase technology so that unit can work in case of phase reversal also without tripping of units. The COP at AHRI conditions shall not be less than 3.1 and IEER not less than 6.5. Individual Circuit and its Combination of single module units shall be as per approval of the engineer-in-charge. | 300 | HP | 20,200 ₹60.6 L | 16,050 ₹48.1 L | 20,500 ₹61.5 L |
| 2.00Supply Installation, Testing & Commissioning of following minimum capacity 4-way VRF Cassette Type Indoor ceiling mounted unit equipped with cordless remote, synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX copper coil, electronic expansion valve, outer cabinet, drain pan, drain pump, cassette grill, insulation, necessary supports, vibration isolation etc, suitable for operation on 230 V±10%, 50 Hz single phase AC supply, complete as required. The unit shall have automatic force shut down provision in case of fire. All indoor Units should have force shut option to connect with fire alarm adaptor, so that the unit automatically stops in case or fire. The cooling capacity of indoor unit will be at air inlet conditions of 27 degree C DBT and 19 degree C WBT. | ||||||
| 2.01 | Minimum Cooling Capacity: 4.0 TR | 52 | No | 50,000 ₹26 L | 44,900 ₹23.3 L | 49,000 ₹25.5 L |
| 2.02 | Minimum Cooling Capacity: 3.0 TR | 6 | No | 49,500 ₹3.0 L | 43,540 ₹2.6 L | 47,000 ₹2.8 L |
| 2.03 | Minimum Cooling Capacity: 2.0 TR | 7 | Nos | 43,000 ₹3.0 L | 39,516 ₹2.8 L | 27,500 ₹1.9 L |
| 3.00Supply, Installation, testing and commissioning including vaccumiazation and Nitrogen testing of following nominal sizes of soft/hard drawn copper refrigerant piping for VRV/VRF system, complete with fittings, with suitable adjustable ring type hanger supports, jointing/brazing including accessories, insulated with XPLE Class-O tubular insulation/with Class-O closed cell elastomeric Nitrile rubber tubular sleeves sections of specified thickness as given below for Suction and Liquid lines, all accessories as per specifications etc as required.. | ||||||
| 3.01 | 6.4 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm with 19 mm thick insulation | 20 | Mtr | 405 ₹8,100 | 332 ₹6,640 | 300 ₹6,000 |
| 3.02 | 9.5 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm with 19 mm thick insulation | 500 | Mtr | 515 ₹2.6 L | 398 ₹2.0 L | 405 ₹2.0 L |
| 3.03 | 12.7 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm with 19 mm thick insulation | 50 | Mtr | 625 ₹31,250 | 487 ₹24,350 | 695 ₹34,750 |
| 3.04 | 15.86 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm with 19 mm thick insulation | 450 | Mtr | 745 ₹3.4 L | 615 ₹2.8 L | 806 ₹3.6 L |
Updated dates
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
10 Nov 2025, 3:00 pmClosed
Execvutive Engineer
Mechanical Division, Agartala
Providing Installation Testing and Commissioning of IVRF AC Systems at 3 no medicine ward in first second and third floor of Old Super Specialty Block AGMC GBP Hospital Agartala along with Operation CAMC Operation for 3 years after installation and
2025_CEPWD_66124_1
ACE_PUnit_PWD_DNIT_46_202526
Open Tender
Electrical Works
1215 days
Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,000
₹3.0 L
4 May 2026
10 Oct 2025
10 Nov 2025
10 Oct 2025
10 Nov 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_67293.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
DNIT.pdf
Tender Documents • 3.07 MB
BOQ_67293.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid