Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹3.5 CrAccepted-AOC | ₹3.5 Cr | I | Accepted-AOC LOWEST RATE QUOTED BY THE FIRM |
| 2 | II₹3.9 CrRejected-Finance TNT NO 8 WARD 10 BC PLOT NO 12 13 GANDHIDAM KUCHCHH KACHCHH GUJARAT 370201 | KACHCHH | GUJARAT | 370201 | ₹3.9 Cr | II | Rejected-Finance RATE QUOTATED HIGH |
| 3 | III₹4.4 CrRejected-Finance | ₹4.4 Cr | III | Rejected-Finance RATE QUOTATED VERY HIGH |
| 4 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DIS QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹11 L
Closing Date
31 Dec 2019, 5:00 pmClosed
OFFICER COMMANDING WATER WING BHUJ
Office of the OC Water Wing HQ Water Wing Bhuj Border Security Force PO BSF Campus Mundra Road District Bhuj Gujarat PIN 370015
Dry Dock repair and maintenance of Floating BOP SP Shakti
2019_BSF_524589_1
WW/Bhuj/M/803/DD SPShakti/2019/9750-52 Dt 04/12/19
Open Tender
Marine Works
Works
180 days
Dry dock repair work of the vessel to be carried o
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹0
₹11 L
Yes
Office of the OC Water Wing
14 Oct 2020
6 Dec 2019
2 Jan 2020
6 Dec 2019
31 Dec 2019
20 Dec 2019
7 Dec 2019 - 18 Dec 2019
17 Dec 2019
Amount
STEEL PLATE REPLACEMENT :-Vessels bottom plating, both ship side plating including wind & water strakes, Aft ship side plating, front ship side plating, main deck plating port hole, Bridge and bridge deck plating, super structure vertical plating, all monkey deck plating, stiffeners, Radar Antenna base, GPS base, Navigational light antenna base, and search light base, sewage tanks, water tanks, Fuel tanks, Void tanks (All tanks to be internally examined), Bulk heads, hatches, exhausts, Winch covers, Roof covers of main engine,03 Nos Anchor base structure . Alarm based panel of wheel house, Main engine HRP gear box cover hinges, HRP Engine enclosure at top and doors packing, Roofing, base, plates of main deck petrol station, Electrical panel of both Anchor Winch, Roofing of the machinery room entrance, Corroded /rusted MMG protection guards, Additional MMG protection guards to be built on the monkey deck for laying position to the height of 1 to 1.5 feet. HRP covers, HRP protection vertical wall of the hull, angler iron stiffeners. Any other steel related renewal required at the time of dry dock repair in any fittings / fixtures of complete vessel will be covered. Any plates / iron structure Visibly identified as deteriorated needs replacement. Approximate 25 Ton steel plate is estimated to be replaced during the dry dock repair.The actual quantity of steel replaced/renewed during repair will be assessed by the BSF Board of Officers and BSF Supervisory staff for dry dock repair and the payment will be made for actual consumption as per quoted rate per tonnage. The additional /less payment of steel will be division of rates by 25 tonSteel plate should be approved by IRS /Classification society Thickness of plate Ship side & deck plate – 8 MM Accommodation wall – 6 MM
ULTRA SOUND GAUGING (USG):- All steel plates, decks and tanks to be de-rusted and ultrasonic thickness measurement to be carried out approx 2000 points to assess extent of corrosion. On the basis of USG report any plate if diminished more than 20% of original thickness must be renewed with the plate of original thickness and grade to the satisfaction of IRS surveyor.
MAIN ENGINE: - Main Engine require overhauling. The repair of all machineries and accessories of main engine like fuel pump, Lub oil pump, self-starter, alternator, Injectors, fresh water pump, oil cooler, Turbocharger, Vibration damper, Fan drive, All safety controls, Thermostat, etc to be carried out by manufacturer’s authorized /reputed service centre. The wear/deteriorated parts and assemblies of Main engine should be restored. Silencer pipes along with asbestos cloth, all hydraulic pipe & Oil seals, Radiator hose pipe all Gaskets, Hose pipes need replacement. Machinery running hours as on date are as under :- PORT side main Engine model No NTA 855M (BC-III) Kirlosker Cummins 325 HP (Sl No.25279565) covered run 3813 Hrs as on 30/11/2019. STBD side Main Engine model No NTA 855M (BC-III) Kirlosker Cummins 325 HP (Sl No 25279828) covered run 3810 Hrs 35 Minutes as on 30/11/2019
Cleaning of HSD service tank of both main engines by removing the complete engine unit from deck using crane/ winch arrangements and making the manhole & fitting of drain valves in HSD service tank.
HRP PROPULSION SYSTEM :- • Port side (currently ok) & Stbd side HRP system not working properly and recommended both side HRP be made operational • The upper & lower gear box servicing & defective upper and lower bearing and all mechanical oil seal of both HRP system to be replaced. • Gear oil & Hydraulic oil to be replaced as per OEM instructions. • Port and Stbd side HRP pressure Clutch & plate is to be repaired • All the electronic Control Units (ECU), relays, sensors, Control Board (PCB), panel board, wire fitted in wheel house and main engine thoroughly checked need repair • Control panel & indicator of engine room and bridge console need to be repair.• Clutch unit overhauling. Clutch plates O Rings and Seals required replace. Solenoid switches complete set of HRP units replacement/overhauling where ever applicable • Both hydraulic pump of HRP system thoroughly checked and defective parts to be replaced. • Vertical protection pipe need repair. Hydraulic pressure pipes need replacement. • solenoid switch need to be dismantled and serviced, defective parts to be replaced • Propeller clearance needs to be checked and adjusted. • HRP Thruster System BV model No 3212-DU (Deck mounted propulsion units type) • Port side – Sl No. 39610702-1 • Stbd side –Sl No. 39610702-2 • Alignment of joystick/ HRP system error should be rectified
DG SET :-Both Engine need to be overhauling The repair of all machineries and accessories like fuel pump, self-starter, alternator, Injectors, fresh water pump, oil cooler, Turbocharger, Vibration damper, All safety controls, Thermostat, etc to be carried out by manufacturer’s authorized/reputed service center. Sea water cooling pump need to be replaced with new pump. The wear/deteriorated parts and assemblies of DG set should be restored if any. All Seals, all Gaskets, Hose pipes need replacement. Sea water cooling pipe line of DG set complete replacement. DG set silencer pipes along with asbestos cloth need repair. Machinery running hours as on date are as under :- (i) Port Auxiliary Engine (DG Set) Model No. NTA 495 MG 85 kw 106 kva (Kirlosker Cummins) SL. No. 25282269 covered run – 29538 Hrs as on 30/11/2019. (ii) STBD Auxiliary engine (DG Set) Model No. NTA 495 MG 85 kw 106 kva (Kirlosker Cummins) SL. No. 25282268 covered run – 21752 Hrs as on 30/11/2019.
Complete 86 KVA alternator of both the DG Set is required to be dismantled and brushes, bearing, AVR, bushes or commutator need to be replaced. Proper re-insulating of coils is to be done. One spare AVR need to be supplied along with delivery of vessel after repair.
AC PLANT & AIR HANDLING UNIT :- The following 5 Star Split AC (Copper for marine environment) of make- (Carrier) with all accessories is required to install in various compartment of the vessel and proper out let water pipe line should be installed to drain the water from the inner unit. (i) Captain Cabin - 1 Tone cap-01 No (ii)VIP Cabin -01 Ton cap-01 No (iii)SOs Cabin – 1 Ton cap-02 Nos. (P & S=01 no each) (iv)Officers Dining Room & Sos dining room – 1 Ton cap—02 Nos. (v) Jawan Accommodation -1 ½ Ton cap-04 Nos. (vi) Jawan dining Hall –02 Ton cap-01 No (vii)Wheel House –1 ½Ton cap-02 Nos. viii) Recreation Room - 01 ton cap - 01 no
AHU Blower Unit be repaired and make functional. AHU specification Double duct system, Air intake and mixing section with fresh & return air manual operated dampers Filter section with removable and cleanable filters Cooling section with cooling coil for direct expansion of R-22 Fluid Air- 3760M 3/Hr Capacity- 32TR Medium- R-22 Evaporation temp-5 degree C Material- Cu/AI Fan section with V belt Fan capacity- 6760M3/Hr Static Pr- 1600 Pa Motor rating – 5.5 KW 4 Pole Voltage- 3 Ph, 415 V,50Z
AHU Unit Foundation base plate to be renewed
MAST REPAIR WORK :- Complete Mast, National and BSF Flag base, Main Mast bottom supporting members & brackets, Mast arm & flag hoisting pulley etc. is to be checked and wasted portion to be renewed.
All the Monkey island railings, Conduit pipes & Guard rails found damaged/ wasted due to the saline weather condition, same recommended to be renewed. Antenna VHF/HF.
The sintex tank of fresh & sea water need to be replaced high density tanks with threaded cover and guard railings and base of tanks need to be renewed. Existing two Nos 500 Ltr tanks to be replaced with fitting.
NAVIGATIONAL EQUIPMENT’S (RADAR, MAGNETIC COMPASS , ECHO SOUNDER , BAROMETER ,SEARCH LIGHT , PANEL BOARD INDICATOR :-, Echo sounder found defective, wrong display and recommended to be repaired. Make- Koden, Model No. CVS-8841/8842
GPS to be inspected and defective required to be replaced with latest model. Existing GPS Make- Koden Model No.KGP-913
RADAR system showing fault in display required to be repaired. Make- Koden, Model No. MDC-1510
Aneroid Barometer recommended for calibration Make- JOHNLILLTY & GILLIE,NORTH SHIELDS ENGLAND Srl No. 78605
Search light fitted on the Monkey deck not working properly and recommended for repair.
Loud speaker, PA system to be made operational. Make- Ahuja Model – DPA 370
Magnetic compass required calibration Make- Raytheon, Type- Reflecta 1,2 &3
VALVE AND PIPE LINES ( SEWAGE SEA WATER, FRESH WATER AND FUEL LINE) :- All the air pipes and air pipe heads on the main deck to be opened up for internal examination and wasted portions to be renewed. All the main sea water suction line and bilge system lines to be hydraulically pressure tested and recommended to replace the leaking pipes to the satisfaction of attending IRS surveyor. Diesel Oil Tank vent pipe, Clogged/Wasted drain pipe between decks, Sewage Tank Air Vent wasted portion, Sewage Tank Air Vent wasted portion needs to be renewed.
All the sea chest valves and overboard valves to be overhauled and to be hydraulically pressure tested. Valve size Nos 150 MM - 04 Nos 80 MM - 03 Nos 65 MM- 16 Nos 55 MM- 02 Nos 50 MM- 22 Nos 40 MM - 20 Nos 32 MM- 04 Nos 25 MM- 04 Nos 20 MM - 06 Nos
Under the all sea suction line strainers in engine room, FW Tank & Peak tank and Sewage tank etc in the hull plate to be fitted with double plates.
PUMP AND MOTOR ( BILGE FIRE PUMP, FRESH WATER PUMP DIESEL AND PATROL PUMP, DD FIRE PUMP, SEWAGE TRANSFER PUMP, ENGINE ROOM, EXHAUST BLOWER MOTOR , BATHROOM EXHAUST MOTOR , GALLEY EXHAUST) Engine machinery room Electric motor (02 Nos). Make- Bharat Bijlee LTD,55 KW, Capacity – 3000 Matric square per hrs
Engine machinery room Electric blower motor (02 Nos) Make- Bharat Bijlee LTD,55 KW, Capacity – 3000 Matric square per hrs
Electric Motor of Anchor winch (03 Nos.) Make- Hemant Engineering , Electric motor output- 5 HP, 1500 RPM 415 V,AC,3 Phase 50 HZ of IP 56 protection class B Insulation
Exhaust fan motors of galley, Jawan toilet and VIP room 03 Nos. Jawan toilets exhaust motor required to be adjusted according to the AC unit ventilation requirement. Specification of Motor - Galley - .37 KW,Jawan Toilet - .18 KW VIP ROOM- 76 watt
Davit motors 04 Nos Specification - 3 Phase squirrel cage motor Make- M/s Laxmi Hydraulics Pvt Ltd, Solapur Type- 3 Phase squirrel cage induction,TEPC Supply- 415 Volts, 3 Phase, 50HZ AC Rated capacity- 1 HP at 1500 RPM
Window wiper motor in the wheelhouse 04 Nos. Make- Spectoms Engg Pvt Ltd, 230 V , 50 HZ 1ph
The Following pumps and their motors are recommended for overhauling / servicing/replace Domestic Sea Water Pump and motor - 2 Nos. Specification- Domestic Sea Water Pump –Make Johnson, Model No. KGEC-12B-5, TYPE- Horizontal ,Self Priming Centrifugal Domestic Sea Water MOTOR -1.5 KW
Fuel transfer pump and motor - 02 Nos. Pump - Johnson Make ,Model SRT 508 , Motor- 1.1 KW
Bilge Pumps and motor – 02 Nos. PUMP- Make- Johnson, Model No. CH40 -160 d2, Type - Horizontal ,Self Priming Centrifugal Motor- 7.5 KW
Domestic Fresh Water Pumps and motor – 2 Nos. PUMP- Make- JOHNSON, Model No. KGEC 12B-5, Type- Horizontal ,Self Priming Centrifugal Motor- 1.5 KW
Sea water pump of DG set -02 Nos to be Replace
Aft peak tank bilge pump (hand operated), Semi Rotary hand pump of Basun store servicing
D D Fire Pump – 01 No (Replace) Make- Johnson, Model No . CH40-160B2 Type- Horizontal ,Self Priming Centrifugal Make- Gravies 7.5 HP AIR COOLING Diesel Engine ,
Sewage discharge pump and motor (1 No each) to be overhauled. And also recommended to be fitted one additional pump as stand by. PUMP- Make- JOHNSON, Model No. KGEC 12B-5, Type- Horizontal ,Self Priming Centrifugal, Motor- 1.5 KW
PETROL PUMP (1 No) Pump and Motor to be overhauled, Pump Model No. ST72959,Make- Larson & turbo ltd Motor 3.7 KW
Fuel dispenser unit of petrol pump to be serviced and calibrated Make- Larson & turbo ltd, Model No. ST72959
One Diesel Pump of same capacity of existing dispenser unit of latest version required to be installed to transfer the HSD to other vessels.
Suction pipe from petrol tank to petrol pump discharge unit to be replaced, Pipe size- 2.5 Inch ,Length -15 Feet Approx
AWNING FITTING: -All the pole/structure of the Awning fitting to be replaced and green Fibre sheet to be fitted.
BOLLARD AND CLEATS:-The base and pole of the 08 Pairs of Mild Steel Bollard fitted the various places on main deck be repair.
DAVITS AND BOAT CRADLES:-04 Nos. davit need to be repaired.
ANCHOR WINCH AND CHAIN / CABLE :- Overhauling winch. Chain stopper arrangements like wire, turnbuckles and swivel assy. and Worn out brake pads of Anchor Windlass clutch and magnetic brakes to be repair. Gear case to be cleaned and oil to be renewed. Rope- dia – 16 MM Rope drum speed – 9 Mtrs/min @ 1000 Kgs for 30 Min Electric motor output- 5 HP Electric motor speed – 1500 RPM Current – A/C,Voltage supply- 415 V System of control- Push button operated Weight of winch with motor- 875 Kgs approx. Gear Box Reduction type ,M S fabricated Oil splash lubricated ,mounted on the base frame
Additional 02 Nos Clutch plate, 02 Nos Davit wire, 02 Nos limit switch to be provided as on board spares. Davit wire 16 MM, B/S – 16Ton ,Length – 60 Mtr One side fold back eye with thimble and pressed metal sleeve at 03 places ,other side plain
PAINTING WORK : - Complete painting of whole vessel under water, all internal compartment, external decks, bulk heads, all FO tanks, FW tanks, sewage tank, void tank, and engine room as per painting scheme to be done after ready the surface by sand blasting. Draught Marks also be done.
Batteries: - 01 No emergency motive battery 24 volt required to be replaced with 02 Nos. 12 volt 21 plates in series compatible with all equipments of F/BOP.
Complete 24 volt panels and charging system & transformer need repair.
Suitably rated Inverter of maximum output 2 KW with complete accessories and wiring to 02 Nos. officer cabin (each 1 fan, 1 light 1 plug to TV), Jawan recreation room (1light & TV), Galley light, Mobile charging points 06 Nos. Jawan accommodation & toilet 06 light 2 fan, SO s cabin 1 light & 1 fan each, weather deck 1 light and main deck 2 light, wheel house (fan, 1 light 1 plug to TV) 04 lights on 04 sides of main deck.
BATH ROOM: - Toilet of VIP room, Captain cabin, both SOs cabin and Jawan toilets side wall recommended to be fitted with FRP water proof paneling.
All MS pipe fittings of all Toilets and Bathrooms to be replaced with hose Pipe.
Flush lever of all existing toilets to be changed with push button system type.
01 urinal point to be provided in Jawan toilet
All MS partitions in jawan toilet to be replaced with Fiber sheets
03 Nos toilet closet to be changed from western seating to Indian seating
01 additional drain hole diagonally opposite to already existing drain hole in jawan toilet to be provided
All the tiles (05 Both rooms), closets (09 Nos), Wash basin (10 Nos.) of bathrooms of VIP room, Captain cabin, officers dining room, both SOs cabin, Jawan dining room and Jawan Toilet to be renewed.
All water Taps (10 Nos.) need replacement.
LIFE SAVING APPLIANCES: - All lifesaving appliances to be serviced/ replaced as applicable
Water sprinkler system for magazine / kote to be tried out with air/water and serviced.
Expired bridge distress signals to be renewed.
FIRE FIGHTING APPLIANCES: -All fire fighting pipes need to be renewed and fire hydrants to be serviced and all on-board fire extinguishers recommended for renewal. Hydrant- 5 Nos ,fire extinguisher- 12 Nos V/types ,Pipe- 100 feet
All hose pipe of fire fighting system to be changed. Qty- 06 nos, Pipe Size- 2.5 inches
Fire box on main deck (02 Nos.) to be renewed and clamps need replacement.
MISCELLANEOUS : Wheel house partition be made for captain/Helms man by excluding the stairs for fitment of AC.
10 Nos. port holes need to be Renewed
Wasted Air Pipes (Goose Neck type) and their closing flaps, Booby Hatch covers frozen cleats/clips and lips for retaining packing to be renewed.
All Rubber packing/Gasket of Forward and aft booby hatch covers (total 4 Nos.) all windows/doors, all man holes, port holes and all air tight tank to be renewed to ensure water tightness. Length – 200 feet (Approx.) , Size- ½” x 1”, ½” x 1.5 “
Wire mesh of various ventilations/exhaust on main deck to be renewed. Approx. 9 feet x 9 feet.
Embarkation ladder (4 Nos.) renewed with detachable aluminium ladder
All the smoke/heat detectors to be tested/ renewed. Make- Motwane Pvt Ltd, Qty- 8 Nos
Damaged railing of all ship side main deck and weather deck to be renewed.
All the Electrical socket/electrical lines and electric switch board, hot plate wiring, hotplate element and coverings recommended for servicing.
Fridge 02 Nos. required to be replaced. Minimum 100 Ltr Single Door – 1 No Minimum 200 Ltr Double Door 01 No
All the door locks are required to be renewal. (12 Nos)
AC insulations in the cabin need to be renewed
All light fixtures (24 Nos.) on the outer deck need to be renewed. LED lights need to be fitted with existing external fitting with suitable latest holder as per bulb is permitted.
Accommodation Port Hole Frame rusted, same to be chipped and painted. Defective Frame required to be replaced
01 No RO purification systems capacity of 250 ltr/1hr (of 2000 to 4000 TDS) water supply heavy duty is required to be installed with storage tank 200 Ltr (heat proof) and connected with additional 500 Ltr (heat proof) overhead tank and 1 HP lifting pump to lift water from any one of the water tank of F/BOP.
Hot water Geysers required to be replace (25 Ltr Capacity)
02 Nos. Deep Freezer required to be removed and remaining 02 Nos. need to be replaced. Making of 03 shelves at 02 sides of the deep freezer room to the length of 12 ft width 15 inch to keep stores.
Firms to carry out air pressure testing of tanks where structure renewal has been undertaken.
Wheel House door and automatic hydraulic door closer to be renewed.
Pest control treatment to be done entire vessel &accommodation before sailing
All the rubber packing’s are recommended for renewal to ensure weather tightness.
All sea water pipe line in toilets needs to be replaced with High Density PVC pipes. ( Where ever possible)
MMG protection plate height to be reduced
So’s dining room to be re furnished(sufficient bunk bed, table etc to be provided) to living quarters as to accommodate 06 personnel
Hot plate and oven switch to be made separate
All drawers in galley to be replaced with open racks
Additional racks to be fitted in galley
One sink washing utensils to be provided in Jawan dining room by replacing the 02 wash basin.
CABIN. Floor mat to be replaced by PVC Lelonium sheet.
Sidewall panelling of all cabins is required to be repaired, damaged portion to be renewed.
DOCKING AND PILOTING / INSPECTION CHARGES :- Inspection charges including IRS fees
Cost of Docking and keeping vessels on dock for completion of repair work & un-Docking
Cost of insurance(For complete cost of vessel), piloting / towing charges from Koteshwar ( Gujarat ) to builders yard and back including cost of fuel
TVRO (TELEVISION RECEIPT ONLY) Providing suitable TV Reception system equipped with GPS based antenna reception with connected accessories capable of providing feed to 06 Smart LED TV sets with individual set Top boxes and complete accessories. Reception system must be able to receive all channels irrespective of the direction and movement of floating BOP. Firm will provide Smart LED TVs of make Crown/Sony 42” -02 No. each and 32” – 04 Nos with 01 year channel subscription . Technical specification of TVRO system as per Appendix-11
ANTICIPATED SCOPE OF WORK FOR UNDER WATER HULL PORTION 100% under water hull to be visually surveyed. Structure graded critical to be surveyed with the help of ultrasonic equipment. Particular attention to be paid to the hull plating in the vicinity of propellers, shaft. Boot top areas (including wind and water areas), inlets/outlets and areas in the vicinity of keel which rests closely on dock blocks for sign of corrosion and damage i.e breakdown of paint, dent, pinholes, cracks, etc. Indentation on the shell plating be closely examined taking into consideration the effect on the structural strength and eddy raising current. The permissible limits of distortions /indentation on the plates are to be guided structural Drawings.
Firm to inspect sacrificial anodes fitted to underwater hull, rudders propeller, inlets and outlets, sea tubes bilges and void spaces. Renewed those consumed 50% or more and clean remaining sacrificial anodes. Qty- 30 nos,Size 2 feet x 3 inch
Mud box, strainer and fixtures (under water portion) need to be serviced.
SSR Marine Services Pvt. Ltd.
PATEL ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .