Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.2 LAccepted-AOC DEHRADUN | ₹86.2 L Quoted ₹91.5 L | L1 | Accepted-AOC ADMITTED |
| 2 | L2₹1.1 Cr+₹19.4 L (21.2%)Rejected-Finance VILLAGE BAHRUWALA POST GOVERDHANPUR TEHSIL LAKSAR ROORKEE | HARIDWAR | UTTARAKHAND | 247656 | ₹1.1 Cr+₹19.4 L (21.2%) | L2 | Rejected-Finance NOT ADMITTED |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
24 May 2024, 2:00 pmClosed
SE
EDC Tehri
Replacement of ACSR Conductor by LT XLPE AB Cable at Vill. Naitwar, Sankri, Jiwanu etc. in Mori Block under EDD Barkot
2024_UPCL4_71379_2
88/EDCT/23-24
Open Tender
Miscellaneous Services
Item Wise
90 days
Mori
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE TEST
₹1.8 L
Yes
30 Sept 2024
15 May 2024
25 May 2024
15 May 2024
24 May 2024
15 May 2024
Electrical Items :
PG Clamp 25 to 25 mm line to line
Nut & Bolts
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-23 WITH NUT & BOLT
SUSPENSION CLAMP WITH EYE HOOK
LT CLAMPS FOR DISTRIBUTION BOX
Dead End Clamp with I Hook
Piercing Connector 16-16sqmm
Piercing Connector 70 Sq.mm-70Sq.mm
Piercing Connector 70 Sq.mm-35Sq.mm
Piercing Connector 35 Sq.mm-35Sq.mm
INSULATED PIERCING CONNECTOR 50-50 SQ.MM
INSULATED PIERCING CONNECTOR 16-35 SQ.MM
PG CLAMP FOR NUTRAL 50-50 SQ.MM
PG CLAMP FOR NUTRAL 50-35 SQ.MM
PG CLAMP FOR NUTRAL 35-35 SQ.MM
PG CLAMP FOR NUTRAL 25-35 SQ.MM
INSULATED PIERCING CONNECTOR 50-35 SQ.MM
LT XLPE Cable 1x35 sqmm
LT AB Cable 3x70+1x50 sqmm
LT AB Cable 3x35+1x25 sqmm
LT XLPE AB CABLE 1CX16+25 SQ.MM.
LT AB CABLE 3CX50+1 X35 SQ.MM
LT DISTRIBUTION BOX 1 PHASE
Aluminium lug 25 sq. mm
Services(labour)
ERECTION OF EARTHING ROD
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-21 POLE
ERECTION OF SINGLE SP-23 POLE
GROUTING OF POLE
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 2 P 3 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
LOPPING & CHOPPING OF TREE BRANCHES
CARTAGE SP-21/23 POLE, 150-200KM
CARTAGE OF PETTY MATERIAL,150-200KM
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
DISCONNECTION & RECONNECTION OF CONsumer
LAYING OF LT AB CABLE 3X70+1X50 SQMM
LAYING OF LT AB CABLE 3X35+1X25 SQMM
Straightening of Tilted STP Poles
Laying of AB Cable 1x16+25 mm
BACK CARTAGE OF PETTY MATERIAL,150-200KM
Installation of LT Distribution Box
Laying and fixing of 1x35sqmm XLPE Cable
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
LAYING OF LT AB CABLE 3CX50+1X35
m/s ss infra power
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .