Loading…
Loading…
Tender Value
₹33.0 L
EMD Value
₹33,000
Closing Date
1 Jun 2026, 6:00 pmClosed
Executive Engineer, R&B Division, Bhuj
M&R to Smritivan Museum at Bhuj (Painting work for central spine Tensile PTFE Roofing structural steel, Light and CCTV Pole Repainting, Shed on 625KVA Sub station, PCC Work and Misc Civil Maintainace Work)
306320
17 For 2026-27
Open
Repair and Maintenance
Works
Kutch
10 documents required · 10 mandatory
₹1,500
Executive Engineer, R and B Division, Bhuj
₹33,000
18 May 2026
18 May 2026
18 May 2026
1 Jun 2026
18 May 2026
Name of work :-
M&R to Smritivan Museum at Bhuj (Painting work for central spine
Tensile PTFE Roofing structural steel, Light and CCTV Pole
Repainting, Shed on 625KVA Sub station, PCC Work and Misc Civil
Maintainace Work)
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
1 7.00 Providing and fixing stainless steel 14897.50 Rupees Rmt.
AISI 316 Grade Stainless Steel Fourteen
Knock Down railing system with 12 Thousand
mm toughened glass of approved Eight Hundred
make with satin finish and loading Ninety Seven
tested as per International load And Paise Fifty
Testing Criteria. (Without any Only
welding, Fabrication, and Buffing
on site) made of Hollow tubes,
channels, plates, special glass
holding fixtures, etc., including
welding, grinding, buffing, polishing
and making curvature (wherever
required) and fitting the same with
necessary stainless steel nuts and
bolts complete, on the top of the
floor or the side of waist slab with
the suitable arrangement as per
drawing and as directed by an
engineer in charge. The balustrade
would be fixed onto floor/waist slab
with casted base plate of S.S
with High Strength 2 NOS Anchor
fasteners and whenever required,
joints to be filled with bushings for
extra strength. Shop drawing
provided by vendor/contractor for
approval by client/architect.
Approved Make: Ozone, Kich, Aegis
2 8685.00 Applying priming coat over new 36.42 Rupees Thirty Sqm.
steel and other metel surface after Six And Paise
and including preparing the surface Forty Two Only
by throughly cleaning, oil,grease,
dirt and other foreign matter and
scoured with brushes fine steel
wood, scrapers and sand paper
with ready mixed priming paint
brushing red lead.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
3 8685.00 Painting Two coats (excluding 115.05 Rupees One Sqm.
priming coat) on previously painted Hundred
steel and other metal surface with Fifteen And
enamel paint, brushing to give an Paise Five Only
even shade including cleaning the
surface of all dirt, dust and other
foreign matter.
4 99.00 Excavation for foundation upto 1.5 122.93 Rupees One Cum.
m depth including sorting out and Hundred
stacking of useful materials and Twenty Two
disposing off the excavated stuff And Paise
upto 50 Meter lead.(A)Loose or soft Ninety Three
5 79.00 Providing and laying 200mm thick 1307.95 Rupees One Cum.
Granular Sub Base (Grade - I ) By Thousand
providing coarse graded materials Three Hundred
in uniform layers with motor grader Seven And
on prepared surface, mixing by mix Paise Ninety
in place method with rotavator at Five Only
OMC, and compacting with
vibratory roller to achive the
desired density, complete as per
6 100.00 Providing and laying cement 4290.66 Rupees Four Cum.
concrete 1:1.5:3 (1- Cement : 1.5- Thousand Two
Coarse/Fine sand : 3- graded Hundred
stone aggregates 20 mm nominal Ninety And
size) and curing complete including Paise Sixty Six
cost of formwork in (A) Foundation Only
7 106.00 Steel work, riveted in built up 6747.08 Rupees Six Qtl.
sections framed work including Thousand
cutting, hoisting, fixing in position Seven Hundred
and applying a priming coat of red Forty Seven
lead paint. (D) In trussses and And Paise
trussed purlins, upto 25 M. span Eight Only
and 15 M ovarall height
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
8 317.00 Providing and fixing of Ridge 867.38 Rupees Eight Sqm.
flashing for roof panel shall be Hundred Sixty
made out of 0.5 mm thick pre Seven And
coated GI sheet . The Precoated Paise Thirty
sheet shall be of minimum 240 Eight Only
mpa steel grade confirming to IS
14246:1995 and shall have zinc
coating of minimum 120 gsm as
per IS:277:1992 , 5-7 microns
epoxy primer on both side of the
sheet andpolyester top coat 15-18
micron. The PPGI Sheet shall have
plastic protective guard film of
minimum 25 microns to avoid
scratches during transportation.
The ridge shall be fixed to the steel
members by pop rivet or self
drilling/self stitching fastners @
maximum 450 mm c/c along
length of capping/flashing etc
9 6.00 Providing and fixing wet cladding in 1161.50 Rupees One Sqm.
(wall lining) any shape at all levels Thousand One
with 18 mm thick gang saw cut Hundred Sixty
stone with (machine cut edges) of One And Paise
uniform colour and size,upto Fifty Only
0.75mx0.60m, backing filled with
a grout of average 12 mm thick
cement mortar 1:3 (1 cement :
coarse sand) mixed with adhesive
in proportion as per manufacture's
specification, including pointing in
white cement mortar 1:2 (1 white
cement : 2 stone dust) with an
admixture of pigment matching the
stone shade at all levels including
cutting, making recesses in stone
slab, drilling holes, rubbing,
polishing, curing, and scaffolding
etc complete in the required
pattern as per drawing and as
direct cted by engineer in charge.
(A) Khavda stone
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
10 43.00 Providing and fixing dry cladding in 3030.00 Rupees Three Sqm.
any shape (wall lining) at all levels Thousand
with 25 mm thick gang saw cut Thirty Only
stone with (machine cut edges) of
uniform colour and size upto
2mx0.6m, fixed on any surface
using HC-SF-R SS or equivalent
clamp of 304 hybrid grade with
stainless steel. Clamp body shall be
of 304 grade wherein pin,
externally threaded rod, internally
threaded tube shall be of
grade. The clamp body shall be of
minimum 5mm thickness and shall
be able to carry a dead load of
Kgs at minimum offset.The clamp
shall be available with variable
offset lengths from 50-65mm. For
Clamp fixing, anchors HRD HR2 or
equivalent of 10 mm dia. (100 mm
long) to be used. The anchor
should be made of polyamide sleeve
PA6 grade and stainless steel A2
Grade. Sealing of stone joints with
approved weather sealant including
cutting, making recesses in stone
slab, drilling holes,rubbing,
polishing,curing, and scaffolding
etc complete in the required
11 611.00 Providing Birdnet on courtyard 338.35 Rupees Three Sqm.
open area as per directed by Hundred Thirty
Engineer in charge. Eight And
Rupees Thirty Two Lakh(s) Ninety Eight Thousand Five Hundred Four And Paise Thirty Six Only
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
R & B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
BUILDING SPECIFICATIONS BOOK.pdf
GR.pdf
SBD Book.pdf
Specification Index.pdf
Specifications.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .