Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 2 | Admitted-Finance MARINE CORPORATION OF INDIA PROP ANAND SHIP CARE INSTITUTE PVT LTD 25 9 14 MARINE TOWERS RAJAVARI VEEDHI VISAKHAPATNAM | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
27 Jan 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Overhauling of Main Engine on MV Vishva Vijetha
2022_HSL_88640_1
20 / 22002 / Main Engine / 184 / 2021-22
Open Tender
Miscellaneous Services
Turn-key
20 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹525
Yes
HSL
₹40,000
Yes
3 Feb 2022
13 Jan 2022
27 Jan 2022
13 Jan 2022
27 Jan 2022
13 Jan 2022
120 days
Amount
ITEM : MAIN ENGINE OVERHAULING WORKS TYPE / CAPACITY / DETAILS : QMD-WARTSILA RT-6FLEX50-B SPECIFICATION : POWER=9480KW*124RPM. Note: The entire job should be carried out on turnkey basis including stagging, arranging tools, tackles,machining, build up etc are covered in vendor scope.
DETAILS OF THE SCOPE IS AS FOLLOWS: ENTIRE JOB FOR OVERHAULING OF MAIN ENGINES IS TURNKEY TYPE. Spares (excluding ship supplied) ,transporting,welding,machinings, consumables ,tools,instruments etc are to be arranged by the vendor. SPARES REQUIRED FOR THE GOVERNOR OVERHAULING ARE TO BE PROVIDED BY THE VENDOR. Note: Bidders are advised to read the annexures before quoting and consider the scope to executed in the attached Annexure A details also.
MAIN ENGINE UNIT DECARBONISATION TO BE CARRIED OUT AS PER FOLLOWING JOB SCOPE. ALL WORK TO BE CARRIED OUT STRICTLY AS PER THE MAKER’S MAINTENANCE INSTRUCTIONS TAKING ALL SAFETY PRECAUTIONS. ALL OEM SPARES AND SPECIAL TOOLS (SHIP’S SUPPLY). TO COORDINATE WITH SURVEYORS AS & WHEN REQUIRED. ALL NECESSARY PARTS TO BE SHOWN TO SURVEYORS FOR THEIR APPROVAL.ARRANGING MAKER SERVICE ENGINEER IN HSL SCOPE
ISOLATE ALL SIX UNITS; DRAIN COOLING WATER; FUEL OIL ETC. REMOVE ALL NECESSARY CYLINDER HEAD CONNECTIONS; REMOVE CYLINDER HEADS WITH EXHAUST VALVES AND TRANSPORT SAME TO WORKSHOP.
DISCONNECT AND REMOVE ALL CYLINDER HEAD MOUNTINGS. DISMANTLE CYLINDER HEADS AND SEPARATE THEM FROM COOLING JACKETS. THROUGHLY CLEAN CYLINDER HEADS AND COOLING JACKET SURFACES. RENEW ALL “O”RINGS AND ASSEMBLE CYLINDER HEADS AND COOLING JACKETS.CYLINDER HEAD COOLING SURFACES TO BE PRESSURE TESTED TO 06 KG/CM2 AND SHOWN TO 2EO & CEO.ALL CYLINDER HEAD MOUNTINGS POCKETS AND SEATS TO BE THOROUGHLY CLEANED AND SEATS TO BE LAPPED.FUEL VALVE AREA TO BE CHECKED FOR CORROSION ATTACK AND IF SAME EXCEEDS DEPTH OF 8 MM THEN RECONDITIOING TO BE DONE AS PER MAKER,S INSTRUCTIONS.CYLINDER AIR STARTING V/VS,RELIEF V/VS,FUEL V/VS AND INDICATOR VALVES TO BE OVERHAULED AND TESTED TO PROVE SATISFACTORY OPERATION AND SHOWN TO 2EO/CEO.CYLINDER HEAD RELIEF V/VS TO BE PRESSURE TESTED TO CORRECT OPENING PRESSURE AND SHOWN TO 2EO/CEO.AFTER THE APPROVAL OF SURVEYORS & SUPDT ALL THE MOUNTINGS TO BE ASSEMEBLED, FITTED BACK IN PLACE.ALL MATERIALS ,TOOLS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY
DISMANTLE THE EXHAUST V/VS COMPLETELY. THOROUGHLY CLEAN ALL PARTS & SHOWN TO SURVEYORS &SUPTD. RENEW ALL WORN / DEFECTIVE PARTS AS REQUIRED & ALL SEAL RINGS FROM SHIP’S SPARES. CHECK THE VALVE & SEATS & IF REQUIRED GROUND THE VALVES & SEATS AS PER MAKER’S INSTRUCTIONS. THOROUGHLY CLEAN EXHAUST V/VS COOLING WATER SURFACES. ASSEMBLE THE EXHAUST VALVES AS THE ORIGINAL AND FIT THE EXHAUST VALVES IN PLACE ON CYLINDER HEADS. ALL CYLINDER HEAD ASSSEMBLIES TO BE TRANSPORTED BACK ONBOARD..ALL MATERIALS ,TOOLS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
ALL LINER SURFACES & SCAVENGE PORTS TO BE THROUGHLY CLEANED. L.O.QUILL PASSAGES TO BE THROUGHLY BLOWN THROUGH WITH COMPRESSED AIR & CLEARED. LINERS TO BE CALIBRATED AND READINGS TO BE RECORDED.IN CASE OF ANY READINGS ABOVE WEAR LIMIT LINER TO BE RENEWED(CONSIDER 02 NOS LINER RENEWAL). CARRY OUT DYE CHECK ON ALL CYLINDER LINERS IN WAY OF TOP AND BOTTOM L.O.GROOVES FOR DETECTING CRACKS IF ANY SHOWN TO SURVEYOR AND SUPDT.ALL L.O. QUILLS TO BE OVERHAULED & FUNCTION TESTED IN PRESENCE OF 2EO/CEO.LINER PORTS EDGES TO BE SMOOTHENED IF REQUIRED.NEW LINERS TO BE BOXED BACK IN PLACES AS THE ORIGINAL USING NEW SEAL RINGS(SHIP SUPPLY).L.O. QUILLS TO BE FITTED BACK IN PLACE AS THE ORIGINAL.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
PISTON HOLDING NUTS TO BE OPENED. LINER TOP RIDGES TO CLEAN AND GRIND. PISTON TO BE WITHDRAWN ALONG WITH STUFFING BOXES AND SHIFTED/TRANSPORTED TO SHOP.PISTON RING & STUFFING BOX TO BE REMOVED STUFFING BOX TO BE DISMANTLED CLEANED INSPECTED AND ASSEMBLED WITH NEW SPARE SHIP SUPPLY CHECK THE PISTON CROWN WEAR DOWN BY WEARDOWN GAUGE. PISTON RING GROOVES TO BE THOROUGHLY CLEANED. GROOVES & PISTON RINGS TO BE CALIBRATED & READINGS TO BE RECORDED AND SHOWN TO CEO/SUPDT.IF PISTON RING GROOVE FOUND ENLARGED SAME TO BE RECONDITIONED.ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD & AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD/CEO. PISTON ROD TO BE GAUGED. PISTONS TO BE ASSEMBLED WITH NEW PISTON RINGS. PISTON ROD STUFFING BOX ALL PARTS TO BE THOROUGHLY CLEANED. STUFFING BOX CALIBRATIONS TO CHECK AND RECORD THE READINGS. ALL WORNOUT / DAMAGED PARTS TO BE RENEWED FROM SHIP’S SPARES. STUFFING BOXES TO BE ASSEMBLED ON PISTON RODS USING NEW SEAL RINGS SCRAPER RINGS & SPRINGS. PISTON RODS ALONG WITH STUFFING BOXES TO BE TRANSPORTED BACK ONBOARD.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
AUTOMATIC STARTING AIR VALVE TO OVERHAUL.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
ALL UNITS UNDER PISTON AND SCAVENGE SPACES TO BE THOROUGHLY CLEANED .EXH.MANFIFOLD INCPECTION DOORS TO BE OPENED UP FOR CLEANING.ENTIRE EXHAUST MANIFOLD TO BE THOROUGHLY DECARBONISED AND CLEANED USING WIRE BRUSHES AND SHOWN TO CEO/2EO.TURBOCHARGER INLET GRIDS TO BE THOROUGHLY CLEANED AND INSPECTED FOR WEAR DOWN/DAMGE.IF REQUIRED SAME TO BE REPAIR OR RENEW.ALL UNDER PISTON AND SCAVENGE SAPCES TO BE INSPECTED.EXHAUST MANIFOLD INSPECTION DOORS&UNDER PISTON &SCAVENGE SPACE DOORS TO BE BOXED BACK AS THE ORIGINAL USING NEW JOINTS(CONTRACTOR SUPPLY).CONSIDER RENEWAL OF 24 NOS BOLST/STUDS WITH NUT OF ASSORTED SIZES.C/CASE TO BE THOROUGHLY CLEANED & INSPECTED.C/CASE DOORS TO BE BOXED BACK WITH NEW JOINTS(CONTRACTOR SUPPLY)AS THE ORIGINAL.SCAVENGE RELIEF DEVICES,CRANK CASE DOORS AND RELIEF DEVICES TO OVERHAUL AND TO BE SHOWN TO THE CLASS SURVEYOR.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
ME TO BE TURNED ON TURNING GEAR WITH L.O. PUMP .SATISFACTORY MAIN ENGINE RUNNING TRIAL(BASIN TRIALS) AND MAIN ENGINE SEA TRIALS TO BE GIVEN TO THE SATISFICATION OF SHIP'S STAFF.
GRINDING OF EXHAUST VALVE SEAT AND VALVE BY GRINDING MACHINE.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
MACHINING OF LANDING FACES OF AIR STARTING VALVES, EXHAUST VALVES, FUEL VALVES ON CYLINDER HEADS.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
CYLINDER COVERS COMBUSTION SPACES TO CHECK FOR CRACKS WITH D.P. TEST .ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
ASH BLASTING OF 06 NOS EXHAUST VALVE BODIES.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
PISTON CROWNS TO CHECK FOR CRACKS WITH D.P.TEST INTERNALLY AND EXTERNALLY.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
CYLINER COVER EROSION AT FUEL VALVE HOLES TO REPAIR BY MAKER'S RECOMMENDED PROCEDURE.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
LINER WITHDRAWAL,OVERHAUL & REFITTING OF NEW OR SAME LINER PER UNIT.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
ALL HYDRAULIC VALVE CONTROL UNIT FOR EXH VALVES TO BE DISMANTLED UNDER WARTSILA SERVICE ENGINEER AND BOX BACK AS PER MAKER'S PROCEDURE AND ALL UNITS TO BE PUT UP FOR SHOWN TO SURVEYOR.UP TO SURVEYOR SATISFACTION UNDER CSM SURVEY.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
DRIVING GEAR TO BE INSPECTED THOROUGHLY WITH MAKER'S SERVICE ENGINEER AND CHECK ,DRIVING GEAR TO BE CHECKED & ADJUSTED FOR VIBRATION DAMPERS UNDER THE SUPER VISION OF SERVICE ENGINEER AND PUT UP FOR SHOWN TO SURVEYOR.UP TO SURVEYOR SATISFACTION UNDER CSM SURVEY.
TO RECONDITION ME CYL COVER/EXH. VALVE CAGE/EXH.VALVE SPINDLE-02 NOS.EACH WITH CLASS APPROVED CERTIFICATION
RECONDITIONING OF MAIN ENGINE PISTON CROWN
FOLLOWING JOBS TO CARRY OUT UNDER THE SUPERVISION OF WARTSILA SERVICE ENGINEER. .ALL MATERIALS ,TOOLS ,TORQUE SPANER,HYDRAULIC JACKS AND PUMPS,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
MAIN ENGINE FUEL INJECTION PUMPS ISOLATE EMERGENCY STOP BUTTON AS LONG AS ANY WORK IS CARRIED ON FUEL PUMP BLOCKS. FOR COMPLETE CHECKING AND ADJUSTEMENTS
ALL INLET AND OUTLET CONNECTIONS TO BE REMOVED AND FUEL P/P BLOCKS TO BE TAKEN OUT FROM PLACE; TRANSPORTED TO WORKSHOP. PUMPS TO BE COMPLETELY DISMANTLED FOR INSPECTION;PARTS TO BE CLEANED AND MADE READY FOR SURVEY.
FUEL PRESSURE CONTROL VALVES TO DISMANTLE,CLEAN & OVERHAUL.DEFECTIVE PARTS TO REPLACE FROM SHIP'S SPARES.CONSIDER MINIMUM SKIMMING OF VALE SEATS
RELIEF VALVES TO OVERHUAL & SET AT 1250 BARS(+100 OR-50) WITH HELP OF TEST BECNH,INCREASE THE PRESSURE TO 1150 BAR AND WAIT FOR 1 MINUTE,NO LEAKAGE IS ALLOWED.AFTER FINAL ASSEMBLY CHECK FOR EASY MOVEMENT OF REGUALTING RACK,CHECK AXIAL CLEARANCE ACCORDING TO CLEARANCE TABLE.
FUEL INJECTION PUMPS TO DISMANLE AND SHOWN TO CLASS SURVEYORS. AFTER COMPLETION OF SURVEY, PUMP TO BOX BACK AS ORIGINAL.INDIVIDUAL PUMP TIMING TO CHECK & ADJUST AS NECESSARY & TO BE RECORDED.
ALL UNITS FUEL OIL SAFETY CUT OUT DEVICES TO OVERHAUL,AIR CYLINDERS TO DISMANTLE & ALL PARTS TO CLEAN.COMPRESSION SPRINGS,"O" RINGS & PISTON ROD SEALING RINGS TO CHECK & RENEW AS REQUIRED.
PRIMING,BASIN & SATISFACTORY SEA TRIAL TO BE GIVEN.WHEN PUMP IS PUT ON USE CHECK FOR ANY LEAKAGE AND ABNORMAL TEMPERATURE RISE.
ALL FUEL LINKAGES TO CHECK FOR PLAY & WORN BUSHES TO RENEW(CONTRACTOR TO FABRICATE AND SUPPLY)
INJECTION CONTROL UNITS(INCLUDING RAIL VALVES) TO BE OVERHAULED UNDER WARTSILA SERVICE ENGINEER
MAIN ENGINE MAIN BEARINGS &THRUST BEARING
MAIN BEARING AND JOURNAL TO BE OPENED UP FOR CSM SURVEY
CHECK AND RECORD ALL BRG CLEARANCES BEFORE AND AFTER INSPECTION.
ALL PARTS TO CLEAN AND PRESENT TO CLASS SURVEYOR
JOURNALS TO POLISH PRIOR BOXING UP.DYE PENETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK.
AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK AS ORIGINAL.
ALL AHEAD AND ASTERN THRUST BEARINGS TO BE OPENED UP AS PER MANUAL AND SAME TO BE PUT UP FOR SHOWN TO SURVEYER.UP TO SURVEYOR SATISFACTION UNDER CSM SURVEY.
THURST SHAFTING ALIGNMENT TO CHECK IN PRESENCE OF CLASS SURVEYOR.
ANY BEARING SHELL FOUND DAMAGED,SAME TO BE BOXED BACK WITH NEW SHELL(SHIP SUPPLY),CONSIDER TWO NOS FOUND DAMAGED.
CARRIED OUT DP TEST AND RENEWING MAIN BEARING SHELL.
MAIN ENGINE CRANK PIN BEARINGS
ME ALL UNIT CRANK PIN BRGS TO BE OPENED UP FOR OVERHAUL AND SURVEY.FOLLOWING JOBS TO BE CARRIED OUT AS PER MAKER'S INSTRCUTIONS.
CHECK AND RECORD ALL BEARING CLEARANCES BEFORE AND AFTER INSPECTION.
LOWER THE BOTTOM HALVES IN THE CRANKCASE,X-HEAD ON TO GUIDES SUPPORT AND SWING OUT CONNECTING RODS FOR INSPECTION UPPER BRG HALVES.
CLEAN ALL PATRTS AND PRESENT TO CLASS SURVEYOR,DYE PENETRANT TEST TO BE CARRIED OUT.
ALL CRANKSPINS TO POLISH USING POLISHING FILM PAPER AND PIN TO CALIBRATE AND RECORD READINGS.
AFTER SUCCESSFUL COMPLETION OF SURVEY,BRGS TO BE BOXED BACK AS ORIGINAL.
BRG CLEARANCES TO BE CHECKED BEFOR AND AFTER WORK.
IF ANY BEARING SHELL FOUND DAMAGED,SAME TO BE BOXED BACK WITH NEW SHELL(SHIP SUPPLY)
CARRIED OUT DP TEST
MAIN ENGINE CROSS HEAD BEARINGS.FOLLOWING JOBS TO BE CARRIED OUT AS PER MAKER'S INSTRUCTIONS.ALL MATERIALS ,TOOLS ,MEASURING INSTRUMENTS AND CONSUMABLES FOR THIS JOB SUPPLY IN CONTRACTOR SCOPE.ALL MACHINING WORKS,WELDING/BRAZING WORKS ARE IN CONTRACTOR SCOPE.OEM SPARES AND SPECIAL TOOLS SHIP SUPPLY.
ME CROSS HEAD BRG TO BE OPENED UP FOR SURVEY.
CHECK AND RECORD CROSSHEAD BRGS AND GUIDESHOE CLEARANCES BEFORE OPENING THE XHD BEARING AND AFTER ASSEMBLY OF XHD BRGS.
DISMANTLE BRG AS PER MAKER'S INSTRUCTION.BOTH TOP AND BOTTOM BEARING TO BE TAKEN OUT. ALL PARTS TO BE CLEANED.BOTH TOP AND BOTTOM BRG SHELLS AND CROSSHEAD PINS TO BE EXAMINED. CROSSEHAD PIN TO CALIBRATE AND READINGS TO RECORD.DYE PENETRANT TEST TO BE CARRIED OUT.
TO MEASURE CLEARANCE BETWEEN ALL RECIPROCATING PARTS: 1. CENTERING OF THE LINER 2. CLEARANCE BETWEEN GUIDE STRIP AND XHD 3. CLEARANCE BETWEEN GUIDE SHOE AND XHD.
MAIN ENGINE CROSSHEAD PIN RENEWAL , PIN SHIP SUPPLY
MAIN ENGINE AIR COOLER
AIR COOLER ONE NO. TO BE REMOVED FROM PLACE AFTER REMOVING ALL CONNECTIONS & TRANSPORTED TO WORKSHOP.COOLER TO BE DISMANTLED AND ELEMENT TO BE CLEANED CHEMICALLY.(BOTH AIR AND WATER SIDE),COOLER END COVER ZINC ANODE TO RENEW AND COVERS TO BE PAINTED WITH TEMP.RESISTANT(CONTRACTOR SUPPLY). QUOTE FOR OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS , MANPOWER , TRANSPORTATION ETC
AIR COOLER CLEANING NOZZLES TO BE CLEANED AND IF REQUIRED MAKE NEW.
COOLER TO BE PRESSURE TESTED TO 5 BAR TO SHIP STAFF SATISFACTION.IF ANY TUBES ARE LEAKING,PLUGGING TO BE DONE.
AFTER SUCCESSFUL COMPLETION OF SURVEY COOLER TO BE FITTED BACK IN PLACE WITH NEW GASKET(CONTRACTOR SUPPLY) & TESTED.
PRESSURE FROM MANOMETER ASSEMBLY TO RENEW (CONTRACTOR SUPPLY).U-TUBE MANOMETETR TO BE RENEWED IF BROKEN GLASS
CHEMICAL CLEANING DISCHARGE LINE FILTER BODY TO RENEW .ALL BROKEN,RUSTED,MISSING PARTS TO RENEW(CONTRACTOR SUPPLY)
AIR COOLER TUBES TO BE RENEWED , TUBES CONTRACTOR SUPPLY
PRE-TENSIONING STAY BOLTS; TIE BOLTS FOR M/E
SUPPLY OF ONE PNEUMATIC HYDRAULIC P/P (1500 BAR) ALONG WITH NECESSARY CONNECTIONS FOR REQUIRED MAIN ENGINE JOB
14 NOS. TIE BOLTS TO BE CHECKED FOR PRETENSION. HYDRAULIC DISMANTLING PRESSURE 1500 BAR (TO CONFIRM).STAY BOLTS TO BE RETIGHTENED IN PAIRS,WORKING FROM THE MIDDLE TOWARDS ONE END AND THEN AGAIN FROM THE MIDDLE TOWARDS THE OTHER END.
RE-TIGHTENING OF HOLDING DOWN BOLTS OF M/E
ALL HOLDING DOWN BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH HOLDING DOWN BOLTS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WH. IMMEDIATELY AFTER FINISHING OF CHECKING OF THE LOOSENING PRESSURES OF THE HOLDING DOWN BOLTS AND THE RETIGHTENING OF THE HEIGHT OF THE EPOXY SUPPORTING CHOCKS ARE TO BE CHECKED.
END CHOCKS FOR M/E
ALL END CHOCK BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH EPOXY CHOCKS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT
ALL END CHOCK BOLTS TIGHTNESS TO BE CHECKED USING HYDRAULIC JACK MARKED WITH END CHOCKS AND RECORDED. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENING PRESSURE THEREAFTER. TIGHTENIG PRESSURE – TO CONFIRM.
MAIN ENGINE CRANKCASE & SUMP
MAIN ENGINE SUMP (CIRCULATING LUB OIL TANK.) LUB OIL TO REMOVE FROM THE TANK & COLLECT IN ABSOLUTELY CLEANED TANKS OR DRUMS (CONTRACTOR SUPPLY), TANK TO BE VENTILATED; MAN ENTRY CERTIFICATE TO BE OBTAINED AND TANK TO BE THOROUGHLY CLEANED OFF SLUDGE. SUMP CAPACITY:17.69 M3
ENTIRE CRANK CASE WITH GEARS TO BE CLEANED THOROUGHLY TO REMOVE DIRTY OIL STAINS FROM THE WALLS OF CRANK CASE & SURFACES OF THE RUNNING GEARS.
INSPECTION OF CRANKCASE DRAIN TANK STRUCTURE TO BE CARRIED OUT; IF ANY CRACK FOUND IN THE STRUCTURE IN BETWEEN COFFERDAM AND DRAIN TANK; SAME TO BE WELDED / REPAIRED AFTER OBTAINING NECESSARY HOTWORK PERMIT.
OIL TO PUT BACK IN SUMP AFTER COMPLETION OF CLEANING AND INSPECTION.MANHOLES FOR THE SUMP ENTRY TO BE OPENED AND BOXED BACK AFTER THE WORK.
THE NEOPRENE JOINT BETWEEN THE SUMP AND CRANCASE TO RENEW . JOINT CONTRACTOR SUPPLY.
SERVO OIL PUMP FOR M.E. EXHAUST V/V(02 NOS)
ALL SERVO PO PUMPS TO BE OVERHAULED AS PER MAKER INSTRUCTIONS BY WARTSILA SERVICE ENGINEER.
BEARING BUSHES AND PINION TO BE CHECKED.
CAMSHAFT BEARING CLEARANCE TO BE CHECKED.
CAMSHAFT THRUST BEARING CLEARANCES TO BE CHECKED
SERVO OIL AUTOMATIC FILTER PRESENTLY NOT IN USE SAME TO BE MADE OPERATIONAL.
ME CYLINDER LUBRICATORS
ALL 6 UNITS CYLINDER LUBRICATORS TO REMOVE FROM PLACE AND CLEANED THOROUGHLY WITH KEROSENE ANND FLUSHED WITH LUB OIL.ALL LINE FILETRS TO CLEAN.
ALL CYLINDER PUMPS OPERATION TO CHECK AND REPAIR AS REQUIRED
TIMINGS OF CYLINDER ADMISSION TO BE CHECKED AS PER MAKER'S INSTTRUCTIONS
ADJUSTMENT OF CYLINDER LUBRICATOR TO BE CARRIED OUT AS REQUIRED.
CHECK GAS PRECHARGE PRESSURE,SAFETY DEVICES,FITTINGS,LINE CONNECTIONS AND ACCUMULATOR FIXATION OF DIAPHRAM ACCUMULATOR
NITROGEN TO BE CHARGED IN ALL THE ACCUMULATOR( CONTRACTOR SUPPLY )
ME VIBRATION DAMPER
ME VIBRATION DAMPERS OPEN UP & SHOW TO SURVEYOR,UP TO SURVEYOR SATISFACTION UNDER CSM SURVEY.AFTER SHOWING SAME TO BOX BACK AS PER MAKER'S MANUAL.
MAIN ENGINE GOVERNOR ACTUATOR TYPE:WARTSILA RTFLEX-50B MAIN ENGINE GOVERNOR TO BE OVERHAULED THROUGH MAKER'S SERVICE ENGINEER.QUOTE FOR SERVICE KIT AND OTHER NECESSARY PARTS REQUIRED TO RENEW.DURING OVERHAULING,PARTS SHOULD BE FORM THE ORIGINAL MANUFACTURER.OVERHAULING TO BE DONE BY MAKER'S APPROVED WORKSHOP,JOB INCLUDES GOVERNOR REMOVAL,TRANSPORTION,ON BOARD FITMENT,SATISFACTORY TRIALS SHOWN TO SHIPSTAFF AT BASIN TRIALS AND SEA TRIALS.
Sri Balaji Marine and Civil Engg Works
Asha Engineering Works
Marine Corporation of India, Anand Ship Care Institute Pvt Ltd
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .