| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹6.7 L (3.83%)Admitted-Finance | ₹1.8 Cr+₹6.7 L (3.83%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹14.5 L (8.29%)Admitted-Finance | ₹1.9 Cr+₹14.5 L (8.29%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹16.5 L (9.44%)Admitted-Finance | ₹1.9 Cr+₹16.5 L (9.44%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹20.6 L (11.8%)Admitted-Finance | ₹2.0 Cr+₹20.6 L (11.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | m/s lal construction L1 | Rajesh Bhardwaj Construction Pvt. Ltd L2 | M/S JITENDRA KUMAR SINGH L3 | M/s Jagdhatri Prasad Singh L4 | BHARDAWAJ ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Details | ||||||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201. | 14,505 | m2 | - | - | - | - | - |
| 3.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. ( Dismantling of cement concrete) | 33.84 | m3 | - | - | - | - | - |
| 4.00 | Dismantling of Rubble masonary/Brick masonary in cement mortar Vide SOR 2.6/2.7 (B) | 1,378.44 | m3 | - | - | - | - | - |
| 5.00Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. | ||||||||
| 6.00 | (A) up to 600mm dia | 120 | M | - | - | - | - | - |
| 7.00 | Compacting original ground supporting subgrade: Loosening, of the ground upto level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of of Tables 300.1 and 300.2 for subgrade construction as per Technical Spe | 4,135.95 | m3 | - | - | - | - | - |
| 8.00 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 415.35 | m3 | - | - | - | - | - |
| 9.00Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a free lead as per Technical Specification Clause 301.5 | ||||||||
| 10.00 | (Free Lead) | 14,469.43 | m3 | - | - | - | - | - |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
5 Nov 2019, 1:00 pmClosed
CHIEF ENGINEER, JSRRDA, RANCHI
FFP BUILDING, 3RD FLOOR, DHURWA, RANCHI- 834004, JHARKHAND
CONSTRUCTION AND MAINTENANCE OF ROAD
2019_CEJHR_83120_1
JH10XVI-2-GUM11
Open Tender
Civil Works - Roads
Item Rate
245 days
GUMLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
CHIEF ENGINEER, JSRRDA
₹4.1 L
Yes
9 Jan 2020
21 Oct 2019
7 Nov 2019
21 Oct 2019
5 Nov 2019
21 Oct 2019
Amount
Details
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. ( Dismantling of cement concrete)
Dismantling of Rubble masonary/Brick masonary in cement mortar Vide SOR 2.6/2.7 (B)
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
(A) up to 600mm dia
Compacting original ground supporting subgrade: Loosening, of the ground upto level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of of Tables 300.1 and 300.2 for subgrade construction as per Technical Spe
Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a free lead as per Technical Specification Clause 301.5
(Free Lead)
(Lead upto 250m))
Subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with free lead as per Technical Specification Clause 303.1. FREE LEAD
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 With lead upto250m as per Technical Specification Clause 404.
Earthen Shoulders Part of Flexible Pavement (75%)
Earthen Shoulders Part of Flexible Pavement (25%)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.. GRADING-III. Cement Treated@ 5%
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. GRADING-II. Cement Treated@ 5%
PRIME COAT (I) LOW POROSITY Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Surface dressing using Bituminous Emulsion (Nominal chipping size 13.2mm) Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.
Surface dressing using Bituminous Emulsion (Nominal chipping size 9.5mm) Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.
Construction of un-reinforced, dowel jointed at expansion and construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days
Providing and fixing of typical PMGSY informatory Sign Board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6mm thick top and middle plate duly welded with MS flat iron 25mmx5m size on back onedges. The lower plate will be welded with MS angle iron frame of 25mmx25mm x5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm x 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All MS will be stoe enameled on both sides. Lettering and printng arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy as per drawing.
Direction and Place Identification Signs upto 0.9 sqm Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing
Reinforced cement concrete M-15 grade Ordinary Kilometer Stone (Precast) stone/Local stone of stadard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical Specification Clause 1703.
Reinforced cement concrete M-15 grade 200m stone (Precast) stone/Local stone of stadard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical Specification Clause 1703.
Boundary pillar: Reinforced cement concrete M-15 grade boundary pillars/Local stone of standard design as per IRC:25 fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 704. (Boundary pillar/ FI Post)
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered/concrete surface as per drawing and Technical Specification Clause 1701
SETTING OUT
HUME PIPE CULVERT 1nx1m dia
Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 including setting out,construction of shorting and bracing, removal of stumps and other deleterious
Bedding for pipe(ii) Type A (First Class) Bedding on well compacted sand, moorum or approved granular material as per clauses 1105 (ii)
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling Coarse below open foundation of Head walls as per drawings & Technical Specification Clause 1109
Gravel/Soil-Aggregate Surface Course (Table 400.3) - Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402. GSB bellow pipe
Stone masonry in cement mortar (1:4) random rubble masonry for foundation complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
Providing and laying 1000mm dia reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar (1:2) but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets clause 1106 SOR 9.3 (B)
Providing 25mm thick cement plaster (1:4) with clean coarse sand of FM 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I
Providing white washing, three coats over new surface with approved quality of lime including cost of cleaning surface thoroughly and removing the scales of smoke and mash marks with jhama rubbing scaffolding, washing of floors and taxes all complete as per building specification and direction of E/I.
NP3 Hume pipe culverts in Double row of pipe
E/W in ex{avation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material 1 (i) upto 3 m depth
Hard rock
Soft rock
Providing concrete for plain/reinforced concrete (1:3:6) in open foundations complete as per drawings and technical specifications clause no. 802, 803, 01202 and 1203
Random Rubble Stone masonary work in cement mortar (1:4) in foundation complete as per drawing and technical specification clause 802, 803, 1202 and 1203
Providing and laying 1000mm dia reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar (1:2) but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets clause 1106 SOR 9.3 (B)
Providing and lying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1 no. fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications clause 1301
Providing PCC (1:2:4) over head wall in coping..etc all complete job as per specification and direction of E/I.
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
White washing two coats on parapet walls as per technical specification clause 1915 SOR 15.13
Maintenance
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
Rajesh Bhardwaj Construction Pvt. Ltd
M/S JITENDRA KUMAR SINGH
M/s Jagdhatri Prasad Singh
BHARDAWAJ ENTERPRISES
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
BOQ_148490.xls
BOQ • 0.31 MB
JH-XVI-II-GUM-11.pdf
Tender Documents • 2.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .