Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Jan 2022, 11:00 amClosed
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Overhauling of Valves at various locations MV Vishva Vijetha
2022_HSL_88676_1
20 / 22002 / VALVES / 185 / 2021-22
Open Tender
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹525
Yes
HSL
₹20,000
Yes
29 Jan 2022
17 Jan 2022
25 Jan 2022
17 Jan 2022
25 Jan 2022
17 Jan 2022
Amount
SCOPE OF WORK: 1) VALVES TO BE IDENTIFIED WITH TAGS AS PER THE QDL IN CONSULATION WITH SHIP STAFF & HSL OFFICERS. 2) VALVES TO BE REMOVED FROM THE POSITION AND SHIFTED TO WORKSHOP FOR DISMANTLING WITH ONE PIPE ON EACH SIDE SHELL BE REMOVED & REFITTED WITH NEW/REPAIRED VALVE HANDLES / SHEELS AFTER COMPLETION OF OVERHAULING. 3) VALVES TO BE DISMANTLED FULLY AND ALL PARTS I.E, VALVE BODY, COVER LID, SEAT, GLAND, SPNDLE, LOCKS ETC TO BE THROUGHLY CLEANED ON ALL RESPECTS AND OFFER INITIAL INSPECTION / SURVEY TO SHIP STAFF HSL OFFICERS / CLASS SURVEYORS FOR DEFECTION AND REPORT TO BE PREPARED. 4) REMOVE THE FILTER BODY COVER. 5) TAKE OUT THE STRAINER ELEMENT. 6) FABRICATION OF NEW STRAINER ELEMENTS USING PREPORATED SHEET AS PER THE EXISTING DIMENSIONS (MAT: BRASS /BRONZE/SS) WHERE EVER RENEWAL IS REQUIRED. 7) CLEAN, SCRAP & PAINT (AS PER NAVY PAINT SCHEME) THE FILTER BODY. 8) FIT THE NEW STRAINER ELEMENT IN THE BODY AND COVER ALONG WITH NEW FASTERNERS AND NUTS (BUTTERFLY NUTS), RUBBER / OIL JOINTS. 9) ALL MANDATORY SPARES I.E OIL . PURE NEOPRENE RUBBER JOINTS,, SS BOLT & NUTS WASHERS, PAINTS ETC TO BE REPLACE BY THE OFF LOADING PARTY AND SHALL BE OF GENUINE QUALITY, (TVS/UNBRAKO/USHA MARTIN/ LUCAS). 10) STRAINER BODY COVER IF FOUND DAMAGED TO BE REPLACED WITH NEWLY FABRICATED (MAT: CAST IRON). 11) REMOVAL & SHIFTING OF THE FILTER BODIES OT THE WORK SHOP IS CONTRACTOR'S SCOPE. 12) DURING SEA TRIALS THE CONTRACTOR MUST PRESENT FOR INTERMEDIATE CLEANING OF STRAINERS AND NECESSARY ASSISTANCE TO BE PROVIDED. 13) Consumable like packing, fasteners are in contrcators scope
DETAILS OF THE SCOPE IS AS FOLLOWS: Note: Bidders are advised to read the annexure before quoting and consider the scope to executed in the attached Annexure-A details also.
OVERHAULING OF EDUCTOR VALVE
FOLLOWING NON RETURN VALVES TO BE TRANSPORTED TO WORKSHOP; OVERHAULED AND TO BE FITTED BACKWITH NEW NUTS/BOLTS/PACKING (VENDOR SUPPLY).
NO. 1 AND 2 WB PUMP DISCH NR DIA 350 MM
TO FABRICATE AND RENEW THE NR FLAP OF MATERIAL SS
AFT PEAK BUTERFLY WAFER V/V TO BE REMOVED SERVICED PRESSURE TESTED 8 KG/SQ CM AND FITTED BACK. IF REQUIRED SEAT RING TO BE RENEWED. NO.1
NO.3 HOLD BALLAST LINE, V/V S AND BLANK TO BE OPENED, OVERHALED INSPECTED AND FITTED BACK.
N/R VALVE IN HOLD BILGES 14 NOS. TO BE DISMANTLED, REMOVED TO THE WORKSHOP, CLEAN/OVERHAULED, RUBBER RINGS RENEWED, DESHAPED/FACE PLATE POLISHED/ RENEWED TO ACHIEVE WATER TIGHTNESS AND PRESSURE TESTED AT 5KG/CM2 BEFORE FITTING BACK.
TOTAL 4 NOS GLOBE V/V FOR DRAFT GAUGE SYSTEM TO BE REMOVED OVERHAULED AND PRESSURE TESTED SIZE 8 KG/CM2 FITTED BACK. SAME TO BE SHOWN TO CLASS SURVEYOR BEFORE FITTING BACK IN PLACE.
21 NO. OF BALAST VALVE IN E/R TO BE OPENED AND OVERHAULED TO CHECK WEAR AND TEAR. BALLAST AND CARGO BILGE EDUCTOR NOZZLES TO BE REMOVED, O/HAULED, IF REQUIRED RENEWED AND FITTED BACK.
AFTER FITTING ALL THE DB’S VALVE BALLAST LINE(TST ABD DB’S) , F.P.K , NO.3 HOLD TO BE PRESSURE TESTED TO THE SATISFACTION OF ATTENDING SURVEYORS (QUOTE LUMPSUM)
TOP SIDE WATER BALLAST TANK BLOCK MANIFOLD TO RENEW
VALVES : ACCOMMODATION/DECK PIPE LINES AND VALVES O/HAULING
TO OVERHAUL AND PRESSURE TEST ISOLATION VALVES FOR DECK AND ACCOMMODATION ON FIRE LINE GATE VALVE SIZE 125 MM - ALL THE RENEWALS SUCH AS SPINDLE GATE,GLAND TO BE CONSIDERED. NO EXTRA QUOTE UPON DISMANTLING ALLOWED.
MANUAL VALVES FOR DECK COMPRESSED AIR LINE TO BE OVERHAULED AND FITTED ALONG WITH THE ADAPTOR FOR CONNECTING WITH AIRHOSES 30 NOS. SIZE FOR 15 MM OD.PHOTS ATTACHED
DRAINAGE SYSTEM INSIDE ACCOMMODATION TO BE CLEANED AND RENEWED AS REQUIRED.
MANUAL GLOBE VALVES 8 NOS IN FOREPEAK STORE TO BE OPENED , OVERHAULED AND FITTED BACK. THE QUOTE SHALL BE ALL INCLUSIVE OF RENEWAL OF SPINDLE,SEAT MACHINING, VALVE LID ETC.
SUPPLY AND FIT THE ANCHOR WASH GLOBE VALVE ON FOCASTLE DECK, VENDOR SUPPLY SPECIFICATION:
DRAIN VALVE TO BE OVERHAULED.(16K 25)
SEA SUCTION VALVES IN E/R (SURVEY)
TYPE / CAPACITY / DETAILS -
THE FOLLOWING SEA INJECTION VALVES TO BE OPENED UP IN PLACE FOR O’HAULING. ALL PARTS TO BE CLEANED & INSPECTED FOR CORROSION / WEARDOWN / DAMAGE. ALL WORN / DEFECTIVE VALVES / PARTS TO BE RENEWED WITH CLASS APPROVED TYPE (SHIP SUPPLY). ALL GROOVES ON THE ON THE V/V SEATS AND V/V LIDS,IF FOUND PITTED.TO BE TRANSPORTAED TO YARD,S WORKSHOP,SKIMMED AND TRANSPORATED BACK TO SHIP.VALVES TO BE GROUND ON THE SEATS.BLUE IMPRESSION OF VALVE SEATS AND VALVES LIDS TO BE SHWON TO CEO/2EO/SURYEOR.ALL VALVES TO BE PRESSURE TESTED AND PRESENTED TO SURVEYORS & AFTER THEIR APPROVAL ALL V/V'S TO BE ASSEMBLED USING NEW JOINTS & PACKINGS DULY APPROVED BY 2EO/CEO(JOINTS & PACKINGS VENDOR SUPPLY).ALL VALVE CASING INTERNALLY SCRAPPED,CLEANED & EPOXY COATED.COMPLETE SEA INJECTION TUBE BETWEEN HIGH SEA CHEST AND LOW SEA CHEST TO CLEAN INTERNALLY BY SEPARATING FROM THE FLANGES,V/V BODIES & V/V COVERS TO BE GAUGED(MIN. 20 POINTS) ULTRASONICALLY & REPORT TO BE SUBMITTED. QUOTE FOR VALVES OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS , MANPOWER , TRANSPORTATION ETC.
LOW SEA CHEST
MAIN SEA SUCTION V/V BEFORE FILTER DN500 BUTTERFLY .
MAIN SEA SUCTION V/V AFTER FILTER DN 500 BUTTERFLY.
AIR VENT VALVE . DN DN 80 GATE
STEAM BLOW OFF VALVE . DN 20 GLOBE
COMPRESSED AIR BLOW OFF V/V . DN 20 GLOBE
COMMON V/V FOR STEAM /COMPRESSED AIR BLOW OFF DN 20 GLOBE .
AIR VENT V/V FOR FILTER . 100 MM GLOBE
HIGH SEA CHEST
MAIN SEA SUCTION V/V BEFORE FILTER DN500 BUTTERFLY
MAIN SEA SUCTION V/V AFTER FILTER DN 500 BUTTERFLY
AIR VENT VALVE DN DN 80 GATE
STEAM BLOW OFF VALVE DN 20 GLOBE
COMPRESSED AIR BLOW OFF V/V DN 20 GLOBE
COMMON V/V FOR STEAM /COMPRESSED AIR BLOW OFF DN 20 GLOBE
AIR VENT V/V FOR FILTER 100 MM GLOBE
EMERGENCY SEA CHEST
SEA SUCTION VALVE (ANGLE) DN-125 MM
EMERGENCY FIRE P/P DISCHARGE V/V DN100 GLOBE
OVERBOARD DISCHARGE VALVES (SURVEY)
TYPE / CAPACITY / DETAILS :
THE FOLLOWING OVERBOARD TO BE OPENED UP IN PLACE FOR O’HAULING. ALL PARTS TO BE CLEANED & INSPECTED FOR CORROSION / WEARDOWN / DAMAGE. ALL WORN / DEFECTIVE VALVES / PARTS TO BE RENEWED WITH CLASS APPROVED TYPE (SHIP SUPPLY). ALL NUT BOLTS TO BE RENEWED WITH SS BOLTS . ALL GROOVES ON THE ON THE V/V SEATS AND V/V LIDS,IF FOUND PITTED.TO BE TRANSPORTAED TO WORKSHOP,SKIMMED AND TRANSPORATED BACK TO SHIP.VALVES TO BE GROUND ON THE SEATS.BLUE IMPRESSION OF VALVE SEATS AND VALVES LIDS TO BE SHWON TO CEO/2EO/SURYEOR.ALL VALVES TO BE PRESSURE TESTED AND PRESENTED TO SURVEYORS & AFTER THEIR APPROVAL ALL V/V'S TO BE ASSEMBLED USING NEW JOINTS & PACKINGS DULY APPROVED BY 2EO/CEO(JOINTS & PACKINGS VENDOR SUPPLY).ALL VALVE CASING INTERNALLY SCRAPPED,CLEANED & EPOXY COATED. QUOTE FOR VALVES OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS , MANPOWER , TRANSPORTATION ETC.
MAIN SEA COOLING WATER OVERBOARD V/V STBD GLOBE V/V DN-300 MM
FIRE& BILGE G.S. GLOBE DN- 250MM
BALLAST OVBD(FOR STBD SIDE TANKS) DN-350 ANGULAR
BALLAST OVBD(FOR PORT SIDE TANKS) DN-350 GLOBE
EJECTOR P/P DISCHAGRE OVBD V/V DN-100 GLOBE
COOLING WATER OVBD V/V DN 100 GLOBE
BILGE WATER SEPARATOR OVERBOARD DISCH. V/V GLOBE DN -50 MM
BILGE & BALLAST EDUCTION DISCH OVBD STBD GLOBE DN -125MM
BILGE & BALLAST EDUCTION DISCH OVBD PORT GLOBE DN -150MM
BOILER BLOW DOWN OVBD V/V DN 40 GLOBE
SEWAGE GREY WATER DISCH.OVBD V/V DN 150,GATE
INTERMEDIATE SEA WATER VALVES
TYPE / CAPACITY / DETAILS :
TO REMOVE FOLLOWING INTERMEDIATE VALVES FROM PLACE & TRANSPORTED TO YARD WORK SHOP FOR CLEANING; INSPECTION & OVERHAUL. ALL VALVES TO BE DISMANTLED. ALL PARTS TO BE CLEANED & INSPECTED FOR CORROSION; WEARDOWN & DAMAGE IN THE PRESENCE OF 2EO / CEO. ALL WORN / DEFECTIVE VALVES / PARTS TO BE RENEWED WITH CLASS APPROVED TYPE (VENDOR SUPPLY).ALL NUT BOLTS TO BE RENEWED WITH VENDOR SUPPLIED SS BOLTS. ALL VALVE BODIES TO BE THOROUGHLY CLEANED INTERNALLY. ALL GROOVES ON THE ON THE V/V SEATS AND V/V LIDS TO BE SKIMMED LIGHTLY & VALVES TO BE GROUND ON THE SEATS.BLUE IMPRESSIONS TO BE TAKEN FOR THE VALVE LIDS & VALVE SEATS & SHOWN TO 2EO/CEO.VALVE BODIES TO BE INTERNALLY PAINTED WITH TWO COATS OF EPOXY OR VALVE BODIES TO BE PAINTED EXTERNALLY(PAINTS VENDOR SUPPLY).VALVE SPINDLES TO CHECK FOR FREE OPERATION.VALVE LOCKINGS TO CHECK.BUTTERFLY VALVES SEAT RINGS TO CHECK FOR DAMAGE/DEFORMATION.DAMAGED/DEFORMATED SEAT RINGS TO BE RENEWED(YARD SUPPLY).B'FLY VALVES OPERATING GEAR MECHANISM & V/V LOCKINGS TO CHECK & RECTIFY THE DEFECTS.DEFECTIVE PARTS TO RENEW(VENDOR SUPPLY). VALVES TO BE PRESSURE TESTED AND SHOWN TO SURVEYOY . ALL V/VS TO BE BOXED BACK AS THE ORIGINAL USING NEW JOINTS &PACKINGS(VENDOR SUPPLY)CORRECT ALIGNMENT OF BUTTER FLY V/VS TO CHECK.ALL V/VS TO BE PRESSURE TESTED. QUOTE FOR VALVES OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS , MANPOWER , TRANSPORTATION ETC.
MAIN SEA WATER P/P #1 & #2 & #3 INLET/OUTLET VALVE ND 250 MM BUTTERFLY VALVE
SEA WATER RECIRCULATION VALVE PCD 310MM BUTTERFLY VALVE
LI COOLERS S.W. IN/OUT AND BACK FLUSH IN/OUT V/V DN 250 BUTTERFLY V/V
EJECTOR PUMP SUCTION VALVE PCD 180 MM BUTTERFLY
EJECTOR PUMP DELIVERY LINE DN100 MM GLOBE
INTERMIDITAE V/V B/W EJECTOR P/P DIS LINE AND FIRE/GS P/P ND 80 MM GLOBE
FIRE & G.S P/P TO FIRE MAIN DN 150 MM BUTTERFLY
FIRE & G.S P/P TO FIRE MAIN DN 150 MM BUTTERFLY
FIRE & GS P/P TO OVERBOARD DN200 BUTTERFLY
FIRE & GS P/P TO OVERBOARD DN200 BUTTERFLY
EMERGENCY FIRE PUMP OUTLET VALVE DN 100 MM GLOBE
FIRE & G.S. PUMP TO/FRM SLOPE & SEWAGE TAK V/V DN150 BUTTERFLY
BILGE & G.S. PUMP TO/FRM SLOPE & SEWAGE TAK V/V DN150 BUTTERFLY
FIRE & G.S. PUMP TO AFT PEAK TK DN200 BUTTERFLY
BILGE & G.S. PUMP TO AFT PEAK TK DN200 BUTTERFLY
CARGO HOLD BILGE STRIPPING EDUCTOR DRIVE VALVE DN80 GLOBE
CARGO HOLD BILGE STRIPPING EDUCTOR INLET VALVE DN125 GLOBE
CARGO HOLD BILGE STRIPPING EDUCTOR DISCHARGE VALVE DN125 GLOBE
NO.1 BALLAST STRIPPING EDUCTOR DRIVE VALVE DN80 GLOBE
NO.1 BALLAST STRIPPING EDUCTOR INLET VALVE DN125 BUTTERFLY
NO.1 BALLAST STRIPPING EDUCTOR DISCHARGE VALVE DN125 BUTTERFLY
NO.2 BALLAST STRIPPING EDUCTOR DRIVE VALVE DN80 GLOBE
NO.2 BALLAST STRIPPING EDUCTOR INLET VALVE DN125 BUTTERFLY
NO.2 BALLAST STRIPPING EDUCTOR DISCHARGE VALVE DN125 BUTTERFLY
AFTER PEAK TANK BALLAST VALVE PCD 300 MM BUTTERFLY
FIRE & G.S. P/P SUC FROM SEA MAIN DN 200 BUTTERFLY
BILGE & G.S. P/P SUC FROM SEA MAIN DN 200 BUTTERFLY
FIRE & G.S. P/P SUC FROM BILGE MAIN DN 200 BUTTERFLY
BILGE & G.S. P/P SUC FROM BILGE MAIN DN 200 BUTTERFLY
FIRE & G.S. P/P SUC FROM F.W. WASHING TANK. DN 150 BUTTERFLY
FIRE & G.S. P/P SUC FROM F.W. WASHING TANK DN 150 BUTTERFLY
MSW P/P DISCHARGE SIDE NRV DN250 NRV
NO.1 BALLAST STRIPPING EDUCTOR INLET SIDE NRV DN125 NRV
NO.2 BALLAST STRIPPING EDUCTOR INLET SIDE NRV DN125 NRV
FIRE & G.S PUMP DISCHAGRE SIDE NRV DN200 NRV
BILGE & G.S PUMP DISCHAGRE SIDE NRV DN200 NRV
BILGE & G.S PUMP DISCHAGRE TO AFT PEAK TANK. NRV DN200 NRV
BILGE & G.S PUMP DISCHAGRE TO AFT PEAK TANK NRV DN200 NRV
FIRE & GS PUMP TO FIRE MAIN LINE NRV DN150 NRV
BILGE & GS PUMP TO FIRE MAIN LINE NRV DN150 NRV
CARGO HOLD BILGE STRIPPING EDUCTOR INLET SIDE NRV DN25 NRV
ATM CONDENSOR
STEAM TO DUMP CONDENSER INLET & OUTLET V/VS DN 50 GLOBE
AUTO DUMP VALVE DN40 GLOBE
MANUAL DUMP VALVE DN65 GLOBE
ATM CONDENSOR INLET/OUTLET DN65 GLOBE
STEAM TO CONDENSOR DN32 GLOBE
LT FRSH WATER INLET/OUTLET TO CONDENSOR PCD205 GLOBE
LT COOLER FRESH WATER INLET/OUTLET DN250 BUTTERLFY
FRESH WATER GENERATOR JACKET INLET DN100 GLOBE
FRESH WATER GENERATOR JACKET OUTLET PCD100 BUTTERFLY
TECHNICAL WATER HYDROPHORE
HYDROPHORE DISCHARGE DN40 GLOBE
DISCHARGE TO MAIN DECK DN32 GLOBE
HYDROPHORE SUCTION/DISCHARGE DN50 ANGULAR
STBD/PORT TANKS SUCTION VALVE DN50 GLOBE
CHARGING AIR INLET VALVE . DN15 GLOBE
HYDROPHORE DRAIN VALVE DN32 GLOBE
INTERCONNECTION VALVE DN50 GLOBE
FRESH WATER HYDROPHORE
DISTILLATE TANK SUCTION DN32 GLOBE
HYDROPHORE DISCHARGE DN32 GLOBE
CHARGING AIR INLET VALVE DN15 GLOBE
HYDROPHORE PUMP SUCTION/DISCARGE DN32 ANGULAR
BILGE(DAILY)TRANSFER PUMP
SUCTION FROM BILGE MAIN DN65 ANGULAR
SUCTION FROM BILGE HOLDING TANK DN65 ANGULAR
DISCHARGE TO BILGE HOLDING TANK DN65 ANGULAR
BILGE WELL PORT/STBD/AFT SUCTION PCD180 BUTTERFLY
SLUDGE PUMP
DISCHARGE TO SHORE DN65 GLOBE
DISCHARGE TO INCINERATOR DN65 GLOBE
DISCHARGE TO PURIFIER SLUDGE TANK DN65 GLOBE
INLET FROM WASTE OIL TANK DN65 ANGULAR
INLET FROM FUEL OIL DRAIN TANK DN65 GLOBE
INLET FROM SLUDGE TANK DN65 GLOBE
OBS PUMP
SUCTION FROM BILGE HOLDING TANK DN65 GLOBE
SUCTION FROM BILGE MAIN DN65 GLOBE
3 WAY VALVE FOR SIMULATION. COCK
STEAM V/VS
H.F.O SETTLING TANK 1 STEAM INLET V/V DN25 STOP V/V
H.F.O SERVICE TANK 1 STEAM INLET V/V DN25 STOP V/V
NO.1 STBD,BUNKER TANK STEAM INLET V/V DN25 STOP V/V
CALORIFIER'S STEAM V/V AT STEAM DISTRIBUTOR DN25 STOP V/V
HO/LO PURIFIER HEATER STEAM INLET V/V DN25 STOP V/V
SEA WATER FILTERS
TYPE / CAPACITY / DETAILS :
FOLLOWING FILTERS TO OPEN; CLEAN AND BOX BACK WITH NEW GASKETS. PURGING V/VS OF FILTER COVERS (35mm DIA) TO OVERHAUL.FILTER ELEMENT TO RENEW WITH STAINLESS STEEL PERFORATED SHEET OF 6 MM THICKNESS; IF FOUND DAMAGED. FILTER CHAMBER TO BE APPLIED WITH 3 COAT OF EPOXY
FILTER DRAIN COVERS TO OPEN; COVER HOLDING STUDS (6 NO. × 5/8 DIA) TO BE REPLACED WITH G.I. STUDS AND NUTS AND COVERS TO FIT BACK WITH NEW PACKINGS FOR ITEM NOS. 01 TO 08. FILTER FOUNDATION BOLS SS MATERIAL TO BE RENEWED
MAIN HIGH SEA & LOW SEA SUCTION LINE FILTERS 2 NOS. SIZE OF FILTER ( 860 MM DIA*1100MM HEIGHT) TO RENEW
EJECTOR PUMP SUCTION FILTER OF SIZE 222 MM DIA * 750 MM HEIGHT TO RENEW
FILTER FOR EMC'Y FIRE P/P 270 MM DIA* 370 MM HEIGHT TO RENEW
STORM VALVES
WORK SPECIFICATIONS:
FOLLOWING STORM VALVES ARE TO BE OPENED UP; FOR OVERHAULING IN WORKSHOP. VALVES SEATS TO BE GROUND; LAPPED AND INTERNAL CASING TO BE CLEANED AND PAINTED WITH APEXIOR NO.3 (vendor SUPPLY). VALVES TO BE PRESENTED FOR SURVEY. NEOPRENE LEATHER PADS AND BRASS RETAINER RINGS ARE TO BE RENEWED. ON COMPLETION OF OVERHAULING VALVES TO BE FITTED BACK WITH YARDS SUPPLY NUTS/BOLTS AND PACKING. ALL SPARE vendor SUPPLY.
GREY WATER O'BOARD (P & S) STORM V/V 10K 125A
SEWAGE DIRECT O'BOARD STORM V/V 10K 150A
TO OVERHAUL ALL FIRE HYDRANTS ON MAIN DECK . MACHINERY SPACES AND IN ACCOMODATION IF REQ TO CHANGE WITH NEW(SHIP SUPPLY) VALVE
ALL FIRE HYDRANTS NEW CAPS TO FITTED AND SECURED WITH CHAIN, MATL vendor SUPPLY
TO RENEW AIR LINE AND VALVES ON MAIN DECK , ACCOMMODATION DECK,MONKEY ISLAND & FOREMAST. PIPE SIZE 1 INCH
TO RENEW FRESH WATER LINE AND VALVES ON MAIN DECK AND ACCOMMODATION DECK, PIPE SIZE 1.5 INCH DIA
DRAIN VALVE TO BE OVERHAULED.(16K 25)
FIRE LINE FOREC’SLE & BRIDGE WING PRESSURE GAUGES TO BE FITTED WITH NEW BALL VALVE. SIZE- 3/8”.
gk engineering works
MAYURI ENGINEERING WORKS
SON AND MOTHER ENGG ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .