Loading…
Loading…
Tender Value
₹1.0 L
EMD Value
₹2,200
Closing Date
28 Sept 2026, 5:00 pmDue tomorrow
Executive Engineer
HPPWD Division Nurpur
C/O V-shape drain with Edge wall at RD 4/030 to 4/060 L 30.00 Mtr Ht. 1.20 Mtr
2026_PWD_144081_5
4337-38 dated 21.9.2026
Open Tender
Civil Works
Percentage
Nurpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Yes
₹2,200
Yes
23 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator )/maanual means in oundation trenches or drains (not exceeding 1.5 m in width or 10 Sqmon plan ) ,inculding dressing of sides and ramming of bottoms ,lift up to 1.5 m,inculding getting out the excavated soil and diposal of sides and ramming of bottoms ,lift up to 1.5 m,inculding getting out the excavated soil and disposal of surplis excavated soils as directed ,with a lead of 50 m , hard rock (blasting prohibited) including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but execulding GST. | 27.3 | Per Cubic Meter | 298.48 | ₹8,148.5 |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete in open foundation and plinth for nominal mix 1: 4:8 ( one cement: four sand : eight graded crushed stone aggregate 40mm (forty millimeters) nominal size with 40mm stone aggregate in all heights / depths in or under water including pumping or bailing out water, dewatering, ( surface and sub soil water ) and removal of slush which may arise at the time of laying under water complete for all heights/depths and any quantum of water including cost of form work and curing complete in all type of structure like retaining walls, breast walls and the like etcetera as per drawing and MORD technical specification section 800, 900 and 1200 and as per the entire satisfaction and direction of the Engineer-in-Charge and Including carriage of materials within all leads and lifts and other incidental. including hauling of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government . | 23.4 | Per Cubic Meter | 3,739.2 | ₹87,497.28 |
| 3 | Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia PVC pipe extending though the full with of the structure with slope of 1(V):20(H) towards drawing face complete as per drwaings and technical specification clauses 614, 709, 1204.3.7 and as per entire satisfaction/ directions of Engineer –in charge Including carriage of materials within all leads and lifts and other incidental. including hauling of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government. | 28 | Each | 278.8 | ₹7,806.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 4.42 MB
SBD5626.pdf
Tender Documents • 2.59 MB
BOQ_214281.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .