| 1 | Supply of 2.0 TR High wall Split type AC | Supply of 2.0 TR High wall Split type Airconditioners not less than 5 star rating copper coil, inverter type fitted with extra powerful rotory or Reciprocating compressors, including remote, regfrigerant R-32 or R-22 or non CFC suitable for wall mounting confirming to IS 1391 or Part 21 or 92 Amdt. No. 1 (except power consumption norms) with 10 feet copper refrigeration pipes and suitable copper cable and having features like auto air swing(2 way swing), speed setting(3 by 3), operation control (electronic), auto restart, on timer, evaporator type (2 bend eva) suitable for operation on 230V, 50 Hz, single phase AC supply capable of performing
(a) Cooling (b) Dehumidifying. (c) Air-circulating (d) Filtering (anti-bacteria). | 21 | Each | amrendraks | 60 |
| 2 | Supply of 1.5 TR High wall Split type AC | Supply of 1.5 TR High wall Split type Airconditioners not less than 5 star rating copper coil, inverter type fitted with extra powerful rotory or Reciprocating compressors, including remote, regfrigerant R-32 or R-22 or non CFC suitable for wall mounting confirming to IS 1391 or Part � 21 or 92 Amdt. No. 1 (except power consumption norms) with 10 feet copper refrigeration pipes and suitable copper cable and having features like auto air swing(2 way swing), speed setting(3 by 3), operation control (electronic), auto restart, on timer, evaporator type (2 bend eva) suitable for operation on 230V, 50 Hz, single phase AC supply capable of performing
(a) Cooling (b) Dehumidifying. (c) Air-circulating (d) Filtering (anti-bacteria). | 6 | Each | amrendraks | 60 |
| 3 | Installation, Testing and commissioning of AC units | Installation, Testing & commissioning of AC units as mentioned in item no. 1 and 2 which includes mounting of indoor and outdoor unit including supply and fixing of MS stand at their respective location along with laying of refrigerant pipeline with insulation and flexible PVC covering pipe up to standard length supplied with the unit , connecting both the units , leak testing of entire system, connecting both indoor and outdoor units with three core 2.5 sq mm PVC insulated flexible copper cable supplied with the unit , top up of refrigerant (if required), minor civil repairing work as per site requirement complete as required. | 27 | Job | amrendraks | 60 |
| 4 | Providing and fixing of suitable size Copper Refrigerant piping | Providing and fixing of suitable size Copper Refrigerant piping suitable for R 32 (Supply and return) refrigerant with expanded polythene foam insulation tubing with flexible PVC covering pipe for Split type air conditioners as required.
(Measurement of 1 Running mtr. will include both supply and return Cu. Piping with insulation excluding standard length (3.5 Mtrs) supplied by OEM with AC unit). | 66 | Metre | amrendraks | 60 |
| 5 | Providing and fixing of 25 mm size PVC drain pipe | Providing and fixing of 25 mm size PVC drain pipe from the respective units, concealed in wall or clamping on surface, sealing the joints including making of opening and repairing of wall as per site condition. | 66 | Metre | amrendraks | 60 |
| 6 | Supply and fixing of 3 core, 2.5 sq mm size copper conductor | Supply and fixing of 3 core, 2.5 sq mm size copper conductor flexible cable for the interconnections between indoor and outdoor units of approved make complete as required at site.
(Measurement excluding standard length supplied by OEM with AC unit). | 90 | Metre | amrendraks | 60 |
| 7 | Supply and fixing of Single Phase, 240V Smart controller or Timer | Supply and fixing of Single Phase, 240V Smart controller or Timer with 4 hr or 8 hr duration, 25A capacity, having OV and UV indication or protection suitable for AC power supply 240V, 50 Hz, etc. complete as required. | 6 | Job | amrendraks | 60 |
| 8 | SITC of 5 KVA rating Automatic voltage stabilizer | SITC of 5 KVA rating Automatic voltage stabilizer suitable for operation on 160V to 260V, I or P single phase, AC supply with high or low voltage cut of time delay 3 min with O or P voltage 220V+-9%, including MCB, cable lead conforming to IS specification with voltmeter etc. complete as required. | 17 | Job | amrendraks | 60 |
| 9 | Dismantling the existing 1.5 TR or 2.0 TR Split type AC | Dismantling the existing 1.5 TR or 2.0 TR Split type AC of different capacities completely from different locations of the terminal building and shifting to AAI store ic. loading or unloading etc. complete as required. | 20 | Job | amrendraks | 60 |