Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC FYOULI RESORT FATA MAIKHANDA RUDRAPARYA | ₹1.2 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹1.2 CrRejected-Finance RUDRAPRAYAG | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹1.2 Cr | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | L3₹1.2 CrRejected-Finance 37 MOHAN VATIKA ACHIEVERS HOME PUBLIC SCHOOL WALI GALI JAGJEETPUR KANKHAL HARIDWAR 249408 U K | HARIDWAR | UTTARAKHAND | 249408 | ₹1.2 Cr | L3 | Rejected-Finance NOT QUALIFIED |
| Sl No | Description | Qty | Unit | M/s S S ENTERPRISES L3 | DEVENDRA SINGH BHANDARI L2 | PYARE LAL POWER ENGINEERING LLP/ AMIT KUMAR L1 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | ||||||
| 2.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 29 | NOS | 8,584 ₹8,584 | 8,555 ₹8,555 | 7,453 ₹7,453 |
| 3.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 60 | NOS | 17,940 ₹17,940 | 17,340 ₹17,340 | 15,360 ₹15,360 |
| 4.00 | PP & CLAMP FOR SP-23 WITHOUT NUT & BOLT | 34 | NOS | 6,630 ₹6,630 | 6,596 ₹6,596 | 5,304 ₹5,304 |
| 5.00 | BRACING CLAMP TOP FOR SP-23 WITH N/B | 24 | NOS | 6,360 ₹6,360 | 6,336 ₹6,336 | 6,264 ₹6,264 |
| 6.00 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 24 | NOS | 6,576 ₹6,576 | 6,552 ₹6,552 | 6,240 ₹6,240 |
| 7.00 | 11 KV CABLE TIES FOR PIN INSULATOR | 351 | NOS | 8,98,560 ₹9.0 L | 8,97,858 ₹9.0 L | 8,68,725 ₹8.7 L |
| 8.00 | 11 KV IPC FOR COVERED TO COVERED COND. | 81 | NOS | 1,26,846 ₹1.3 L | 1,26,684 ₹1.3 L | 1,21,500 ₹1.2 L |
| 9.00 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR | 118 | NOS | 2,00,010 ₹2.0 L | 1,99,538 ₹2.0 L | 1,95,762 ₹2.0 L |
| 10.00 | 11 KV MID SPAN JOINTING KIT | 54 | NOS | 1,41,642 ₹1.4 L | 1,41,534 ₹1.4 L | 1,38,942 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
10 Jun 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Replacement of old damaged weasel conductor of 11 KV Guptkashi Feeder by AAAC Covered Conductor 70mm2 on Semi-Turnkey Basis Under EDD Rudraprayag against Capital (SI) Head
2025_UPCL4_84207_1
10/EDC(K)/2025-26
Open Tender
Repair and Maintenance Works
180 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹11,800
EE EDD GOPESHWAR
₹2.3 L
27 Feb 2026
23 May 2025
11 Jun 2025
24 May 2025
10 Jun 2025
24 May 2025
SUPPLY OF MATERIAL PORTION
STAY CLAMP FOR SP-23 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
PP & CLAMP FOR SP-23 WITHOUT NUT & BOLT
BRACING CLAMP TOP FOR SP-23 WITH N/B
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
11 KV CABLE TIES FOR PIN INSULATOR
11 KV IPC FOR COVERED TO COVERED COND.
11 KV IPC FOR COVERED TO BARE CONDUCTOR
11 KV MID SPAN JOINTING KIT
IPC WITH AL. BAIL FOR EARTHING 11KV
11KV AAAC AL-59 , 70 SQ.MM COVERED COND
11 KV TENSION CLAMP WITH BAIL & IPC
LABOUR PORTION
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
DISMANTLING OF 11 KV LINE(WEASEL)
PAINTING OF SP-21/23 POLE
CARTAGE SP-21/23 POLE, 71-100 KM
CARTAGE OF PETTY MATERIAL,71-100 KM
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
BACK CARTAGE OF PETTY MATERIAL,150-200KM
FIXING OF IPC WITH AL. BAIL FOR EARTHING
FIXING OF 11KV 90KN TENSION CLAMP B&IPC
FIXING OF 11 KV IPC FOR CC TO BARE COND.
FIXING OF 11 KV MID SPAN JOINTING KIT
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
FIXING OF 11KV IPC FOR COVERED - COVERED
LAYING SPREADING,STRINGING AAAC CONDUCT.
11 KV CABLE TIES FOR PIN INSULATOR
CONST. OF PLINTH FOR 11 KV D/P STRUCTURE
DEVENDRA SINGH BHANDARI (BID ID -386369)
M/s S S ENTERPRISES (BID ID -385893)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid