Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
12 Jun 2026, 10:00 am6d left
EE HGD
O/o EE, HGD Ganga Sadan, Front of VIP Ghat, Haridwar
Construction of Boundary wall at J.E. office, Rudraprayag of ASD under HGD, Haridwar
2026_CWC_911467_1
HGD/2026-27/04
Open Tender
Civil Works
30 days
Rudraprayag
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE HGD Haridwar
₹10,000
O/o EE HGD
5 Jun 2026
5 Jun 2026
13 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
5 Jun 2026 - 6 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation:-Earth work in excavation by mechanical means (Hydraulic
Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for all Kinds of soil by the direction in Engineer - in - charge. | - | Cum | 100 | - |
| 2 | Centering and shuttering:-Centring and shuttering including strutting,propping etc. and removal of form work for Foundations, footings, bases of columns. | 1 | Sqm | 100 | ₹99.9 |
| 3 | PCC:- Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement: 4 fine sand 8 graded stone aggregate 40 mm nominal size). by the direction in Engineer in charge work to be execuated as per specification a rate of above given item | 1 | Cum | 10 | ₹9.99 |
| 4 | Concrete for RCC Beam:- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All workup to plinth level:1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | 10 | - |
| 5 | Steel RCC Beam:- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | - | Kg | 10 | - |
| 6 | Concrete for RCC Column:- Reinforced cement concrete work in walls (any
thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | 10 | ₹9.99 |
| 7 | Steel for RCC Column:- Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and binding all complete above plinth level | - | Kg | 10 | - |
| 8 | Brick wrok: Full Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level upto floor V level in all shapes & size in: Cement mortar 1:4 (1 cement: 4 coarse sand) | 1 | Cum | 10 | ₹9.99 |
| 9 | Cement plaster:- 12 mm cement plaster of mix: 1:6 (1 cement: 6 fine sand) on brick wall both side along chamfer and column. | 1 | Sqm | 10 | ₹9.99 |
| 10 | Painting:- Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr/10 sqm | - | Sqm | 10 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
NIT.pdf
Tender Documents • 1.26 MB
BOQ_957922.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid