Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.9 LAccepted-Finance | ₹56.9 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹60.9 L+₹4.0 L (6.96%)Accepted-Finance 112 AMBALA ROAD NARAINGARH AMBALA 134203 | NARAINGARH | AMBALA | HARYANA | 134203 | ₹60.9 L+₹4.0 L (6.96%) | L2 | Accepted-Finance Rate Higher than L1 |
| 3 | L3₹63.4 L+₹6.5 L (11.4%)Accepted-Finance | ₹63.4 L+₹6.5 L (11.4%) | L3 | Accepted-Finance Rate Higher than L1 |
| 4 | L4₹63.4 L+₹6.5 L (11.4%)Accepted-Finance WANIAWAD BHUJ KUTCH 370001 | BHUJ | KUTCH | GUJARAT | 370001 | ₹63.4 L+₹6.5 L (11.4%) | L4 | Accepted-Finance Rate Higher than L1 |
| 5 | Rejected-Technical GROUND FLOOR F 11 PHASE II MAYAPURI WEST DELHI DELHI 110064 | DELHI | WEST DELHI | DELHI | 110064 | - | - | Rejected-Technical Documents not submitted even after shortfall documents were asked |
| Sl No | Description | Qty | Unit | Keystone Constructionare L1 | M/s Bombay Novelty Stores L4 | J S Construction Company L2 | RL PAREEK AND SONS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | SCHEDULE 'A' PART-I (SITE DEVELOPMENT) Lump sum price worked by the contractor for "SITE DEVELOPMENT" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-I (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 54,000 ₹1,08,000 | 80,000 ₹1,60,000 | 42,000 ₹84,000 Lowest | 84,362 ₹1,68,724 |
| 2.00 | SCHEDULE 'A' PART-II (A) (BUILDING WORKS UNDER GROUND) Lump sum price worked by the contractor for "BUILDING WORKS UNDER GROUND" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-II (A) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | EACH BLOCK | 25,51,000 ₹51,02,000 Lowest | 28,00,000 ₹56,00,000 | 28,56,000 ₹57,12,000 | 27,92,339 ₹55,84,678 |
| 3.00 | SCHEDULE 'A' PART-III (INTERNAL ELECTRIFICATION) Lump sum price worked by the contractor for "INTERNAL ELECTRIFICATION" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-III (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 60,000 ₹1,20,000 | 1,10,000 ₹2,20,000 | 55,000 ₹1,10,000 Lowest | 1,13,397 ₹2,26,794 |
| 4.00 | SCHEDULE 'A' PART-IV (FURNITURE) Lump sum price worked by the contractor for "FURNITURE" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-IV (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 60,000 ₹1,20,000 | 45,000 ₹90,000 | 22,500 ₹45,000 Lowest | 44,200 ₹88,400 |
| 5.00 | SCHEDULE 'A' PART-VI (D) (FIRE FIGHTING) Lump sum price worked by the contractor for "FIRE FIGHTING" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-VI (D) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 40,000 ₹80,000 | 15,000 ₹30,000 | 7,500 ₹15,000 Lowest | 15,520 ₹31,040 |
| 6.00 | SCHEDULE 'A' PART-VI (E) (SUMMER APPLIANCES) Lump sum price worked by the contractor for "SUMMER APPLIANCES" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-VI (E) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 20,500 ₹41,000 | 30,000 ₹60,000 | 15,500 ₹31,000 Lowest | 30,265 ₹60,530 |
| 7.00 | SCHEDULE 'A' PART-VI (F) (LIGHTNING PROTECTION) Lump sum price worked by the contractor for "LIGHTNING PROTECTION" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-VI (F) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 60,000 ₹1,20,000 | 90,000 ₹1,80,000 | 45,000 ₹90,000 Lowest | 89,250 ₹1,78,500 |
Tender Value
₹66 L
EMD Value
₹1.2 L
Closing Date
8 Jul 2026, 6:00 pmClosed
OFFICER COMMANDING 425 (I) FIELD COMPANY
425 (I) FIELD COMPANY, PIN-913425, C/O 56 APO
CONSTRUCTION OF UNDER GROUND BCP (ARTY) (SUP AND CONSTR) AT OP AREA KUTCH GUJARAT (QTY- 02 NOS)
2026_ARMY_771072_1
0016/26-27
Open Tender
Civil Works
Lump-sum
150 days
OP AREA KUTCH GUJARAT
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Payable To S AND S IMPREST ACCOUNT 425 (I) FD COY
₹1.2 L
BHUJ
29 Aug 2026
10 Jun 2026
10 Jul 2026
10 Jun 2026
8 Jul 2026
1 Jul 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE 'A' PART-I (SITE DEVELOPMENT) Lump sum price worked by the contractor for "SITE DEVELOPMENT" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-I (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 86,972 | ₹1,73,944 |
| 2 | SCHEDULE 'A' PART-II (A) (BUILDING WORKS UNDER GROUND) Lump sum price worked by the contractor for "BUILDING WORKS UNDER GROUND" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-II (A) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | EACH BLOCK | 28,78,700 | ₹57,57,400 |
| 3 | SCHEDULE 'A' PART-III (INTERNAL ELECTRIFICATION) Lump sum price worked by the contractor for "INTERNAL ELECTRIFICATION" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-III (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 1,16,904 | ₹2,33,808 |
| 4 | SCHEDULE 'A' PART-IV (FURNITURE) Lump sum price worked by the contractor for "FURNITURE" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-IV (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 45,600 | ₹91,200 |
| 5 | SCHEDULE 'A' PART-VI (D) (FIRE FIGHTING) Lump sum price worked by the contractor for "FIRE FIGHTING" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-VI (D) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 16,000 | ₹32,000 |
| 6 | SCHEDULE 'A' PART-VI (E) (SUMMER APPLIANCES) Lump sum price worked by the contractor for "SUMMER APPLIANCES" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-VI (E) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 31,200 | ₹62,400 |
| 7 | SCHEDULE 'A' PART-VI (F) (LIGHTNING PROTECTION) Lump sum price worked by the contractor for "LIGHTNING PROTECTION" as calculated and estimated by the bidder as per technical specification, tender documents, Schedule 'A' Part-VI (F) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F | 2 | LUMP SUM | 92,000 | ₹1,84,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TS0016UGBCP.pdf
Tender Documents • 19.60 MB
BOQ_863484.xls
BOQ • 0.43 MB
Jobno0016Corrigendumno02UGBCP.pdf
PDF • 0.29 MB
0016UGBCPCorrigendumsign.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .