Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.5 CrAccepted-AOC | ₹5.5 Cr | L-1 | Accepted-AOC Being the lowest quoted Bidder |
| 2 | L-2₹14.7 Cr+₹9.2 Cr (167.4%)Rejected-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹14.7 Cr+₹9.2 Cr (167.4%) | L-2 | Rejected-Finance Not being lowest rate quoted Bidder |
Tender Value
₹9.5 Cr
Closing Date
25 Mar 2022, 11:00 amClosed
Chief Engineer Project Vijayak
HQ CE (P) Vijayak C/o 56 APO PIN 931721
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across SaserLa pass on Sasoma-Saserla-Brangsa Road, in the Union Territory of Ladakh
2021_BRO_497836_1
CE (P) Vijayak/17/2021-22
Open Tender
Consultancy Services
Item Rate
548 days
Across SaserLa pass on Sasoma-Saserla-Brangsa Road
As per Tender Documents and RFP. TECHNICAL EVALUATION WILL BE CARRIED OUT THROUGH INFRACON
9 documents required · 9 mandatory
₹0
Exempted
HQ CE (P) Vijayak Kargil
28 May 2022
29 Dec 2021
26 Mar 2022
29 Dec 2021
25 Mar 2022
4 Feb 2022
30 Dec 2021 - 13 Jan 2022
3 Feb 2022
Amount
Schedule A (Lump sum Fixed Cost)
Remuneration for Local/ Expatriate Staff (includingper diem allowance)
KEY PROFESSIONALS (Team Leader Cum Senior Tunnel Expert -1 no, Tunnel Design Expert -1 no, Senior Ventilation & Fire Safety Expert-1 no, Senior Geotechnical Engineer -1 no and Directional Coring Expert -1 no)
OTHER PROFESSIONALS (Senior E&M Engineer, Senior Geologist, Senior Surveyor Engineer (2 Nos.), Environmental Engineer, Material Engineer, Highway cum Pavement Engineer and Quantity Surveyor /Documentation Officer)
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment, Minimum 6 to be deployed) TBN
Support Staff (Fixed Rates) (Office Manager-1 Nos, Typist -2 Nos, Office Boy -2 Nos and Night Watchman -2 Nos)
Transportation (Fixed costs) The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs) The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Furniture and Equipment (Fixed costs)
Topographical Survey and Investigation : All investigations/ surveys including Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/ Studies.
Land Acquisition Team including support staff and logistics/ transportation : (Land acquisition Team including support staff, Ex-Land Revenue Inspector /Officer or equivalent, Ex-Kanoogo/ Girdwaror equivalent, Ex-Patwari or equivalent, Typist (2 Nos) & Peon)
Logistics for Land Acquisition Team (Logistics for Land acquisition Team, Computer including necessary peripherals (2Nos), Printers (2 Nos) & Vehicles )
Schedule B (Item Rate Cost)
Sub-soil Investigation & Other Works The rate includes transportation of all plant, manpower, drilling accessories, sampling equipment work site, erection on site for Coring (Soildrilling testing and rock coring), trial pit , hand auguring, reinstatement of borehole etc including grouting in zones of weakness
Vertical Boring in all type of soils (other than hard rock)
Vertical Boring in hard rock
Directional coring Inclined soil, artificial hard material or boulder drilling and directional coring in rock arterial hard material or boulder from the launch site at ground level to the commencement of the HDC trajectory. (Length reckoned from commencement of HDC trajectory) The rate includes transportation of all plant, manpower, drilling accessories, sampling equipment work site, erection on site for Horizontal Directional Coring (Soil drilling testing and rock coring), trial pit , hand auguring, reinstatement of borehole etc including grouting in zones of weakness
Not exceeding 100 m in length
Exceeding 100m in length but not exceeding 200m length in rock
Exceeding 200m in length but not exceeding 300m length in rock
Exceeding 300m in length but not exceeding 400m length in rock
Reports and Document
Monthly Report
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Cost of supply and fixing Boundary Pillars Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
RITES Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .