Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Finance 153 KHUSHIPURA STATE BANK TIRAHA MAIN MARKET ROAD GEETA CLOTH HOUSE RATH HAMIRPUR HAMIRPUR UTTAR PRADESH 210431 UDYAM UP 33 0004409 | HAMIRPUR | UTTAR PRADESH | 210431 | L1 | Admitted-Finance | |
| 2 | L2₹29.3 L+₹5.4 L (22.7%)Admitted-Finance ANGUL ODISHA 759147 UDYAM OD 01 0001580 | ANUGUL | ODISHA | 759147 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | INDIAN CONSTRUCTION L1 | P C JOSEPH ENGINEERING AND CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Overhauling of U#2 AHP Mechanical System | |||||
| 1.01 | BA Feed gate actuator cylinder
Dismantling cylinder seal kit checking if required replacement, gasket fitting and cylinder fitting if required cylinder replacement | 4 | Number | 36,176 ₹36,176 Lowest | 48,000 ₹48,000 |
| 1.02 | BA Feed gate allignment,
checking/ replacement of side guide angles, rollers, wedges including water leakage arrest from enclosure body, checking/replacement of enclosure and welding of joints inside enclosure | 4 | Number | 51,996 ₹51,996 Lowest | 60,000 ₹60,000 |
| 1.03 | BA Clinker grinder overhauling
(Dismantling of Crusher, checking/replacement of Shaft
Structure, Cam Segments, Wear Plates, Bearings, Sprocket etc) and/or replacement of complete assembly of Crusher | 4 | Number | 32,380 ₹32,380 Lowest | 36,000 ₹36,000 |
| 1.04 | BA Clinker Grinder gear box & fluid gear box to clinker grinder. Gearbox, Fluid Coupling replacement if necessary | 4 | Number | 31,304 ₹31,304 Lowest | 34,000 ₹34,000 |
| 1.05 | BA Jet Pulsion pumps overhauling
by dismantling the whole assembly & checking/replacement of
damaged parts like nozzle, combine tube, Tail pipe, nozzle insert and replacement of MS pipe after the jet pump up to KGV | 4 | Number | 25,300 ₹25,300 Lowest | 28,000 ₹28,000 |
| 1.06 | BA Hopper four side trough seal nozzle
checking, welding of nozzle pipe. Seal trough cleaning & water
flushing. Replacement of seal trough header pipe upto 30 Mtrs | 1 | LOT | 15,811 ₹15,811 Lowest | 17,500 ₹17,500 |
| 1.07 | Checking of BA area CI bend(45 °, 90°
bend & 45° lateral) after dismantling of both side coupling and if
required replacement | 6 | Number | 14,442 ₹14,442 Lowest | 15,600 ₹15,600 |
| 1.08 | BA Clinker grinder chute checking,
Repairing/replacement,welding and refitting | 4 | Number | 26,556 ₹26,556 Lowest | 30,000 ₹30,000 |
| 1.09 | BA hopper all wall jetting nozzles and emergency door jetting nozzles dismantling, cleaning and replacement if required | 1 | LOT | 23,716 ₹23,716 | 3,000 ₹3,000 Lowest |
Tender Value
₹24.6 L
EMD Value
₹49,163
Closing Date
18 Jun 2026, 3:00 pmClosed
The General Manager, SGTPP
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Service Contract for Overhauling of U#2 AHP Mechanical System under AHP-MM, Stg-1 at SgTPP.
2026_WBPDC_1023085_2
WBPDCL/SGTPP/NIT/E3962/25-26
Open Tender
Support/Maintenance Service
Lump-sum
35 days
SgTPP, WBPDCL
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance.
3 documents required · 3 mandatory
₹0
₹49,163
Yes
Contract Cell, SGTPP
27 Jul 2026
25 May 2026
20 Jun 2026
25 May 2026
18 Jun 2026
25 May 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Overhauling of U#2 AHP Mechanical System | |||||
| 1.01 | BA Feed gate actuator cylinder
Dismantling cylinder seal kit checking if required replacement, gasket fitting and cylinder fitting if required cylinder replacement | 4 | Number | 9,323.6 | ₹37,294.4 |
| 1.02 | BA Feed gate allignment,
checking/ replacement of side guide angles, rollers, wedges including water leakage arrest from enclosure body, checking/replacement of enclosure and welding of joints inside enclosure | 4 | Number | 13,400.6 | ₹53,602.4 |
| 1.03 | BA Clinker grinder overhauling
(Dismantling of Crusher, checking/replacement of Shaft
Structure, Cam Segments, Wear Plates, Bearings, Sprocket etc) and/or replacement of complete assembly of Crusher | 4 | Number | 8,345.4 | ₹33,381.6 |
| 1.04 | BA Clinker Grinder gear box & fluid gear box to clinker grinder. Gearbox, Fluid Coupling replacement if necessary | 4 | Number | 8,068.3 | ₹32,273.2 |
| 1.05 | BA Jet Pulsion pumps overhauling
by dismantling the whole assembly & checking/replacement of
damaged parts like nozzle, combine tube, Tail pipe, nozzle insert and replacement of MS pipe after the jet pump up to KGV | 4 | Number | 6,520.64 | ₹26,082.56 |
| 1.06 | BA Hopper four side trough seal nozzle
checking, welding of nozzle pipe. Seal trough cleaning & water
flushing. Replacement of seal trough header pipe upto 30 Mtrs | 1 | LOT | 16,299.9 | ₹16,299.9 |
| 1.07 | Checking of BA area CI bend(45 °, 90°
bend & 45° lateral) after dismantling of both side coupling and if
required replacement | 6 | Number | 2,481.2 | ₹14,887.2 |
| 1.08 | BA Clinker grinder chute checking,
Repairing/replacement,welding and refitting | 4 | Number | 6,844.8 | ₹27,379.2 |
| 1.09 | BA hopper all wall jetting nozzles and emergency door jetting nozzles dismantling, cleaning and replacement if required | 1 | LOT | 24,449.35 | ₹24,449.35 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TD.pdf
Tender Documents • 0.70 MB
BOQ_2516967.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .