Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 4 | Rejected-Technical 13 THAKKAR PLOT DEEPAK KUNJ PORBANDAR 360575 | PORBANDAR | GUJARAT | 360575 | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 5 | Rejected-Technical | Rejected-Technical TECHNICALLY DISQUALIFIED |
Tender Value
Refer Docs
Closing Date
6 Oct 2022, 10:00 amClosed
ASD(V)
NAVAL DOCKYARD VISAKHAPATNAM 530014
DEGUTTING, SHIFTING, CLEANING, PAINTING, REGUTTING AND TRIALS OF GT/GTG/RG COMPONENTS IN SHIP
2022_NAVY_552146_1
COM/OFF/GTR/22-23/377
Open Tender
Marine Services
Turn-key
495 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
NAVAL DOCKYARD VISAKHAPATNAM
28 Oct 2022
15 Sept 2022
7 Oct 2022
15 Sept 2022
6 Oct 2022
27 Sept 2022
15 Sept 2022 - 6 Oct 2022
22 Sept 2022
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.C-Covers of Main air intake of GT. (Length-3m, Weight-100kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.1st cooling air intake pipe of GT. (Dia-1200mm, Length-2.5m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.1st cooling air intake compensator of GT. (Dia-800mm, Length-1m, Weight-200kg)Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.2nd cooling air intake pipe of GT. (Dia-800mm, Length-4m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.2nd cooling air intake compensator of GT. (Dia-800mm, Length-1m, Weight-200kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.HI casing of Gas Collector of GT. (Length-3m, Weight-500Kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.End covers of Gas Collector of GT. (Length-1m, Weight-200kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Conical ring of Exhaust system of GT. (Dia-1500mm, Length-1.5m, Weight-500kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.1st exhaust system compensator of GT. (Dia-1400mm, Length-3.4m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.1st exhaust system pipe of GT. (Dia-1400mm, Length-5m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.2nd exhaust system compensator of GT. (Dia-1400mm, Length-3.4m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.2nd exhaust system pipe of GT. (Dia-1400mm, Length-6m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Lub oil system pipes of GT.(Dia-80mm, Length-1m, Weight-30kg)NA
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Fuel system pipes of GT. (Dia-60mm, Length-1m, Weight-20kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.De-icing system pipes of GT. (Dia-180mm, Length-3m, Weight-100kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Breather system pipes of GT. (Dia-180mm, Length-4m, Weight-150kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.HI casing set of GT. (Length-6m, Weight-1000kg
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Cordon shaft of GT. (Length-1.5m, 60Kgs)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Main air intake distance piece of GTG. (Length-1.5m, Weight-200kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.1st exhaust system compensator of GTG. (Dia-800mm, Length-5m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.1st exhaust system pipe of GTG. (Dia-800mm, Length-5m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.2nd exhaust system compensator of GTG. (Dia-800mm, Length-5m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.2nd exhaust system pipe of GTG. (Dia-800mm, Length-5m, Weight-300kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.HI casings of GTG. (Length-2m, Weight-100kgs)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.SV mounts of GTG, GT and RG. (No. of bolts in each mount-05, Size of bolt- 120mm, M24 X 1.5, Weight of mount-24kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Lub oil system pipes of GTG. (Dia-60mm, Length-2m, Weight-20kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Fuel system pipes of GTG. (Dia-60mm, Length-2m, Weight-20kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Drain system pipes of GTG. (Dia-40mm, Length-2m, Weight-05kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Steam system pipes of GTG. (Dia-100mm, Length-2m, Weight-050kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.AC pump of GTG. (Weight-200Kgs)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.DC pump of GTG. (Weight-200Kgs)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Lub oil system pipes of Main RG. (Dia-180mm, Length-2m, Weight-120kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.Air system pipes of Main RG. (Dia-10mm, Length-2m, Weight-05kg)
De-gutting (removal of studs/bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) of following components:-GT/GTG/RG Components.BMA pumps of Main Reduction Gear. (Weight-500kg)
Cleaning and painting of following components.C-Covers of Main air intake of GT, Qty-08
Cleaning and painting of following components.1st cooling air intake pipe of GT1st cooling air intake pipe of GT, Qty-04
Cleaning and painting of following components.1st cooling air intake compensator of GT, Qty-04
Cleaning and painting of following components.2nd cooling air intake pipe of GT, Qty-04
Cleaning and painting of following components.2nd cooling air intake compensator of GT, Qty-04
Cleaning and painting of following components.HI casing of Gas Collector of GT, Qty-08
Cleaning and painting of following components.End covers of Gas Collector of GT, Qty-08
Cleaning and painting of following components.Conical ring of Exhaust system of GT, Qty-04
Cleaning and painting of following components.1st exhaust system compensator of GT, Qty-04
Cleaning and painting of following components.1st exhaust system pipe of GT, Qty-04
Cleaning and painting of following components.2nd exhaust system compensator of GT, Qty-04
Cleaning and painting of following components.2nd exhaust system pipe of GT, Qty-04
Cleaning and painting of following components.Lub oil system pipes of GT, Qty-80
Cleaning and painting of following components.Fuel system pipes of GT, Qty-80
Cleaning and painting of following components.De-icing system pipes of GT, Qty-16
Cleaning and painting of following components.Breather system pipes of GT, Qty-16
Cleaning and painting of following components.HI casing set of GT, Qty-04
Cleaning and painting of following components.Cordon shaft of GT, Qty-04
Cleaning and painting of following components.Main air intake distance piece of GTG, Qty-04
Cleaning and painting of following components.1st exhaust system compensator of GTG, Qty-02
Cleaning and painting of following components.1st exhaust system pipe of GTG, Qty-02
Cleaning and painting of following components.2nd exhaust system compensator of GTG, Qty-02
Cleaning and painting of following components.2nd exhaust system pipe of GTG, Qty-02
Cleaning and painting of following components.HI casings of GTG, Qty-10
Cleaning and painting of following components.Lub oil system pipes of GTG, Qty-20
Cleaning and painting of following components.Fuel system pipes of GTG, Qty-20
Cleaning and painting of following components.Drain system pipes of GTG, Qty-12
Cleaning and painting of following components.Steam system pipes of GTG, Qty-04
Cleaning and painting of following components.AC pump of GTG, Qty-02
Cleaning and painting of following components.DC pump of GTG, Qty-02
Cleaning and painting of following components.Lub oil system pipes of Main RG, Qty-12
Cleaning and painting of following components.Air system pipes of Main RG, Qty-20
Cleaning and painting of following components.Z1 gear of Main RG, Qty-04
Cleaning and painting of following components.Z2 gear of Main RG, Qty-08
Cleaning and painting of following components.Z3 gear of Main RG, Qty-08
Cleaning and painting of following components.Z4 gear of Main RG, Qty-02
Cleaning and painting of following components.Z5 gear of Main RG, Qty-04
Cleaning and painting of following components.Resilient shaft of Main RG, Qty-16
Cleaning and painting of following components.Hydraulic coupling of Main RG, Qty-02
Cleaning and painting of following components.Side cover of Main RG, Qty-04
Cleaning and painting of following components.End cover of Main RG, Qty-04
Cleaning and painting of following components.Summation drive of Main RG, Qty-04
Cleaning and painting of following components.Shaft Turning drive of Main RG, Qty-02
Cleaning and painting of following components.Shaft locking device of Main RG, Qty-02
Cleaning and painting of following components.RG driven Lub Oil pump of Main RG, Qty-04
Cleaning and painting of following components.MBK assembly of Main RG, Qty-04
Cleaning and painting of following components.Jaw coupling of Main RG, Qty-16
Cleaning and painting of following components.Jaw coupling drums of Main RG, Qty-16NA
Cleaning and painting of following components.GTG Compressor blades, Qty-02sets
Cleaning and painting of following components.GTG Stator blades, Qty-02 sets
Cleaning and painting of following components.GTG Turbine blades, Qty-02 sets
Cleaning and painting of following components.GTG Intake branch pipe, Qty-02
Cleaning and painting of following components.GTG Exhaust branch pipe, Qty-02
Cleaning and painting of following components.GTG Discharge branch pipe, Qty-02
Cleaning and painting of following components.GTG Gas collector, Qty-02
Cleaning and painting of following components.GTG stator casing, Qty-02
Cleaning and painting of following components.GTG Turbine bearing housing, Qty-02
ULTRA MARINE
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .