Tender Value
₹20.5 L
EMD Value
₹20,500
Closing Date
7 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer Mandvi Nagarpalika, Mandvi
CONSTRUCTION OF COMPOUND WALL AROUND SALAYA GROUND AT MANDVI NAGARPALIKA, MANDVI-KACHCHH UNDER SJMMSVY(UDP-88)/2025-26 (THIRD ATTEMPT)
290293
2025-26
Open
Civil Works
Kutch
2 documents required · 2 mandatory
₹1,062
Yes
chief officer mandvi nagarpalika
₹20,500
Yes
27 Mar 2026
27 Mar 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
NAME OF WORK :-CONSTRUCTION OF COMPOUND WALL AROUND SALAYA GROUND AT MANDVI
NAGARPALIKA.,MANDVI-KACHCHH UNDER SJMMSVY(UDP-88)/2025-26
Quantities Tendered Rate
It.. No. Item of work Unit according to
may be more or Rate in Figure
estimated quantities
Item No.1 Clearing and grubbing road land including uprooting rank vegetation grass
bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut earlier
and disposal of unserviceable materials(A) By manual means in area of light jungle
Item No.2 Excavation for foundation upto 1.5 m depth including sorting out and stacking
of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or
2 64.30 soft soil 122.93 CMT
Item No.3 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6-
hand broken stone aggregates 40 mmnominal size) and curing complete excluding cost of
3 13.83 formwork in (A) Foundation and Plinth 3095.24 CMT
Item No.4 Filling in foundation and plinth with murrum or selected soil in layers of
4 33.09 20cm. thickness including watering, ramming and consolidating etc. complete. 269.75 CMT
Item No.5 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. Height of propping and
5 40.71 centering below supporting floor to ceiling not exceeding 4 M. and removal of the same 171.80 SMT
for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings
Bases of Columns etc. and Mass concrete.
Item No.6 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
6 174.54 centering below supporting floor to ceiling not exceeding 4 M. and removal of the same 300.65 SMT
for in situ reinforced concrete and plain concrete work in. (G) Columns PillarsPosts and
struts. (1) Square Rectangular Polygonal in plan.
Item No.7 Providing TMT Bar FE 500D reinforcement for R.C.C. work including
7 9768.00 bending, binding and placing in position complete upto floor two level 77.28 KG
Item No.8 Providing and laying controlled cement concrete M.200 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass concrete
Item No.9 Providing and laying controlled cement concrete M.200 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in (D)
9 13.09 Columns, Pillars posts and struts upto floor two level. 4682.30 CMT
Item No.10 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of the same
10 130.19 for in situ reinforced concrete and plain concrete work in. (H) (1) Sides and soffits of 205.45 SMT
Beams Beam Haunchings cantilevers Girders Bressumers and Lintels not exceeding 1 M.
Item No.11 Providing and laying controlled cement concrete M.200 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in (C)
11 15.32 Slabs,landing,shelves,Balconies Lintels, Beams, Girders and Cantilever upto floor 4576.90 CMT
Item No.12 Precast concrete block masonry (including quoin blocks jamb blocks closer
etc.) with solid concrete blocks of approved size made of cement concrete 1:3:6 mix (1-
Cement : 3 coarse sand: 6- graded stone aggregates of 20 mm and down grade) in
12 50.19 superstructue above plinth upto floor two level cement morter 1:6 4053.68 SMT
Item No.13 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6-
crushed stone aggregates 20 mm nominal size) and curing complete including cost of
formwork in (A) Wall Caps / Coping
Item No.14 Providing 20mm thick cement plaster in single coat on single or half brick
walls for interior plastering upto floor two level and finished even and smooth in (i)
14 539.28 Cement mortar 1:3 (1-cement:3-sand) 230.50 SMT
Item No.15 Finishing wall with water proofing paint of on wall surfaces (Two coats) to
give an approved brand and manufacture and of required shape even shade after
15 539.28 thoroughly brushing the surface to remove all dirt and remains of loose powered materials 60.80 SMT
Item No.16 Structural steel work ( Confirming to IS 4923-1997) riveted, bolted or
welded in builtup for all type sections, in framed work, including cutting, hoisting, fixing
16 3829.58 in position and applying a priming coat of approved steel primer all complete as per the 131.82 Kg
structural designs and directions of Engineer in charge.).
Item No.17 Steel work, riveted in built up ections framed work including cutting,
hoisting, fixing in position and applying a priming coat of red lead paint. (A) In beams
and joists, channels angles Tees, flats, with connecting plates or angle cleats as in main
and cross beams. Hip and jack rafters, purlins conneted to common rafters and the like.
Item No.18 Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron
J or L Hooks, Bolts and nuts 8mm diameter with bitumen and G.I. limpet washer or G.I.
18 55.55 limpet washer. filled with white lead complete excluding the cost of purlins, Rafters and 734.18 SMT
Trusses.(1) 0.80 mm thick heet.
GST WILL BE PAID EXTRA AS PER TENDER CONDITION
I/We am/are willing to carry out the work @............... % above/below ( Percent should be written in figures and
words ) The tendered amount mentioned above amount of my /our tender works out as under
Tendered amount Rs……………………….. Tendered amount Rs………………………..
Add ……...% above Rs…………………. Deduct ……...% Below Rs………………….
(Please strike out which ever is not applicable )
1 All work shall be carried out as per public works department handbook and other specifications of division or as directed.
2 Rates quoted inclusive of clearance of sight (prior to commencement of work and at its close) in all respect
and hold good for work under all conditions , sight, moisture, weather etc
3 one percent labor cess will be deducted from the valued work done as per ' Bulding and other construction
work welfare cess act' G.R. No. GHR - 2005/04/CWA/2004/841/M-3 Dt. 31/01/2005
Signature of the Contractor.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.TITEL PAGE.pdf
2.N PROCURE.pdf
4.GENRAL NOTS AND CONDITION.pdf
5.SCHEDULE-B.pdf
3.FORM B1.pdf
6.COMMAN AND ITEM WISE SPECIFICATION.pdf
7.COMMAN SPECIFICATION.pdf
8.drawing 1.pdf
9.drawing 2.pdf
Download all tender documents and submit your bid