| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 CrAccepted-AOC | ₹20.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹21.5 CrRejected-AOC | ₹21.5 Cr | L2 | Rejected-AOC L2 bidder |
| 3 | L3₹22.3 CrRejected-AOC | ₹22.3 Cr | L3 | Rejected-AOC L3 bidder |
| 4 | L4₹22.4 CrRejected-AOC | ₹22.4 Cr | L4 | Rejected-AOC L4 bidder |
| 5 | L5₹22.9 CrRejected-AOC | ₹22.9 Cr | L5 | Rejected-AOC L5 bidder |
Tender Value
₹21.6 Cr
EMD Value
₹5 L
Closing Date
14 Mar 2023, 5:00 pmClosed
CEO Technopark
Park Centre building, Technopark Phase 1 campus
CONSTRUCTION OF COMMERCIAL BUILDING IN TECHNOPARK PHASE I CAMPUS, TRIVANDRUM
2023_ETPK_554233_1
ETPK/PH1/162/2022-23
Open Tender
Civil Works - Buildings
270 days
Technopark Phase 1 campus Trivandrum
As mentioned in Bid1 page number 4
6 documents required · 6 mandatory
₹17,700
₹5 L
Park Centre building, Technopark Phase 1 campus
14 Jul 2023
31 Jan 2023
15 Mar 2023
31 Jan 2023
14 Mar 2023
14 Feb 2023
14 Feb 2023
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 250 m outside the periphery of the area cleared and leveling the ground for setouting etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material outside Technopark. Beyound 30 cm girth up to and including 60 cm girth The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material outside Technopark. Beyound 60 cm girth up to and including 120 cm girth The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material outside Technopark. Beyond 120 cm girth up to and including 240 cm girth The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth) For foundation, pile cap, plinth beam etc. including getting out and disposal of excavated earth lead upto 250 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides & inside of foundations etc. (after confermed by the engineer in charge) in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to1 Km and lift upto 1.5 m. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides & inside of foundations and open areas etc. (after confermed by the engineer in charge) in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, and achive required compaction as per IS specification, lead up to 1km and lift up to 1.5 m The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 50 tonne and upto 100 tonne capacity Initial test .The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 50 tonne and upto 100 tonne capacity Routine test.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete. The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading / unloading at the work space etc complete as per the direction of engineer in chrge.
Diluting and injecting chemical emulsion for POST -CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion): Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement : 2 coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 ofspecified diameter and length below pile cap, to carry a safe working load not less than specified,excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall bemeasured up to bottom of pile cap).Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used. 600 mm dia piles The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete works for pile cap, grade beam, side drain and All work upto plinth level., using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete works of Lintel, Beam, Column, Slab, Cantiliver slab, Cantiliver Beam, Stair & Lift wall etc. complete. using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. All work above plinth level upto floor V level The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Reinforced cement concrete work in vertical and horizontal fins individually or forming box louvers, facias and eaves boards up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:11/2:3 (1 cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size).The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Supplying and fixing RCC precast slab in 1:2:4 (including steel reinforcement) - 96X48X10cm or nearest as per site condetion and direction of enginner in charge. for coverslab of drain. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Cleaning repairing and re-routing the existing drain including removal of waste material inside the drain with minimum lead of 500 meters from the periphery of work site. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights upto roof top, complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases for columns, pile cap and grade beam etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, bressumers (not including grade beams). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: stairs, (excluding landings ) except spiral - staircases. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Suspended floors, roofs, landings, beams, Cantiliver beam, Cantiliver slab, balconies, access platform and its side etc complete. The rate inclusive of all material charge, labour, transportation, Shoring, Scaffolding (If need) loading/unloading at the work space etc for all heights, complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights complete as per the direction of engineer in charge.
Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part 1 of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Hollow block masonry using pre cast blocks (factory made) of size 40x20x10cm or nearest available size confirming to IS 2185 part I of 1979 for Super structure up to floor two level for 10 cm thick wall in: CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding etc complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Plastering with cement mortar 1:6(1 cement & 6 sand) 12mm thick one coat floated hard and trowelled smooth for inside and outside walls including cost and conveyance of all materials to site, labour charges, hire charges for scaffolding, watering for curing, etc. complete for all floors for all heights as per the direction of engineer in charge. The rate inclusive of all material charge and fixing of wire mesh( as approved from Technopark) wherever necessary( column wall joints, beam wall joints) labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Plastering with cement mortar 1:4(1 cement & 4 sand) 12mm thick one coat floated hard and trowelled smooth for under side of slab, Cantiliver slab, beam, cantiliver beam etc. including cost and conveyance of all materials to site, labour charges, hire charges for scaffolding, watering for curing, etc. complete for all floors for all heights as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete including scaffolding for all heights. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour. Two coats The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) for floors with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with epoxy joint filler, by using a spacer of minimum of 3mm thick, complete. Size of Tile 600 x 600 mm. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights upto roof top, complete as per the direction of engineer in charge.
Providing and laying vitrified tiles in different sizes (thickness to be specified by the manufacturer) for walls with water absorption less than 0.08% and conforming to IS : 15622, in all colours,shades except burgundy, bottle green, black of any size as approved by Engineerin-Charge,in skirting, risers of steps and dados, over 12 mm thick bed of cementmortar 1:3 (1 cement : 3 coarse sand) and including PVC corners for all projected corners and door sides and applying of epoxy joint filler, by using a spacer of minimum of 3mm thick etc. complete. Size of Tile 600 x 600 mm.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights upto roof top, complete as per the direction of engineer in charge.
Providing and laying water proofing treatment in sunken portion of WCs, bathroom, bottom and top of shade and duct, etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights complete as per the direction of engineer in charge.
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing of expansion joint system related with floor location as perdrawings and direction of Engineer-In-Charge. The joints system will be of extrudedaluminum base members, self aligning / self centering arrangement and supportplates etc. as per ASTM B221-02. The system shall be such that it provides floor tofloor /floor to wall expansion control system for various vertical localtion in loadapplication areas that accommodates multi directional seismic movement withoutstress to it's components. System shall consist of metal profiles with a universalaluminum base member designed to accommodate various project conditions andfinish floor treatments. The cover plate shall be designed of width and thicknessrequired to satisfy projects movement and loading requirements and secured tobase members by utilizing manufacturer?s pre-engineered self-centeringarrangement that freely rotates / moves in all directions. The Self ? centeringarrangement shall exhibit circular sphere ends that lock and slide inside thecorresponding aluminum extrusion cavity to allow freedom of movement andflexure in all directions including vertical displacement. Provision of Moisture BarrierMembrane in the Joint System to have watertight joint is mandatory requirementall as per the manufactures design and as approved by Engineer -in-Charge .(Material shall confirm to ASTM 6063). Floor Joint of 100 mm gap. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Providing and fixing of expansion joint system related with wall joint (internal/external) location as per drawings and direction of Engineer-In-Charge. Thejoints shall be of extruded aluminum base members, self aligning / centeringarrangement and support plates as per ASTM B221-02. The material shall besuch that it provides an Expansion Joints System suitable for vertical wall towall/ wall to corner application, both new and existing construction in officeBuildings & complexes with no slipping down tendency amongst thecomponents of the Joint System. The Joint System shall utilize light weightaluminum profiles exhibiting minimal exposed aluminum surfaces mechanicallysnap locking the multicellular to facilitate movement. (Material shall confirmto ASTM 6063). Wall Joint of 100 mm gap. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Providing and fixing of expansion joint system of approved make and manufacturesfor various roof locations as per approved drawings and direction of Engineer-In-Charge. The joints shall be of extruded aluminum base members with, self aligningand self centering arragement support plates asper ASTM B221-02. The systemshall be such that it provides watertight roof to roof/roof to corner joint coverexpansion control system that is capable of accommodating multidirectionalseismic movement without stress to its components. System shall consist of metalprofile that incorporates a universal aluminum base member designed toaccommodate various project conditions and roof treatments. The cover plate shallbe designed of width and thickness required to satisfy movement and loadingrequirements and secured to base members by utilizing manufacturer?s preengineeredself-centering arrangement that freely rotates / moves in all directions.The Self centering arrangement shall exhibit circular sphere ends that lock andslide inside the corresponding aluminum extrusion cavity to allow freedom ofmovement and flexure in all directions including vertical displacement. The JointSystem shall resists damage or deterioration from the impact of falling ice, exposureto UV, airborne contaminants and occasional foot traffic from maintenancepersonnel. Provision of Moisture Barrier Membrane in the Joint System to havewater tight joint is mandatory requirement. Material shall confirm to ASTM 6063. Roof Joint of 100 mm gap. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights complete as per the direction of engineer in charge.
Providing and fixing in position Stainless steel Grade 304 Plate 1.0 mm thick as per design for expansion joints. 200 mm wide The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Laying the terrace floor for water runoff slopes with cement concrete 1:2:4 (1 cement, 2 sand and 4 broken stones) with 6mm broken stones for an average thickness of 60mm after cleaning the surface with wire brush and washing the floor neatly with water, laying the concrete in thin layer and compacting to correct slopes and even levels and plastering the top surface with cement mortar 1:3, 9mm thick one coat floated hard and trowlled smooth to a neat smooth surface with slope for water runoff watering for curing etc. including cost and conveyance of all materials, labour charges etc complete for all floors as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Fabricating and erecting hand rails with polished stainless steel (SS 304) for lobby area, staircases for all shapes and size in all floors with vertical members and horizontal members as detailed in the drawing including extra charges for welding all the joints properly , with contour cut of the SS tubes, including fixing the vertical legs in masonry or concrete and fixing the rail to correct plumb and line etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Providing and fixing 12 mm thick frameless toughened glass door shutter of approved brand and manufacture, including providing and fixing top & bottom pivot & spring type fixing arrangement and making necessary holes etc. for fixing required door fittings, all complete as per direction of Engineer-in-charge ( Door handle, lock and stopper etc to be paid separately) The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Providing and fixing premium quality dorma top pivot with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights complete as per the direction of engineer in charge.
Providing and fixing premium quality dorma bottom door patch with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing premium quality dorma top door patch with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing premium quality dorma center lock for door with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Providing and fixing premium quality dorma center lock cover for door with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Providing and fixing premium quality dorma floor spring BTS 75 for glass door with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Providing and fixing premium quality dorma 300mm C -handil for door with necessary accessories and screws etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape ( colour and tile pattern approved by Technopark ), laid in required colour and pattern over and including 50 mm thick compacted bed of 6mm chips, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate hollow sections of 2mm thick and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portion Powder coated aluminium (minimum thickness of powder coating 50 micron). The contractor shall submit shop drawings for approval from Technopark, before procuring the material. colour and design as approved by Technopark. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate hollow swctions of 2mm thick sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thickness of powder coating 50 micron). The colour and design as approved by Technopark. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS : 12823 Grade I Type II, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of Engineer - in- Charge. Pre- laminated particle board with decorative lamination on both sides. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item): With float glass panes of 6.0 mm thickness. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing 100 mm brass locks ( best make of approved quality ) for aluminium doors including necessary cutting and making good etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing aluminium round shape handle of outer dia 100 mm with SS screws etc. complete as per direction of Engineer-in-Charge. Anodized/ powder coated (AC 15 ) aluminium. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing aluminium tower bolts, ISI marked, anodised(anodic coating not less than grade AC 10 as per : 1868), transparent or dyed to required colour or shade, with necessary screws complete: 250x10 mm. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space etc complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing frosted type or other design film or Sun control film for various window / door glasses as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.20 mm M.S. laths with 1.20 mm thick top cover The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing tiled false ceiling of approved materials of size 595 x 595 mm in true horizontal level, suspended on inter locking metal grid of hot dipped galvanized steel sections (galvanized @ 120 grams per sqm, both side inclusive) consisting of main "T" runner with suitably spaced joints to get required length and of size 24x38 mm made from 0.30 mm thick (minimum) sheet, spaced at 1200mm center to center and cross "T" of size 24x25 mm made of 0.30 mm thick (minimum) sheet, 1200 mm long spaced between main "T" at 600 mm center to center to form a grid of 1200x600 mm and secondary cross "T" of length 600 mm and size 24x25 mm made of 0.30 mm thick (minimum) sheet to be interlocked at middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of size 24x24x0.3 mm and laying false ceiling tiles of approved texture in the grid including, required cutting/making, opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc. Main "T" runners to be suspended from ceiling using GI slotted cleats of size 27 x 37 x 25 x 1.6 mm fixed to ceiling with 12.5mm dia and 50 mm long dash fasteners, 4 mm GI adjustable rods with galvanised butterfly level clips of size 85x 30x 0.8 mm spaced at 1200 mm center to center along main T, bottom exposed width of 24 mm of all T-sections shall be pre-painted with polyester paint, all complete for all heights as per specifications, drawings and as directed by Engineer -in-charge. 12.5 mm thick fully Perforated Gypsum Board tile made from plaster board having glass fibre conforming to IS: 2095 Part I, of size 595x595 mm, having perforation of 9.7x9.7 mm at 19.4 mm c/c with centre borders of 48 mm and the side borders of 30 mm, backed with non woven tissue on the back side , having as NRC ( Noise Reduction Co efficient) of 0.79, with 50 mm resin bonded glass wool backing. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/ sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37 mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50 mm long with 6 mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25 mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5x25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with: 12.5 mm thick tapered edge gypsum plain board conforming to IS : 2095-Part 1 The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Gyp board Monolithic Ceiling:- Providing and fixing suspended false ceiling for all floors/ all heights which includes providing and fixing G.I. perimeter channels of size 27mm, 0.50 mm thick having one flange of 20mm and another flange of 30mm along the perimeter of the ceiling, with monolithic finish using 12.5mm thick Gypboard, screw fixed to the brickwall/partition with the help of plugs and screws. Then suspending G.I. intermediate channel of size 45mm, 0.8mm thick with two flanges of 15mm each from the soffit at 1200mm centres with steel G.I. hanger /G.I. ceiling angle fixed to the soffit with G.I. cleat and steel anchor fasteners of 8mm dia to take SWL of not less than 200kg. The ceiling section of 80mm x26mm x 0.50mm fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 600 mm centre. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Designing, fabricating, testing, installing and fixing in position Curtain Wall withAluminium Composite Panel Cladding, with open grooves for linear as well ascurvilinear portions of the building , for all heights and all levels etc. including:a) Structural analysis & design and preparation of shop drawings for pressureequalisation or rain screen principle as required, proper drainage of water to makeit watertight including checking of all the structural and functional design.b) Providing, fabricating and supplying and fixing panels of aluminium compositepanel cladding in pan shape in metalic colour of approved shades made out of4mm thick aluminium composite panel material consisting of 3mm thick FR grademineral core sandwiched between two Alumini um sheets (each0.5mm thick). Thealuminium composite panel cladding sheet shall be coil coated, with Kynar500based PVDF / Lumiflon based fluoropolymer resin coating of approved colourand shade on face # 1 and polymer (Service) coating on face # 2 as specified usingstainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backerrods etc.c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanisedwith serrations and serrated washers to arrest the wind load movement, fasteners,SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators toprevent bi-metallic contacts all complete required to perform as per specificationand drawing The item includes cost of all material & labour component, the cost ofall mock ups at site, cost of all samples of the individual components for testing inan approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wallwith aluminium composite panel cladding till the handing over of the building foroccupation. Base frame work for ACP cladding is payable under the relevantaluminium item.s The Contractor shall provide curtain wall with aluminiumcomposite panel cladding, having all the performance characteristics all complete, as per the Architectural drawings, as per item description, as specified, as per theapproved shop drawings and as directed by the Engineer-in-Charge.However, for the purpose of payment, only the actual area on the external face ofthe curtain wall with Aluminum Composite Panel Cladding (including width ofgroove) shall be measured in sqm. up to two decimal places.
Providing and fixing frame work for curtain wall lining etc. made of 50x50x2.0 mm hollow GI tube, placed along the walls, ceiling and floor in a grid pattern with spacing @ 60 cm centre to centre both ways (vertically & horizontally) or at required spacing near opening, with necessary welding at junctions and fixing the frame to wall/ceiling/floors with steel dash fasteners of 8 mm dia, 75 mm long bolt, including making provision for opening for doors, windows, electrical conduits, switch boards etc., including Vertical post of 100 X 100 X 2mm with 4 meter spacing & Horizontal connection members of 100 X 100 X 2mm of four layer. providing with two coats of approved steel primer & two coats of approved paints etc. complete, all as per direction of Engineer-in- charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and applying fiber-reinforced elastomeric liquid waterproofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of the concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming ofelastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and twocoats of undiluted elastomeric waterproofing liquid (dry film thickness of completeapplication/system not less than 500 microns). The operation shall be carried outafter scrapping and properly cleaning the surface to remove loose particles withwire brushes, complete in all respect as per the direction of Engineer-in-Charge.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights upto roof top, complete as per the direction of engineer in charge.
Providing and laying APP (Atactic Polypropylene Polymer) modifiedprefabricated five layer, 3 mm thick water proofing membrane, black finishedreinforced with glass fibre matt consisting of a coat of bitumen primer forbitumen membrane @ 0.40 litre/sqm by the same membrane manufactured ofdensity at 25 degreee, 0.87 - 0.89 kg/litre and viscocity 70 - 160 cps. Over the primercoat the layer of membrane shall be laid using butane torch and sealing alljoints etc., and preparing the surface complete. The vital physical and chemicalparameters of the membrane shall be as under : Joint strength in longitudinaldegree and transverse direction at 23degree as 350/300 N/5 cm. Tear strength in longitudinaland transverse direction as 60/80N. Softening point of membrane not less than150degree. Cold flexibility shall be upto -2 degree when tested in accordance with ASTM,D - 5147. The laying of membrane shall be got done through the authorisedapplicator of the manufacturer of membrane : 3 mm thick. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Area of slab over 0.50 sqm. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance 1 mm), with wall thickness 2.0mm ( 0.2 mm), corners of the door frame to be jointed with galvanized brackets and stainless steel screws, joints mitred and plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 x 19 mm and 1 mm ( 0.1 mm) wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturer's specification and direction of Engineer-in-charge Extruded section profile size 42x50 mm The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing to existing door frames 30 mm thick factory made Polyvinyl Chloride (PVC) door shutter made of styles and rails of a uPVC hollow section of size 60x30 mm and wall thickness 2 mm ( 0.2 mm), with inbuilt decorative moulding edging on one side. The styles and rails mitred and joint at the corners by means of M.S. galvanised/plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 25x20 mm and 1 mm ( 0.1 mm) wall thickness. The lock rail made up of 'H' section, a uPVC hollow section of size 100x30 mm and 2 mm ( 0.2 mm) wall thickness fixed to the shutter styles by means of plastic/galvanised M.S. 'U' cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm ( 0.1 mm) wall thickness. The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer's specification and direction of Engineer-in-charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm pipe 6kgf/cm2 The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etcThe rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.. complete as per the direction of engineer in charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 6 Kgf/cm2 The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 32 mm pipe 6Kgf/cm2 The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 25 mm pipe 10kgf /cm2 The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.complete as per the direction of engineer in charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing brass stop cock of approved quality : 20 mm nominal bore The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes including jointing with PVC solvent cement 110x110x110 mm dia Tee The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC moulded fittings / accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110 mm dia 45 degree Elbow The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75x75x75 mm dia Tee The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC moulded fittings / accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75 mm dia Door Elbow The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110x75 mm dia Reducer The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 150 mm dia floor trap The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I. clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required: One urinal basin with 5 litre white P.V.C. automatic flushing cistern The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights,complete as per the direction of engineer in charge.
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Flat back wash basin size 550x400mm with single 15 mm C.P.brasspillar taps The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing P.V.C. waste pipe for sink or wash basin including PVC.waste fittings complete. Flexible pipe 32 mm dia The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing water closet squatting pan (Indian type W.C. pan) with 100 mm Sand Cast Iron P or S trap, 10 litter low level white P.V.C.flushing cistern, including flush pipe, manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever require: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms. 15 mm nominal bore The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Supplying and fixing CP Health faucet good quality including cost of materials and labour charges etc. complete as per the direction of site engineer-in-charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS: 8931 15 mm nominal bore The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Providing and fixing toilet paper holder: C.P. brass The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Supplying and fixing in position plain plate glass mirror 6mm thick of appropriate sizes as per requirement and fixing with allied materials as per the direction of engineer in charge. for all floors. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space etc for all heights complete as per the direction of engineer in charge.
PTMT Liquid Soap Container of 400 ml capacity The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
PTMT Soap Dish/Holder 138x102x75 mm The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. for all heights, complete as per the direction of engineer in charge.
Cloth hanger The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Making the opening in brick masonry including dismantling in floor or walls by cutting masonry and making good the damages to walls, flooring and jambs complete, to match existing surface i/c disposal of mulba / rubbish to the nearest municipal dumping ground.For door / window / clerestory window/cutout. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
Supplying and fixing Thermo drain (FRP) manhole cover of size 600X450mm of 15MT load capacity manhole cover with fraime.The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc.for all heights, complete as per the direction of engineer in charge.
HEATHER CONSTRUCTIONS
B Murugan
Silpa Projects and Infrastructure India Pvt Ltd
South Indian Constructions Private Limited
Hill Track Constructions Pvt.Ltd.
VELLAPALLY BROTHERS
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid