Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.0 LAdmitted-Finance JEEVAN LOK COMPLEX JEEVAN LOK COMPLEX MAIN ROAD HINOO HINOO RANCHI JHARKHAND 834002 | RANCHI | JHARKHAND | 834002 | L1 | Admitted-Finance | |
| 2 | L2₹1.1 Cr+₹47.8 L (78.3%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Non-Responsive As per Clasue-5.2 | |
| 4 | Rejected-Technical | - | Rejected-Technical Non-Responsive As per Clasue-5.2 |
| Sl No | Description | Qty | Unit | CUBE ENGITECH CONSULTANT PVT LTD L1 | Bloom Companies LLC L2 |
|---|---|---|---|---|---|
| 10.00 | Local Consultants
Remuneration for Local Professional Staff
(inclusive of per diem allowance) | 1 | Nos | 7,54,000 ₹7,54,000 Lowest | 22,40,000 ₹22,40,000 |
| 20.00 | Support Staff (inclusive of per diem allowance) | 1 | Nos | 2,70,000 ₹2,70,000 Lowest | 4,50,000 ₹4,50,000 |
| 30.00 | Transportation | 1 | Nos | 1,00,000 ₹1,00,000 Lowest | 3,00,000 ₹3,00,000 |
| 40.00 | Duty Travel to Site | 1 | Nos | 80,000 ₹80,000 Lowest | 2,80,000 ₹2,80,000 |
| 50.00 | Office Rent | 1 | Nos | 4,80,000 ₹4,80,000 Lowest | - |
| 60.00 | Office Supplies, Utilities and Communication | 1 | Nos | 96,000 ₹96,000 Lowest | - |
| 70.00 | Office Furniture and Equipment (Rental) | 1 | Nos | 80,000 ₹80,000 | 20,000 ₹20,000 Lowest |
| 80.00 | Reports and Document Printing | 1 | Nos | 2,32,000 ₹2,32,000 | 1,78,000 ₹1,78,000 Lowest |
| 90.00Surveys & Investigations | |||||
| 90.10 | Topographical Survey | 1 | Nos | 60,000 ₹60,000 Lowest | 1,30,000 ₹1,30,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
20 Oct 2021, 3:00 pmClosed
Executive Engineer NH Division Dhanbad
Executive Engineer NH Division Dhanbad
Consultancy Services for DPR Preparation on EPC mode for Construction of RoB at Railway level crossing in Km 37.80 of NH 218 near Manpur in the State of Jharkhand including Land Acquisition and Utility Shifting
2021_CECOM_52195_1
NH/Dhanbad/07/2021-22 (3rd Call)
Open Tender
Consultancy
Works
300 days
Dhanbad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer NH Division Dhanbad
₹1 L
CE NH Wing Jharkhand Ranchi
8 Nov 2021
1 Oct 2021
22 Oct 2021
1 Oct 2021
20 Oct 2021
1 Oct 2021
8 Oct 2021
Amount
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixining boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Total Cost net of GST:
Total Cost ( Including GST)
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed Topographic surveys using mobile /aerial LiDAR or betterTechnology.
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring)
a) Boring in all type of soils (other than hard rock) ,1500m(for project of length <110km ) or 2000m( for project of length >110 km ) ,Qty. in m.
b)Boring in hard rock ,200m(for project of length <110km ) or 300m( for project of length >110 km ) ,Qty. in m.
Sub Total
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and Fixing boundary pillars and its installation , complete in all respect as per IRC:25,1967:Whereve the proposed alignment follows the exissting alignment, the boundary pillars shall be fixed at an interaval of 200m on either side of proposed right of way. Wherever there is a proposal of realignment of the existing Highway and/or construction of new bypass, consutant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval (lumsum)
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer/equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Description of Work / Item(s)
Amount
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Description of Work / Item(s)
Amount
Lumsum
Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Amount
Airlines
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Amount
Miscellaneous expenses
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment)
STAFF 1
STAFF 2
STAFF 3
STAFF 4
STAFF 5
STAFF 6
STAFF 7
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants & Govt Officials
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The rent cost includes maintenance, Cleaning, repairs, etc.
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Computer Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
Bloom Companies LLC
Bloom Companies LLC
Bloom Companies LLC
Bloom Companies LLC
Bloom Companies LLC
Bloom Companies LLC
Bloom Companies LLC
CUBE ENGITECH CONSULTANT PVT LTD
Bloom Companies LLC
Bloom Companies LLC
Bloom Companies LLC
Bloom Companies LLC
CUBE ENGITECH CONSULTANT PVT LTD
CUBE ENGITECH CONSULTANT PVT LTD
CUBE ENGITECH CONSULTANT PVT LTD
CUBE ENGITECH CONSULTANT PVT LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .