Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 2 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical TECHNICALLY NOT QUALIFIED |
Tender Value
Refer Docs
Closing Date
1 Apr 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
NR OF OILER POSHAK O/L-21/A
2021_NAVY_429340_1
COM/0316/POS/NR O/L-21/A
Open Tender
Marine Services
Turn-key
150 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY CONFERENCE HALL
28 May 2021
9 Mar 2021
2 Apr 2021
9 Mar 2021
1 Apr 2021
10 Mar 2021
10 Mar 2021 - 1 Apr 2021
17 Mar 2021
240 days
001 HULL SOW - POSHAK(NR21) Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway). Note :- Last Undock -oct 18
002 Hull Cleaning Under Water and Boot Top Area (a) HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and present for survey.
002 Hull Cleaning Shipside above water including bulwark and Superstrcture (b) HP jet clean entire Shipside (with a pressure not exceeding 3000 PSI) to remove the salts and contaminants from the surface and present for survey and present for survey.
002 Hull Cleaning Weather Deck (c) HP jet clean entire Weather Deck including fittings (with a pressure not exceeding 3000 PSI) remove salts and contaminants from the surface and present for survey.
002 Hull Cleaning Tanks (d) Manually clean following tanks and present for survey.The tanks should be washed out with fresh water and soap water to remoeve any sediment or dirt present in the tank :- WB Tanks (09 Nos)-1100 Sqm. , Fuel oil tank-132 Sqm.,Bilge holding tank-32 Sqm.,Cargo oil tank-120 Sqm.,FW-180 Sqm. ,Void spaces-200 Sqm. , cofferdam-300Sqm., cargo hold-190 Sqm. , cable locker-45 Sqm., internal compt i.e paiint store, rope store, bosun store-110 Sqm.,Sewage tanks-33 Sqm , deck store and .and engine room bilges-45 Sqm.
003 Hull survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull, boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.. Approx. area:1800 Sqm Firm to submit 07 copies of Hull survey report .
004 UTG Survey Carry out UTG survey in the presence of QC representatives of U/W hull, sea tubes, sea chest and wherever recquired ie.superstructure,above water hull,weather deck,tank top etc.as per survey team. Firm to submit 07 copies of Hull survey report. All deck fittings to be surveyed, repaired and load tested where considered necessary.All manholes to be inspected and repaired to ensure watertightness including conduct of Chalk impression test.
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Firms to indicate cost of new panelling(2mm thick) and Lagging (2" MFMB) material in the budgetary cost for 50 sqm each.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) 25 x 25 mm - 150Nos
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) 50 x50 mm - 75 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Sea tubes Surface prepartion of of the sea tubes to be carried out for survey and pressure testing of sea tube including sea chest . Dia - 300mm
010 Draught Marks Draught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted.
011 Sacrificial Anodes (a) Renew MK - I sacrificial anodes which are perished over 50%. Note:- Anodes will be supplied by Navy/COY.
011 Sacrificial Anodes (b) Renew MK - V sacrificial anodes which are perished over 50%. Note:- Anodes will be supplied by Navy/COY.
012 Surface preparation Under Water area including Boot top area with Grit Blasting Spot blasting to SA 2.5 on complete UW area including boot top.last paint scheme done in 2012 while induction and due for renewal as per NO-53/16 :-
013 Painting - Jotun Scheme Under Water area including Boot top area Complete UW Paint scheme renewal view last paint scheme done in 2012 while induction and due for renewal as per NO-53/16 :- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
014 Surface Preparation Above Water Area and Bulwark including fittings Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey) - 125 microns DFT
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
016 Surface Preparation Super Structure and Deck Fittings . Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - penguard primer -50 microns DFT
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 80 red brown - 125 microns DFT
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic 80 grey- 125 microns DFT
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top GREY 7040- 150 microns DFT
018 Surface Preparation Weather Decks Bridge Deck Bridge Top and Fittings Carry out surface preperation to WJ 2.0 standard by using Hydro Jet Blasting for paint application for entire weather deck, wheel house deck, flag deck and life raft deck.
019 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
019 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
019 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
020 Surface Preparation Internal Compartments Fresh Water Tanks (02 Nos) and Fire fighting foam tank:- Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) and Fire fighting foam tank Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard HB (white) -100 microns DFT
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) and Fire fighting foam tank Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Penguard HB(Grey) -100 microns DFT
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) and Fire fighting foam tank Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Penguard HB (white) -100 microns DFT
022 Surface Preparation Tanks Fore Peak Tanks, Ballast Tanks, cable locker and void spaces (a) Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
022 Surface Preparation Tanks Fore Peak Tanks, Ballast Tanks(10 No), cable locker (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application.
023 Painting - JOTUN Scheme Fore Peak Tanks, Ballast Tanks(10 No), cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
023 Painting - JOTUN Scheme Fore Peak Tanks, Ballast Tanks(10 No), cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
023 Painting - JOTUN Scheme Fore Peak Tanks, Ballast Tanks(10 No), cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
024 Surface Preparation Machinery Compartments- Engine room and SRP (a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for paint application ( Bilges).
024 Surface Preparation Machinery Compartments -Engine room and SRP (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application (Bulkheads).
025 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
025 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns DFT
025 Painting - JOTUN Scheme. Machinery Bilges Paint Bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns
025 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns.
026 Surface Preparation Machinery Compartments- Bulkheads Of Engine Room And ASP (a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for paint application ( Bilges).
026 Surface Preparation Machinery Compartments- Bulkheads Of Engine Room And ASP (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application ( Bilges).
027 Painting- Jotun Scheme. Machinery Compartments Bulkheads Of Engine Room And ASP Paint bulkheads of Engine room and SRP compartments with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer - 50 microns DFT
027 Painting- Jotun Scheme. Machinery Compartments Bulkheads Of Engine Room And ASP Paint bulkheads of Engine room and SRP compartments with following paint scheme:- (b) 2nd Coat: White interior fire retardant paint 100 microns DFT
027 Bulkhead Painting. Painting - Jotun Scheme. Paint bulkheads of Engine room and SRP compartments with following paint scheme:- (c) 3rd Coat: White interior fire retardant paint 100 microns DFT
028 Cleaning and Application of Oil (a) Fuel Tanks/AVCAT Manually scrap and clean Fuel Tank (10 nos) to bare metal and apply two coats of OM 750 oil. Note:- Quoted repair cost shall be inclusive of cost of oil also
028 Cleaning and Application of Oil (b) RU (FODS) Tanks Manually scrap and clean RU Tank (02nos) to bare metal and apply two coats of OM 750 oil. Note:- Quoted repair cost shall be inclusive of cost of oil also
029 Surface Preparation Tanks LO tanks and dirty oil tanks Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
030 Painting - JOTUN Scheme LO tanks & dirty oil tanks Paint LO tanks & dirty oil tanks with following paint scheme. (a) 1st Coat: primer - Tankguard HB-125 microns DFT Note:- Quoted repair cost shall be inclusive of cost of paints also.
030 Painting - JOTUN Scheme LO tanks & dirty oil tanks Paint LO tanks & dirty oil tanks with following paint scheme. (b) 2nd Coat: primer - Tankguard HB-125 microns DFT Note:- Quoted repair cost shall be inclusive of cost of paints also.
031 Gratings Open underwater gratings, present for survey, carry out necessary repairs and refit back.
032 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. a) Anchor
032 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. b) Chain cable (Dia 32 mm) total length of the cable 275 Mtrs
032 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and c) Swivel piece
032 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting d) Lug less joining shackles
032 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and e) Cable stopper
032 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and f) D Shackles
033 Anchor windlass/ Capstan (a) Completely strip & overhaul anchor windlass (including lub oil renewals), renew brake linings, refit and prove for satisfactory operation.Note :- Overhaul involves removal of drum, gearbox, brake lining, motor and ovrhaul of all these items and refitment. Oil-SYS-46/HP80
033 Capstan (b) Completely strip & overhaul Capstan and prove for satifactory operation.Note :- Overhaul involves removal of drum, gearbox, brake lining, motor and ovrhaul of all these items and refitment. Oil-SYS-46/HP80
034 Bollards Single bollards Following Single bollards corroded, thinned. Entire bollard to be renewed (a) Single bollards, Size: 290 mm dia, 10 mm thickness, 1300 mm length. schdule-80 pipe
034 Bollards Twin bollards (b) Following Twin bollards corroded, thinned. Entire bollard to be repaired/renewed as per Hull survey report. Dia of bollard pipe 290 MM. Height of bollard 515 MM. Size of bollard base/ foundation1163X125X380 MM: , Thickness of pipe: 10 mm. Doubler plate size: 1230X480X10 MM, thickness: 10 mm,
035 Tyre Fender Tyre fenders damaged on P&S side to be renewed with used automobile tyre fenders moulded with 8 mm layer of white natural rubber on top and outer sides. Mat- Rubber, colour-white. No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) Tyre fender OD-1000 mm ID -800 mm Width -350 mm
036 Tyre Fender securing arrangement Tyre fender to be secured with 14 mm dia chain on head, stern and ship side (a) Securing chains: 14mm dia(Mat-GI)
036 Tyre Fender securing arrangement Tyre fender to be secured with D shackles on ship side (b) D Shackles 14 mm dia(Mat-GI)
036 Tyre Fender securing arrangement Securing chain is to be passed through metallic sleeves inserted into the tyre fenders (c) Securing sleeves of dia 03 inch and length 250 mm (Mat MS pipe of 06mm thick)
036 Tyre Fender securing arrangement Tyre fenders securing eye plates to bo be welded along ships side for connecting of securing chains (d) Eye plate thickness 8 mm. (Mat - MS)
037 Bulwark (a)Bulwark at various places dented/damaged. To be included in hull in survey and renew as per survey report. Thickness-6 mm
037 Bulwark coaming (b) Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renewed as per survey report. Dia 3 " Mat : MS
038 Sky light/port holes Sky light at various places damaged including glass. Skylight/port holes is to be repaired/renewed as per sample.
039 Metalic half pipe fender Metallic half pipe fender around the shipside to be repaired/renewed. (a) Size - 150mm dia, 08mm thick
039 D SHAPED FENDERS 'Removal of all D shaped fenders for survey of C channels and necessary repairs is to be attended on securing channels including nut and bolts). Post repair of C channels damaged fenders is to be renewed Details of D shaped rubber fender and associated fittings are as follows:- D' shaped fenders of 1000 X100X250 mm
039 D Shaped Fenders Securing Arrangement C Channel Fender Securing Arrangement Corroded/Thinned/Holed , To Be Repaired As Per Hull Survey Reports
039 D shaped fenders securing arrangement nut and bolts Fender securing arrangement i.e nut and bolts corroded/thinned/holed , to be renewed for securing of D fenders around ship side
040 Rubber beading. Rubber beading of doors at various places perished/cracked to be renewed and chalk test to be proved. As per NCD 5904 (a) Tensile strength Kg/cm2 (min %) 70 (b) Elongation at break (min %) 350 (c) Hardness shore A 50+/-5 ) (a) WT door
040 Rubber beading. Rubber beading of hatches at various places perished/crackedto be renewed and chalk test to be proved. As per NCD 5904 (a) Tensile strength Kg/cm2 (min %) 70 (b) Elongation at break (min %) 350 (c) Hardness shore A 50+/-5 ) b) WT hatch
040 Rubber beading. Rubber beading of skylight perished/crackedto be renewed and chalk test to be proved. As per NCD 5904 (a) Tensile strength Kg/cm2 (min %) 70 (b) Elongation at break (min %) 350 (c) Hardness shore A 50+/-5 ) (c) Ventilator/Sky light
041 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 0.2 bar for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Note:- APT to be done in every 04 year,Ref.-NO-01/15,last APT done in Nov-Dec 18 (a) Fresh Water Tank
041 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 0.2 bar for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (b) Ballast Tank
041 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 0.2 bar for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial.. (c) Forepeak Tank ,cofferdam and void spaces
041 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 0.2 bar for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (d) Fuel Tank ,do tanks , bilge holding tank
041 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 0.2 bar for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (e) Firefighting Foam Tank
042 BIilge Platform (a) Renew bilge platform plate. Material- chequered aluminium, thickness- 05 mm
042 BIilge Platform (b) Bilge platform supporting brackets to be renewed where ever required. Mat - MS
043 Cleats MS cleats perished/thinned to be renewed (Size-28 mm). Mat : MS
044 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be renewed. (Mat. GI pipe) (a) Pipe dia 2 1/2 inch
044 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be renewed. (Mat. GI pipe) (b) Distance piece and flanges: Dia 150mm (including rubber joints)
045 WT Hatch clips (a) Hatch clips broken / damaged. To be renewed. Mat. MS
045 WT hatches (b) Hatch clips at various places jammed , to be lubricated including washer and fitted back
046 WT Doors (a) Clips of WT. Doors Jammed to be removed lubricated including washer, nut and fitted back
046 WT Hatch metal coaming (b) Metallic coaming of 05 in no WT Hatches on weather deckand various locations corroded and thinned. To be renewed as per survey report. Area - 20 Sqm.
047 Circular hatches Oprating lever of circular hatches jammed to be overhauled
048 NWT doors NWT wooden doors including frames of wheel house/crew cabin, master cabin perished /damaged. To be renewed/repaired
049 Ventilation Mushroom type ventilators on weather deck jammed ,to be removed, cleaned/ overhauled and fitted beck. Dia: 550mm (a) 550mm dia
050 Ventilation Mushroom type ventilators to be removed, cleaned/ overhauled and fitted back. Renew if required. (a) Details- Mush room head dia-1000 mm, Height-800 mm
050 Ventilation Mushroom type ventilators on weather deck jammed ,to be removed, cleaned/ overhauled and fitted beck. Dia:360 mm (b) 360mm dia
050 Ventilation (c) Ventilation trunking perished to be repaired/ renewed. Location: - crew rest room , masters cabin, ED rest room galley/dinning hall and fitted back . Mat-GI sheet
051 Breather pipe Breather pipe on weather deck perished/damage.To be renewed
052 Liferaft Securing stand of Life rafts perished and damaged. To be renewed alongwith rubber lining and supporting frame, including fitment of HRG Mat-MS . Thickness- 06mm.
053 Nav Light Nav light foundation (Port & Stbd) corroded, to be repaired/renewed. Size: 620mmx620mmx300mm and thickness 6mm, Mat MS
054 Drainage System MS Scupper lips with rubber packing corroded/thinned/holed, to be renewed/repaired at ship side
055 Drainage System (a)Deck Drain pipes corroded/ holed, to be renewed/repaired. Dia 2 1/2 inch. Mat: GI note : Pipes / fittings should be secured with rubber packing’s and clamps uniformly
055 Drainage System (b)Scupper with coaming of drain pipe corroded/ thinned, to be renewed/repaired. Size: 250mmx200mm
055 Drainage System (c) Deck drain pieces on upper deck corroded, to be renewed/repaired. Dia 2 1/2 inch, each of length 01Mtr. note-The job involves removal/repair and fitment of pipes/ panelling/ lagging/ trunking in the way.
055 Drainage System. (d) Soil pipes of Crew, ED's and Master's bathroom to be removed chemically cleaned and fit back.
056 Pipelines Carry out pressure testing & repairs of soil pipe/drainaige pipe/fresh water lines fitted at various locations
057 Sofa/cushion Sofa in master and engineer rest rooms torn/perished. To be repaired
058 Panelling Wooden panels in crew accommodation, Engg. rest room, master rest room and other places damaged. To be repaired
059 Furniture Wooden table damaged/broken at crew dinnig hall and crew cabin to be repaired.
060 Guard Rails Guard rails pipe damaged/ perished at Bridge deck. To be repaired/renewed. Material - GI Pipe .
061 Stanchion (a) Stanction on upper deck damaged/deformed at various loactions. To be repaired/renewed. Size- H - 970 mm and dia - 50 mm Mat- GI pipe
061 Stanchion (b) Securing chain between stanchions on upper deck damaged. To be renewed. Mat - MS, Size - 10 mm dia
062 Name board Following Tug name board perished/damaged, to be renewed/repaired. (a) Repair/renewal of vessel name board including electroplating to be carried out on ship side -02
062 Name board Following Tug name board perished/damaged, to be renewed/repaired. (b) Painting of tug name on bulwark in both Hindi and English at stem and stern with fluorescent paint -03
062 Name board Following Tug name board perished/damaged, to be repaired. (c) Illuminated name board with Perspex sheet - 01
063 Door locks (a) Mortise lock of non WT door defective at various locations, All defective mortise locks to be renewed. including 03 set of keys
063 Door locks (b) Locking arrangement is to be provided for wt doors at various locations, including hasp & staples and pad locks
064. Sanitary system SS Wash basin damaged in crew batroom and wc to be repaired as indicated (a) Wash basin
064 Sanitary system SS tap damaged in crew batroom and wc to be repaired as indicated (b) SS tap: 1/2 inch
065 Sanitary system supply pipes damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated c) Supply pipe: Mat : Cu-Ni, dia: ½’’
065 Sanitary system drain pipes damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated d) Drain pipe: Mat-MS,dia- 2’’
065 Sanitary system Flush valves damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated e) Flush valves - Mat - Brass, Dia - 2"
065 Sanitary system PVC Wash basin Drain Pipe Line Damaged To Be Renewed As Indicated f) PVC drain pipe Note:- Quoted repair cost shall include cost all items.
066 WC/Commode WC commode and base plate in crew wash room perished/corroded, to be renewed. Mat - SS
067 Bathroom fittings Bathroom fittings damged/broken in crew bathrooms and master bathroom , to be renewed as per sample (a)cu -ni supply pipes
067 Bathroom fittings Bathroom fittings damged/broken in crew bathrooms and master bathroom , to be renewed as per sample (b) Shower head
068 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. NOTE:- (a) Surface preparation and application of EROP. As per NCD 3717
068 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (b) Application of Underlay as per NCD 3717
068 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (c) Application of sealer coat and top coat on entire area As Per NCD 3717.
069 Foundation Foundation of deck machinery / deck fittings corroded/thinned/perished , to be repaired/renewed as per survey report
070 Lagging Lagging at indicated places to be removed to facilitate structural repairs and to be renewed with new lagging post completion of repairs.mat-ss
071 Deck head panelling/ Sunmicia Panelling at indicated places to be removed to facilitate structural repairs and to be refitted post completion of repairs. Mat : wooden
072 Panelling Panelling at indicated places including wet Compt to be removed to facilitate structural repairs and to be refitted post completion of repairs. Mat : SS
073 Manhole (a) Manhole covers corroded/ thinned To be renewed as per survey report Mat - IS 2062 Grade 'B' steel. Size - 2' X 1.5'
073 Manhole (b) Rubber joints deterioted, to be renewed
073 Manhole (c) studs of manholes corroded, to be renewed. Only defective studs which are found defective on survey to be renewed. MS Studs with nut, size 20 mm
ENGINEERING WORK PACKAGE 1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS a) Drain and clean sump. Charge Fresh engine oil.(Oil to provide by navy)
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS b) Change air Cleaner element.
1001 MAIN ENGINE (Qty-02) ,MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS c) Change fuel filter.
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS d) Renew coolant inhibitor with zinc plugs.
1001 MAIN ENGINE (Qty-02) ,MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS e) Renew engine oil filter.
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS f) Renew by-pass filter.
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS g) Caliberate and Adjust injectors and Test report to be rendered.
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS h) Remove and Clean fresh water cooler .Carry out pressure testing.Renew gasket & 'o' rings
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS j) Air starter and air starting mechanism need to be overhauled
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS k) Expansion tank and connecting piping to clean internally and repair if required.
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS m) Gear box lub oil to be renewed
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS n) Damaged Fly wheel gear teeth of both main engine to repaired
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS (p) Renew Fly wheel if repair is not feasible
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS q) Remove and Clean lub oil cooler carry out pressure testing.Renew gasket & 'o' rings
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS r) Replace all rubber hoses and durret
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS s) Both engine sea water pump to be overhauled and defective part to be renew
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS t) Air starting mechanism mositure absorber body leaking. To be repaired
1001 MAIN ENGINE (Qty-02) , MAKE-CUMMINS,MODEL-KTA-38M2 MARINE PROPULSION ENGINE,POWER-1350BHP,19500RPM,SL NO-PORT(25344299), STBD(25344298),running hours PME 200 HRS &SME 200 HRS u) Post completion of routine, engine to be proved for satisfactory performance Note:- Routine to be carried out by OEM only and all the calibration certificate and test report to be rendered.
1002 EMERGENCY GENERATOR (QTY-01) , MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS.
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. (a) Carry out adjustment of injectors & valves.
1002 EMERGENCY GENERATOR (QTY-01) , MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. (b) Drive belt need to be changed.
1002 EMERGENCY GENERATOR (QTY-01) , MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. (c) Replace rocker cover gaskets.
1002 EMERGENCY GENERATOR (QTY-01) , MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. d) Change engine oil. (Oil will be supplied by navy)
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. e) Change air Cleaner element.
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. f) Change fuel filter.
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. g) Renew coolant inhibitor with zinc plugs.
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. h) Renew engine oil filter.
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. j) Renew by-pass filter.
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. k) Post completion of routine, engine to be proved for satisfactory performance
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. l) Remove and Clean lub oil cooler carry out pressure testing. Renew gasket & 'o' rings
1002 EMERGENCY GENERATOR (QTY-01) ,MAKE-KIORLOSKAR &CROMPTON GREAVES AC GENERATOR,THANE,MODEL-BRD.0.9C54.7,SL NO:-62R6.5/41 Running hours 40 HRS. m) Replace all rubber hoses and durret Note:- Routine to be carried out by OEM only.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN)
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (a) Lub oil sump to be drained,cleaned &new oil to be charged(lub oil will be provided by the department)
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (b) Renew air inlet filter element.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (c) Sump stainers/ filter to be cleaned & fitback
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (d) Sump stainers/ filter to renew , if Strainer perished
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (e) Instumentation gauges pipes with suitable end fittings to be renewed mat:CuNi dia:1/4"
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (f) Pressure switches to be calibrated and proven for correct operation.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (g) Oil/Water moisture separator of compressors to be renewed
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (h) Chemical cleaning & pressure testing of air bottles to be carried out.capacity-375ltrs,TP-49bar
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (j) Relief valves on air bottles to be set at 45 bar.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (k) Renew air system cocks.mat-ss,dia-20mm
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (l) Drive belts of compressor to be changed.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (m) Drive belt guard of compressor to be renewed.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) n) Top cover of compressor to be opened and inspection of piston and valves to be carried out
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) p) Replace top cover gaskets.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (q) Compressor to be proved for satisfactory perfomance.
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (r) Air Cooled Intercooler and after cooler to tubes to clean ,deposits of oil ,dirt or grease to removed
1003 HP AIR COMPRESSOR (QTY-02) ,MAKE-INGERSOLL RAND,U.D.MARKETING PVT LTD.KOLKATA,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-7T4X5,CAPACITY-12Cu.M/HR@30 BAR,SL NO-9054135(MOTOR DRIVEN),9054134(DIESEL DRIVEN) (s) Proper mounting of Canopy to base frame with smooth opening and closing operation to ensure. The base frame and canopy to Zinc sprayed fo rust inhibition,primer and final paint to applied. Canopy sealing gasket XLPE to renewed.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out )
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (a) Carry out pr testing, adjustment of injectors & valves and Test report to be rendered.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (b) Replace rocker cover gaskets.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) c) Change engine oil. (Oil to provided by Navy)
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (d) Overhaul Sea water pump.Prove the pump for satisfactory performance and defective part to be renewed.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) e) Clean expansion tank internally,repair expansion tank and connecting piping if required. Replace coolant (Coolant to be provided by firm)
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (f) Remove & chemical clean lub oil cooler & carry out pressure testing.Renew gasket & 'o' rings.Zing plugs to be renewed
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (g) Remove & chemical clean fresh water cooler & carry out pressure testing.Renew gasket & 'o' rings. Zing plugs to be renewed
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (h) Change heat exchanger zinc plugs.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (j) Check thottle linkage,lubricate ball joints of the throttle linkage of Governor.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (k) All rubber durrets & hoses to be replaced.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (l) Change fuel filter
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (m)Change air Cleaner element.
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (n) Caliberation of FIP & governor assembly to be carried out.report of the same to be rendered
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (p) Rectify if any defect observed in FIP & Governor assembly
1004 DIESEL GENERATOR(KOEL & CROMPTON) (QTY-02) ,MAKE-KOEL,MODEL-6SL9088TA1,OUTPUT-176BHP@1500RPM,SL NO:-F6.3002/0900004(PORT) , F6.3002/0900005(STBD) running hours PDG 1200 HRS SDG 1000 HRS (1500 hrly routine to be carried out ) (q) Overhauling of electric Starter to be done NOTE: 1500 hrly routine of DG to be undertaken by OEM
1005 FUEL OILTRANSFER PUMP (QTY-02) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT , CAPACITY:-2 Cu.M/Hr@20MWC,SL NO:-B1403-09.
1005 FUEL OILTRANSFER PUMP (QTY-02) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT , CAPACITY:-2 Cu.M/Hr@20MWC,SL NO:-B1403-09. (a) Carry out overhauling of pumps,renew bearing &shaft seal.
1005 FUEL OILTRANSFER PUMP (QTY-02) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT , CAPACITY:-2 Cu.M/Hr@20MWC,SL NO:-B1403-09. (b) Suction &discharge presure gauges to be renewed.range 30"-0" &0-05bar
1005 FUEL OILTRANSFER PUMP (QTY-02) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT , CAPACITY:-2 Cu.M/Hr@20MWC,SL NO:-B1403-09. (c) Renew needle valve.Mat-ss
1005 FUEL OILTRANSFER PUMP (QTY-02) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT , CAPACITY:-2 Cu.M/Hr@20MWC,SL NO:-B1403-09. (d) Carry out alignment of pump with motor &prove for satisfactory perfomance.
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008 (a) Centrifuge bowl assembly to be dismantled.All separator disc plates to be removed cleaned &fitted back.Renew disc plates if perished.
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008 (b) Check the condition of gravity disc.Renew gravity disc,if required.
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008 (C) Drive shaft friction pads to be renewed
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008 (d) Suction & discharge presure gauges to be renewed range:30"-0" & 0-8".
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008 (e) 02 pr.gauges of 0-6 bar,02 copper pipes with suitable end fittings to be renewed.mat:CuNi dia:1/4".
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008 (f) Condition of SV mounts be checked, if found defective to be renewed.
1006 FUEL OIL CENTRIFUGE (QTY-01) ,MAKE:-ALFA LAVEL INDIA LTD,PUNE,CAPACITY-1150LPH@DISC PR 1.5 KG/CM2,MODEL-MAB103,SL NO:-4176151-2008 (g) Centrifuge to be proved for satisfactory perfomance post work completion.
1007 FUEL OIL CARGO PUMP (QTY-02) ,MAKE:-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-100Cu.m@30 MWC,SL NO:-W0050110(NO.1),W0047610(NO.2)
1007 FUEL OIL CARGO PUMP (QTY-02) ,MAKE:-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-100Cu.m@30 MWC,SL NO:-W0050110(NO.1),W0047610(NO.2) (a) Carry out overhauling of pumps,renew bearing &shaft seal.
1007 FUEL OIL CARGO PUMP (QTY-02) ,MAKE:-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-100Cu.m@30 MWC,SL NO:-W0050110(NO.1),W0047610(NO.2) (b) Suction &discharge presure gauges to be renewed.range 30"-0" &0-100psi.
1007 FUEL OIL CARGO PUMP (QTY-02) ,MAKE:-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-100Cu.m@30 MWC,SL NO:-W0050110(NO.1),W0047610(NO.2) (c) Renew needle valve.Mat-ss
1007 FUEL OIL CARGO PUMP (QTY-02) ,MAKE:-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-100Cu.m@30 MWC,SL NO:-W0050110(NO.1),W0047610(NO.2) (d) Carry out alignment of pump with motor &prove for satisfactory perfomance.
1008 LUB OIL TRANSFER PUMP (QTY-01) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@5KG/CM2.SL. NO-B1396-02
1008 LUB OIL TRANSFER PUMP (QTY-01) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@5KG/CM2.SL. NO-B1396-02 (a) Overhauling of pumps includes repair/renewal of weardown parts(Shaft,mechanical seals,impeller,gaskets,bearings) and fitted back.
1008 LUB OIL TRANSFER PUMP (QTY-01) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@5KG/CM2.SL. NO-B1396-02 (b) Suction & discharge presure gauges to be renewed range:30"-0" & 0-5bar".
1008 LUB OIL TRANSFER PUMP (QTY-01) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@5KG/CM2.SL. NO-B1396-02 (c) Renew needle valve.Mat-ss
1008 LUB OIL TRANSFER PUMP (QTY-01) ,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@5KG/CM2.SL. NO-B1396-02 (d) Carry out alignment of pump with motor &prove for satisfactory perfomance
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (a) Proximity sensors to be calibtrated &replace if required.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (b) Calibration of 3/2 way pneumatic valve.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (c) Renewal of 6mm copper pipe.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (d) Primary & secondry cell cleaning.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (e) Primary & secondery stage filter to be replaced.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (f) Overhauling of screw pump.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (g) Caliberation of puri meter.
1009 OILY BILGE WATER SEPARATOR (QTY-01) ,MAKE:-VICTOR MARINE LTD,UK,TYPE:-CS500,CAPACITY:-0.5 Cu.M/[email protected] BAR,SUCTION HEAD:- -0.6BAR AT SEPARATOR INLET,DISC HEAD:-3.45BAR,SL NO:-00358. (h) Perfomances trials for satisfactory perfomance.
1010 DIRTY OIL PUMP (QTY-01) ,MAKE-,MODEL:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@2KG/CM2,SL NO:-B1400-02.
1010 DIRTY OIL PUMP (QTY-01) ,MAKE-,MODEL:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@2KG/CM2,SL NO:-B1400-02. (a) Carry out overhauling of pump
1010 DIRTY OIL PUMP (QTY-01) ,MAKE-,MODEL:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@2KG/CM2,SL NO:-B1400-02. (b) Suction &discharge presure gauges to be renewed.range 30"-0" &0-05bar
1010 DIRTY OIL PUMP (QTY-01) ,MAKE-,MODEL:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@2KG/CM2,SL NO:-B1400-02. (c) Renew needle valve.Mat-ss
1010 DIRTY OIL PUMP (QTY-01) ,MAKE-,MODEL:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@2KG/CM2,SL NO:-B1400-02. (d) Renewal of bearings &shaft seal.
1010 DIRTY OIL PUMP (QTY-01) ,MAKE-,MODEL:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-1 Cu.M/Hr@2KG/CM2,SL NO:-B1400-02. (e) Carry out alignment of pump with motor &prove for satisfactory perfomance.
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4 (a) Carry out overhauling of pumps,renew parts if required.
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4 (b) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4 (c) Renew needle valve. Mat-1/4"
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4 (d) Carryout alignment of pump with motor & prove for satisfactory perfomance.
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4 (e) Suction & discharge pressure gauges to be renewed.range 0-120psi & 30"-30psi.
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4 (f) Renew jaw coupling & rubber coupling between pump & motor.
1011 BILGE AND BALLAST PUMP (QTY-04) ,MAKE:-BE PUMP,MODEL:-SH 65-160MN1-GDS2-316,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-35Cu.M/Hr@30KG/SQ.CM,SL NO:-357815(NO.1),357814(NO.2),357813(NO.3),357812(NO.4 (g) Rectify leakages in self priming unit,renew flexible hoses if required.
1012 FRESH WATER CARGO PUMP,MAKE:-BE PUMP,MODEL:-MA 843KKS-DGS2-316-MS-3,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-40Cu.M/Hr@30Kg/Sq.Cm,SL NO:-357811.
1012 FRESH WATER CARGO PUMP,MAKE:-BE PUMP,MODEL:-MA 843KKS-DGS2-316-MS-3,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-40Cu.M/Hr@30Kg/Sq.Cm,SL NO:-357811. (a) Carry out overhauling of pumps,renew parts if required.
1012 FRESH WATER CARGO PUMP,MAKE:-BE PUMP,MODEL:-MA 843KKS-DGS2-316-MS-3,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-40Cu.M/Hr@30Kg/Sq.Cm,SL NO:-357811. (b) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1012 FRESH WATER CARGO PUMP,MAKE:-BE PUMP,MODEL:-MA 843KKS-DGS2-316-MS-3,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-40Cu.M/Hr@30Kg/Sq.Cm,SL NO:-357811. (c) Renew needle valve. Mat-1/4"
1012 FRESH WATER CARGO PUMP,MAKE:-BE PUMP,MODEL:-MA 843KKS-DGS2-316-MS-3,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-40Cu.M/Hr@30Kg/Sq.Cm,SL NO:-357811. (d) Carryout alignment of pump with motor & prove for satisfactory perfomance.
1012 FRESH WATER CARGO PUMP,MAKE:-BE PUMP,MODEL:-MA 843KKS-DGS2-316-MS-3,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-40Cu.M/Hr@30Kg/Sq.Cm,SL NO:-357811. (e) Suction & discharge pressure gauges to be renewed.range
1012 FRESH WATER CARGO PUMP,MAKE:-BE PUMP,MODEL:-MA 843KKS-DGS2-316-MS-3,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-40Cu.M/Hr@30Kg/Sq.Cm,SL NO:-357811. (f) Renew jaw coupling & rubber coupling between pump & motor.
1013 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1399-09.
1013 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1399-09. (a) Pumps to be overhauled .Renew wear down parts if required.
1013 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1399-09. (b) Suction & discharge pressure gauges to be renewed.range-(-1 TO 1Kg/Sq.Cm) & 0-10Kg/Sq CM
1013 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1399-09. (c) Renew needle valve.Mat:ss dia 1/4"
1013 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1399-09. (d) Carry out alignment of pump with motor & prove for satisfactory perfomance.
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (a) Dia 300 mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (b) Dia 150 mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (c) Dia 125 mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (d) Dia 100 mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (e) Dia 80 mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (f) Dia 40mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (g) Dia 20mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (h) Dia 32 mm
1014 Valve to be Overhauled Make-Vijoli,Type-Screw Down,Overhauling includes renewal of wear down parts (spindle,disc), Mat- GM (j) relief valves(100mm)
1015 BILGE COLLECTING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1397-09.
1015 BILGE COLLECTING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1397-09. (a) Pumps to be overhauled .Renew wear down parts if required.
1015 BILGE COLLECTING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1397-09. (b) Renew needle valve.Mat:ss dia 1/4"
1015 BILGE COLLECTING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1397-09. (c) Carry out alignment of pump with motor & prove for satisfactory perfo
1015 BILGE COLLECTING PUMP,MAKE:-ROYSON ENGINEERS PVT LTD,KOLKATA ,MODEL:-RGP 1 MT,CAPACITY:-2Cu.M/Hr@20MWC,SL NO:-B-1397-09. (d) Suction & discharge pressure gauges to be renewed.range-(-1 TO 1Kg/Sq.Cm) & 0-10Kg/Sq CM
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (a) Dia 150 mm,fuel line pipes,Test pr-05 bar
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (b) Dia 100 mm, AVCAT line pipes,Test pr-05 bar
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (c) Dia 125 mm, sea water pipe line(bilge/ballast/fire main),Test pr-05 bar
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (d) Dia 80mm,fresh water system pipes,Test pr-05bar
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (e) Dia 40 mm,fuel lines pipes,Test pr.-2cu.m/hr
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (f) Dia 32 mm,fuel line pipes,test pr.-5bar
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (g) Dia 20mm,fuel line pipes,test pr.-4 bar
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (ii) Following system pipes to be renewed along with flanges.
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (ii) Following system pipes to be renewed along with flanges. (a) Sea water pipe lines(40 mm Dia),port & stbd DG
1016 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING/RENEWAL (ii) Following system pipes to be renewed along with flanges. (b) Sea water pipe lines (20 mm Dia),port & stbd DG
1017 MISCELLANEOUS: (a) Exhaust laging of both DG exhaust system to be renewed,Dia-100mm
1017 MISCELLANEOUS: (b) Exhaust laging of DD compressor exhaust system to be renewed,Dia-25mm
1017 MISCELLANEOUS: (c) Exhaust laging of both Main Engine exhaust system to be renewed,Dia-200mm
1017 MISCELLANEOUS: (d) Manufacture of various adapters as per sample
1017 MISCELLANEOUS: (e) Fuel transfer hose to be provide.(length-80mtr)
1017 MISCELLANEOUS: (f) Mechanical cleaning of exhaust system of both DG(Dia-125mm)
1017 MISCELLANEOUS: (h) 2 kg + 4.5 kg CO2 Extinguisher to weighed
1017 MISCELLANEOUS: (i) Hose basket to be manufactured as per sample
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required)
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (a) Complete drenching system piping to be blown through using HP air to prove system free of blockages
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (b) Admit LP air into ring main Checking the system for leaks. Ensure that all the discharge pipes and nozzles are clear.
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) c) Caliberate pressure gauges fitted in the system.
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (d) CO2 discharge nozzles to be opened, Checked for chockages, Cleaned and fitted back. Carry out weighing of CO 2 cylinders.
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (e) Disconnect operating cables from cylinders. Remove old grease and renew grease on all external fittings i.e. pulleys,pull handles,actuators,micro-switches and cables and cables (as applicable). Ensure freedom of movement of gang release piston , and all cables, pulleys, cocks and valves. Examine all nozzles and piping for any obstruction and Clean, if required. Reconnect cables on completion.
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (f) Check the condition of flexible hoses.If required same to be renewed. (Pr 275bar)
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (g) Carry out functional Checks of the sensors,alarms,solenoid and safety system. Ensure that they are operational. Replace/repair componets as required.
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (h) Lamp Checks of various ' Indication' in the Control Panel. Replace if defective
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (i) Check Klaxon Horn and strobe comes on
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (k) Check Hooter and Fire detector
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (l) Clean all contacts of relays and push buttons of the control panel.
1018 CO2 Fire Fighting sytem Maker:-SHM Ship Care (All procedures to be carried as mentioned below and replace defective parts if required) (m) Carry out insulation and continuity Check of wiring and control panel. Note: The entire CO2 system to be proved for functional Checks without CO2
1019 AVCAT PUMP,MAKE-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-40Cu.m@30 Kg/Sq.Cm,
1019 AVCAT PUMP,MAKE-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-40Cu.m@30 Kg/Sq.Cm, (a) Carry out oveerhauling of pumps,renew bearing &shaft seal.
1019 AVCAT PUMP,MAKE-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-40Cu.m@30 Kg/Sq.Cm, (b) Suction &discharge presure gauges to be renewed.range 30"-0" &0-6BAR.
1019 AVCAT PUMP,MAKE-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-40Cu.m@30 Kg/Sq.Cm, (c) Renew needle valve.Mat-ss
1019 AVCAT PUMP,MAKE-BEST & CROMPTON ENGG.LTD,CHENNAI,CAPACITY-40Cu.m@30 Kg/Sq.Cm, (d) Carry out alignment of pump with motor &prove for satisfactory perfomance.
1020 STEERING SYSTEM, MAKE : M/S Getha Eng Works, WORKING PRESSURE 104 BAR, SL.NO-6144-1(Port), 6144-2(Stbd)
1020 STEERING SYSTEM, MAKE : M/S Getha Eng Works, WORKING PRESSURE 104 BAR, SL.NO-6144-1(Port), 6144-2(Stbd) (a) Change hydraulic filter elements (`pump suction, return line, reserve line and emergency line filters).
1020 STEERING SYSTEM, MAKE : M/S Getha Eng Works, WORKING PRESSURE 104 BAR, SL.NO-6144-1(Port), 6144-2(Stbd) (b) lubtricate power unit motor bearings (Grease XG 272)
1020 STEERING SYSTEM, MAKE : M/S Getha Eng Works, WORKING PRESSURE 104 BAR, SL.NO-6144-1(Port), 6144-2(Stbd) (c) Lubricate Actuator bearings ( Grease LG 280 / XG 279)
1020 STEERING SYSTEM, MAKE : M/S Getha Eng Works, WORKING PRESSURE 104 BAR, SL.NO-6144-1(Port), 6144-2(Stbd) (d) Hand pump to be operated and system to be checked with hand pump for operation, leakages in system to be rectified.
1020 STEERING SYSTEM, MAKE : M/S Getha Eng Works, WORKING PRESSURE 104 BAR, SL.NO-6144-1(Port), 6144-2(Stbd) (e) Visually check electric motor and cables.
1020 STEERING SYSTEM, MAKE : M/S Getha Eng Works, WORKING PRESSURE 104 BAR, SL.NO-6144-1(Port), 6144-2(Stbd) (f) Mechanical cleaning of propellers and rudders for sea growth during docking of the vessel. And preservation of propeeler using greese to be done during docking periods
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :-
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (a) Calibration of injector to be done
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (b) Caliberation of FIP & governor assembly to be carried out.
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (c) Lub oil sump to be drained,cleaned & new oil to be charged in sump.
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (d) Sump strainers/ filter to be renewed.
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (e) Fuel oil filter to be renewed.
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (f) Lub oil pressure gauge to be renewed.
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (g) Renewal of air inlet filter element of engine to be carried out.
1021 DD COMPRESSOR ENGINE,MAKE-KIRLOSKAR OIL ENGINE,MODEL-TAF1,SL. NO-20.1222/1002005 Following work to be carried :- (h) Engine to be painted post boxing up and proved for satisfactory perfomance.
ELECTRICAL WORK PACKAGE 2001 All electrical power components / spares like contactors, overload relays, etc are to to be sourced from Navy approved vendors. IMPORTANT NOTE:- Following points are applicable for all relevant DL's and shipyards/Firms to consider and quote accordingly. (a) Renewal of Items / Spares:- (i) Renewal of items / spares wherever mentioned in the QDL to be undertaken by shipyard / firm as per the sample / drawing / details provided by SS / COA / RMT. (ii) Shipyard / Firm should undertake the routines / overhaul of the equipment including the mandatory spares required for undertaking the same, irrespective of the spares mentioned in the mandatory spares list provided by ND(V). (iii) Further, the cost should include the degutting of existing item, supply of new item, fitment and proving of the system post renewal. Following 'As Fitted' drawings need to be prepared and handed over to ships staff (a) Foundations of new equipment (b) Electrical cabling (c) All As and A's including internals of control panel (Hull, Engineering & Electrical). (d) ABER replacement (Hull, Engineering & Electrical ).
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (a)MSB to be overhauled (includes defective swiches to be renwed, indication lamp to be renewed,perished control wiring to be renewed with crimping of proper lugs ,making sleeves to be put on control wiring and loose wirng to be tied with cable ties)
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (a)MSB to be overhauled (includes defective swiches to be renwed, indication lamp to be renewed,perished control wiring to be renewed with crimping of proper lugs ,making sleeves to be put on control wiring and loose wirng to be tied with cable ties) (iv) Replacement with new one of Emergey push Button Swich, type : Mushroom Head Push turn with 1NC contract,Model:HH55C1+HC61B2
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (a)MSB to be overhauled (includes defective swiches to be renwed, indication lamp to be renewed,perished control wiring to be renewed with crimping of proper lugs ,making sleeves to be put on control wiring and loose wirng to be tied with cable ties) (v) Replacement with new one of LED indication lamps fittings of different colors (Red 10,Yellow 05 ,Blue 05,green 10, white 05, Amber 05),Make: TEKNIC,Model :p2PLBRR240, input Supply 240VAC 50HZ
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (b)Replacement with new one of following MCCBs (Firm Not To Quote)
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (b)Replacement with new one of following MCCBs (i) Make : L &T Model:DN2-250 ,Rating 250A 3 pole, 1 Aux contact,+I trip alam, Shuunt Release 240V AC 50HZ, Thermal Setting 200-250 ,Magnetinc Setting:1500-2500
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (b)Replacement with new one of following MCCBs (ii) Make : L &T Model:DN2-250 ,Rating 250A 3 pole, 1 Aux contact,+I trip alam,with 240V AC 50Hz U/V release, Thermal Setting 200-250 ,Magnetinc Setting:1500-250071
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (b)Replacement with new one of following MCCBs (iv) Auxiliary Contactor ,Make -L&T, Model-MW0 , Coil Voltage : 240V AC 50Hz, with 2No+ 2NC contacts and Addon: 2NC
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. ( C ) Check &calibrate all parameters of insulation Monitoring Relay ,Make: selco ,Model :T3200
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (c) operating parameter of insulating monitoring Relay (i) Voltage Tolarance :+10-20% of undervoltage (ii) power Consumption : 2VA Max (iii) Frequency Range :45-65 Hz (iv) Operating Temperature Range :- -20+70 C (v) Contact rating :AC 2A, 380V ,250VA&DC110V,2A,150W (vi) dielectric :2500V, 50Hz (vii) Presetting 0-5M Ohm (viii) Accuracy signal :+/-5% (of preset valve) (ix) Instrument scale 0-5 M ohm (x) Instrument Resistance Max 100 Ohm
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (d) Replacement with new one of Insulation Monitoring Relay. Make: Selco, Model:T3200
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (e) Calibration of following meters,if found defective the same to be replaced
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (e) Calibration of following meters,if found defective the same to be replaced (i)Ammeter : 415V AC, Input Model CT operated, CT retio 250/1A, Accuracy class 1,Range 0-250A ,Red Mark at 195A, Size : 96x96mm, Gasket Required
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (e) Calibration of following meters,if found defective the same to be replaced (ii) KW meter : input Voltage 415 V AC, 50Hz, Accuracy Class :1 , Scale -90 degrees ,input Current 250/ 1A Range -20 -0-150KW(Dynemometric),Red Mark at 122 KW, Size: 96x96 mm, Gasket Required
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (e) Calibration of following meters,if found defective the same to be replaced (iii) Frequency Meter :Reed Type, input voltage 415VAC 50 Hz, Accuracy class 1, range 45-50-55 Hz Size :96x96 mm ,Gasket Required
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (e) Calibration of following meters,if found defective the same to be replaced (iv) Voltmeter :Range 0-500V AC, Red Mark 415V, Accuracy class 1, scale 90 degree,Vt ratio : Direct Input Size:96x96 mm, Gasket Required
2001 Eqpt/System:MAIN SWICH BOARD Make : L&T ,RATING: 415V,3PH,50HZ. (f) Rubber mat : Insulating Rubber Mat deteriorated. To be Renewed with high voltage Electrical rubber mat in front of MSB.(Thickness- 3mm) Make vardhaman model class c
2002 Eqpt/ System: Control panels: The following Control panel are to be overhauled &made operational.
2002 Eqpt/ System: Control panels: The following Control panel are to be overhauled &made operational. (a) Anchor windlass control panel (including master controller) 415V, 5.5 /11 Kw, 50 Hz. Double speed Make: Electronic control Corporation
2002 Eqpt/ System: Control panels: The following Control panel are to be overhauled &made operational. (b) Ventillation Group starter panel, Make : Electronic control Corporation , Rating :415V,3Ph,50Hz. And 230 V,1Ph, 50Hz Combined
2002 Eqpt/ System: Control panels: The following Control panel are to be overhauled &made operational. b(i) Repair/calibrate with new one of Solid State Over load Relay. Make:Semens,Model:3RB22/23 over load relays (screw connection)
2002 Eqpt/ System: Control panels: The following Control panel are to be overhauled &made operational. (c ) Boat Davit Control panel Rating : 415V,3Ph,50 Hz. 7.5 HP, Make : Electronic Control corporation
2003 Eqpt/ System: Transformer 21 KVA Make; Radiant Electronic 415V, 3Ph, 50Hz/230V,3ph ,50Hz
2003 Eqpt/ System: Transformer 21 KVA Make; Radiant Electronic 415V, 3Ph, 50Hz/230V,3ph ,50Hz (a) Carryout overhaul routines and proove them for satisfactory performance/ made operational
2003 Eqpt/ System: Transformer 21 KVA Make; Radiant Electronic 415V, 3Ph, 50Hz/230V,3ph ,50Hz (b) Clean it internaly , dust and moisture to be removed and to be painted outside with gray color
2003 Eqpt/ System: Transformer 21 KVA Make; Radiant Electronic 415V, 3Ph, 50Hz/230V,3ph ,50Hz (c) Renew the internal wiring of Transformer (in between the connectors to fuse units)
2004 Eqpt/ System: Straight Line Window Wiper & CVS Make : RAKME ENGINEERING , Size: Stroke 500mm ,Blade 600mm,Motor Rating: AC 230 V: 0.5 HP , 1 Ph
2004 Eqpt/ System: Straight Line Window Wiper & CVS Make : RAKME ENGINEERING , Size: Stroke 500mm ,Blade 600mm,Motor Rating: AC 230 V: 0.5 HP , 1 Ph (a) Overhaul the gear system and prove them fpr free movement /satisfactory performance
2004 Eqpt/ System: Straight Line Window Wiper & CVS Make : RAKME ENGINEERING , Size: Stroke 500mm ,Blade 600mm,Motor Rating: AC 230 V: 0.5 HP , 1 Ph (b)FW system line to be proved (dia 10mm,Cu-Ni)
2004 Eqpt/ System: Straight Line Window Wiper & CVS Make : RAKME ENGINEERING , Size: Stroke 500mm ,Blade 600mm,Motor Rating: AC 230 V: 0.5 HP , 1 Ph (c) Renew the Blades Including Rubber coambing
2004 Eqpt/ System: Straight Line Window Wiper & CVS Make : RAKME ENGINEERING , Size: Stroke 500mm ,Blade 600mm,Motor Rating: AC 230 V: 0.5 HP , 1 Ph (d) overhaul the CVS motor and prove it operational.
2004 Eqpt/ System: Straight Line Window Wiper & CVS Make : RAKME ENGINEERING , Size: Stroke 500mm ,Blade 600mm,Motor Rating: AC 230 V: 0.5 HP , 1 Ph (e) Machinery body to be bare metal and painted with one cote of primer and two coat of enamil paint
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc)
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) (a)Carryout routines mentioned below and prove them for satisfactory performance
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) a(i) Clean &Tighten the all connection with proper lugs,
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) a(ii) Check the functions of all fuse units, control cards, indication lamp &horn.
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) a(iii) If deffective repair them
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) a(iv)If un repairable than renew them.
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) (b) If control card found defective repair them
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) (c) Renew theLED indication lamps with holders
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) (e) Renw the Fuse Units screw type connectors
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) (f) check the circuits (Cables) in between the control panel & Navigational light fitting if there is any fault rectify them
2005 Eqpt/ System:Navigational Lighting panels(AC &DC) Make: Electronic Control Corporation 230V AC/24 V DC combined (including internal parts of control panel such as fuse, LED indication lamp, control PCBs , connectors etc) (g) Renew the cables (single core cable ,2mm sq) (incomming &outgoing) if they are pershed.
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings a(i)Navigational Light Fittings (AC &DC)Make :M/S Arvin industries 230 V for AC, 24V fot DC(Two ties set) Red -03,Green-01, White-04
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings a(ii) Renew the AC navigational bulbs 230V,60w
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings a(iii) Renew the DC navigational bulbs 24V,60w
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings a(iv)Renew weather deck light fittings 230V,60w
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings a(v)Renew Watertight U Glass light fitting incandeescent lamp fittings. 230V,60W
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings a(vi) Replace 230V,60W lamo with 230V 11 W LED lamp, Make: syska
2006 Eqpt/ System: Light fittings. (a)Renew following light fittings a(vii) Replace the 230V 200W reflector light fitting with 230V 100 W LED light fitting
2006 Eqpt/ System: Light fittings. (b) Repair and overhaul following light fittings
2006 Eqpt/ System: Light fittings. (b) Repair and overhaul following light fittings b(i) Search light fitting 230V,1000W
2006 Eqpt/ System: Light fittings. (b) Repair and overhaul following light fittings b(ii)Renew Twin tube CFL lamp 230V,11W
2006 Eqpt/ System: Light fittings. (b) Repair and overhaul following light fittings b(iii) Renew emenrgency light LED lamp (operating range of voltage 13V-24V) DC ,6W
2006 Eqpt/ System: Light fittings. (c) Convert all 230V,2x20W tubelight fitting with 230V, 2x20W LED tubelight fitting
2006 Eqpt/ System: Light fittings. (d) Provide the 20W 230V LED tubelights,Make:Philips/Siska
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved)
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) (a) D/G (port &stbd) AV Alaram panel System including control wiring to be completely over hauled, calibrated and proved for satifactory opration.
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) (b) Repair of dynamo to be carried out 24V DC Make :Iucas TVS
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) (c) Overhauling of self starter motor 24V DC, Make : Iucas TVS
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) (d)Repair of IEVR units,
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) (e)calibration of following cutouts of DA
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) e(i) Fresh Water temperature cut outs for Alarm Set point 92 degree c and tripping at Set point 97 degrees C
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) e(ii) Lub oil temp cutout for alarm set point 97 degrees C and trip at 105 degree C
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) e(iii)Lub oil pressure cut out for Alarm set point 1.5 KG/sq CM and Tripping set point 0.5 kg/sq cm
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) e(iv) Over Speed Cut out for tripping set point 1650 RPM
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) e(V) Over temperature of Alternator for tripping set point 70 degreeC
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) (f) Renew the following sensors/relays if found defective
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) f(i) Temperature sensors (0 to 200) DANFOSS TEMPERATURE SENSOR
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) f(ii)Pressure sensors (0 to 10) DANFOSS PRESSURE TRANSMITTER
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) f(iii) Magnetic Switch Contactors relays 24V DC, Make: Cummins / Kirloskar
2007 Eqpt/System: D/G (port &stbd) Alarm panel system Make : KIRLOSKAR AND CROMPTON,Type :176 BHP (OEM to be in volved) f(iv) Digital RPM meter operating voltage 24V DC
2008 Eqpt/System: CO2 Existinguishing system Control panel. Make :SHM Shipcare, kolkata
2008 Eqpt/System: CO2 Existinguishing system Control panel. Make :SHM Shipcare, kolkata (a) Carryout complete overhaul of the CO2 control panel including renewal of defective parts/componenets(Such as indication LED, alarm hooter, control PCB's fuse holders, fuses, connection terminals, perished wiring etc) and prove it for satisfactory performance.
2008 Eqpt/System: CO2 Existinguishing system Control panel. Make :SHM Shipcare, kolkata (b) Overhaul the Motorised Siren & Flasher make: KHERAJ Type - Horozontal Single mounting 24V, DC,75W, 6000RPM, range 800 mtrs
2008 Eqpt/System: CO2 Existinguishing system Control panel. Make :SHM Shipcare, kolkata (c) Limit Switches(05) and solenoid valves relays(05) to be checked, calibrated to be proved for satisfactory operation
2008 Eqpt/System: CO2 Existinguishing system Control panel. Make :SHM Shipcare, kolkata (d) Check, calibrate & set to their set point of heat detectors and smoke detectors, Type: Nittan uk ns -DhG1 set point.
2008 Eqpt/System: CO2 Existinguishing system Control panel. Make :SHM Shipcare, kolkata (e) Check, calibrate & set to their set point of pressure operated switch - 1no Make: Ginger kerr Working pressure 3-150bar
2008 Eqpt/System: CO2 Existinguishing system Control panel. Make :SHM Shipcare, kolkata (f) Repair Heat detectors and smoke detectors, Type:Nittan uk ns-DhG1 set point 58°C
2009 Eqpt/System: Shore Supply Box: Make : Electronic control corporation rating:100 amps,415V,3ph, 50Hz.
2009 Eqpt/System: Shore Supply Box: Make : Electronic control corporation rating:100 amps,415V,3ph, 50Hz. (a) Carryout complete overhaul of the shore supply control panel prove it for satisfactory performance
2009 Eqpt/System: Shore Supply Box: Make : Electronic control corporation rating:100 amps,415V,3ph, 50Hz. (b) Renew the indication lamps with holders(Red,Yellow, Blue)
2009 Eqpt/System: Shore Supply Box: Make : Electronic control corporation rating:100 amps,415V,3ph, 50Hz. (c) Renewal of shore supply panel plastic glass size 24"X12"
2009 Eqpt/System: Shore Supply Box: Make : Electronic control corporation rating:100 amps,415V,3ph, 50Hz. (d) Mechanical cleaning of supply panel board & painted with one cote of primer and two coat of powder coating (original colour) from inside any gray color from outside
2010 Eqpt/System: SMF Lead Acid Batteries. Make: Exide, 200AH, 12V
2010 Eqpt/System: SMF Lead Acid Batteries. Make: Exide, 200AH, 12V (a) Renew the maintainence free battery
2010 Eqpt/System: SMF Lead Acid Batteries. Make: Exide, 200AH, 12V (b) Clean & tighten the all connections with proper lugs, ferrules & connectors
2010 Eqpt/System: SMF Lead Acid Batteries. Make: Exide, 200AH, 12V (c) Renew the battery connectors(12+ive and 12-ve)
2010 Eqpt/System: SMF Lead Acid Batteries. Make: Exide, 200AH, 12V (d) Renew the short link cable (50sq.mm multi stand copper cables, length 0.5 mtr) conncetors
2010 Eqpt/System: SMF Lead Acid Batteries. Make: Exide, 200AH, 12V (e) Renew the parallel link cable (50sq.mm multi stand copper cables length 0.5mtr) with connectors in emergency batteries bank
2011 Eqpt/System: Submersible pump& lts starter, Make:- Mody, capacity 20 TPH Below mentioned routine to be carried out(Firm Not To Quote)
2011 Eqpt/System: Submersible pump& lts starter, Make:- Mody, capacity 20 TPH Below mentioned routine to be carried out (a) Carryout complete overhaul routines and prove them for satisfactory performance/Made operational
2011 Eqpt/System: Submersible pump& lts starter, Make:- Mody, capacity 20 TPH Below mentioned routine to be carried out (b) Check & calibrate the OLRs/SPPs/Timers/MCBs as per their ratings if defective replace them
2011 Eqpt/System: Submersible pump& lts starter, Make:- Mody, capacity 20 TPH Below mentioned routine to be carried out (c) Check all the fuse units if defective replace them
2011 Eqpt/System: Submersible pump& lts starter, Make:- Mody, capacity 20 TPH Below mentioned routine to be carried out (d) Renew the Neoprene Rubber Gasket for water tight purpose - for door
2012 Eqpt/ System: Transrectifier cum Battery chargering Units Make: Radient Electronics Input: 415V,3ph, 50Hz. Output 22V to 29V DC, 63A
2012 Eqpt/ System: Transrectifier cum Battery chargering Units Make: Radient Electronics Input: 415V,3ph, 50Hz. Output 22V to 29V DC, 63A Carryout complete overhaul routines and proove them for satisfactory performance/Made operational. Defective componenets tp be replaced with new one(indication lamp, fuse carrier, fuses,connector terminals, lugs, perished control wring)
2013 Eqpt /System: Sewage Treatment Plant; Make/Model :- EXCELTEC OMNIPURE 7 ME, Capacity : 1200 Gallon/day.
2013 Eqpt /System: Sewage Treatment Plant; Make/Model :- EXCELTEC OMNIPURE 7 ME, Capacity : 1200 Gallon/day. (a) Overhaul control panel fitted onboard and prove it for satisfactory performance. All contactor, timer, overload relay, PCB is to be overhauled and proved for satisfactory performance.
2013 Eqpt /System: Sewage Treatment Plant; Make/Model :- EXCELTEC OMNIPURE 7 ME, Capacity : 1200 Gallon/day. (b) Overhaul motor and prove it for satisfactory performance.
2013 Eqpt /System: Sewage Treatment Plant; Make/Model :- EXCELTEC OMNIPURE 7 ME, Capacity : 1200 Gallon/day. (c) Perished wiring of control panel is to be changed. (Single core, 1sqmm)
2013 Eqpt /System: Sewage Treatment Plant; Make/Model :- EXCELTEC OMNIPURE 7 ME, Capacity : 1200 Gallon/day. (d) All indication lamp is to be renewed.
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used.
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (a) Anchor Windlass motor double speed motor415V 3Ph, 50Hz, 5.5/11 KW
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (b) Boat Dvit Hoist/ Lowering motor, 415V,3Ph, 50 Hz, 7.5 Hp
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (c ) Dirty oil pump motor,415 V, 3 PH, 50 HZ, 1.5 HP
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (d) Fuel Oil Transfer Pump Motor 415 V, 3 PH, 50 HZ, 1.1 KW
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (e) Air Compressor Motor 415 V, 3 PH, 50 HZ, 3.7 KW
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (f) Fuel (HSD) Cargo Pump Motor 415 V, 3 PH, 50 HZ, 15 HP
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (g) Fresh Water Cargo Pump 415 V, 3 PH, 50 HZ, 12.5 HP
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (h) Fresh Water Pump Motor 415 V, 3 PH, 50 HZ, 1.5 HP
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (j) Main Engine Primming Pump Motor 415 V, 3 PH, 50 HZ, 1 HP
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (k) Steering Gear Compartment Supply Fan Motor 415 V, 3 PH, 50 HZ, 0.37 W
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (l) Pump Room Supply/ Exhaust Fan Motor 415 V, 3 PH, 50 HZ, 0.37 W
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (m) Engine Room Supply Fan Motor 415 V, 3 PH, 50 HZ, 5.5 KW
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (n) Engine Room Exhaust Fan Motor 415 V, 3 PH, 50 HZ, 5.5KW
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (p)Galley Exhaust Fan Motor 230 V, 1 PH, 50HZ, 157W
2014 Eqpt/System: Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. Only zz standard bearing (SKF/FAG) is to be used. (q) CO2 Room Exhaust Fan Motor 230 V, 1 PH, 50 HZ, 157 W
2015 Eqpt /System:Motor Starter, (DOL/ START - DELTA) to be overhauled completely and prove them for satisfactory performance. Overhauling includes renewal of indication lamp, conector terminals, lugs, perished internal wiring there ever as required.
2015 Eqpt /System:Motor Starter, (a) Group starter control panel for ventilation rating: 415V, 3 PH, 50HZ, AND 230 V, 1 PH, 50 HZ, COMBINED MAKE: ELECTRONIC CONTROL CORPERATION
2015 Eqpt /System:Motor Starter, (a)Starter for Dirty oil pump motor, 415 V, 3 PH, 50 HZ, 1.1 KW
2015 Eqpt /System:Motor Starter, (b)Starter for Air compressor motor, 415 V, 3 PH, 50 HZ, 3.7 KW
2015 Eqpt /System:Motor Starter, (c)Starter for Bilges/GS Pump motor, 415 V, 3 PH, 50 HZ, 7.5 KW
2015 Eqpt /System:Motor Starter, (d)Starter for Fuel Cargo pump motor, 415 V, 3 PH, 50 HZ, 15 HP
2015 Eqpt /System:Motor Starter, (e)Starter for Steering Gear motor, 415 V, 3 PH, 50 HZ, 15 HP
2015 Eqpt /System:Motor Starter, (f)Starter for Fresh Water Cargo Pump 415 V, 3 PH, 50 HZ, 12.5 HP
2015 Eqpt /System:Motor Starter, (g)Starter for AVCAT Transfer Pump motor, 415 V, 3 PH, 50 HZ, 10 HP
2015 Eqpt /System:Motor Starter, (h)Starter for Fresh Water Cargo Pump 415 V, 3 PH, 50 HZ, 1.5 HP
2015 Eqpt /System:Motor Starter, (j)Starter for Main Engine Primming Pump motor, 415 V, 3 PH, 50 HZ, 1 HP
2015 Eqpt /System:Motor Starter, (k) Starter for Fuel Oil Seperator motor, 415 V, 3 PH, 50 HZ, 5 HP
2016 EQUIPMENT : SOUND POWER TELEPHONE SYSTEM(Firm Not To Quote)
2016 EQUIPMENT : SOUND POWER TELEPHONE SYSTEM (a) Carryout complete overhauling of sound power telephone system. Including repair of telephone handset mic and speaker. Prove the system for satisfectory performance (total SPT Position -10)
2017 Air compressor control panel (Firm Not To Quote)
2017 Air compressor control panel (a) Air compressor control panel change over switch & other panels Bodies perished, to be renwed/manufactured as per dianentions (12" X 12" X 12")
2017 Air compressor control panel (b) Magnetic starter to check for proper operation,repair/renew defective items.
2017 Air compressor control panel (c ) Pressure switch to calibrated
2017 Air compressor control panel (d ) Starter Coil to repaired
2018 Eqpt/System:Refrigerator (d.door). Repair the refrigerators of double door 350ltrs,5star LG invertor model
2019 Eqpt/System:Deep Freezer Repair/overhauling of deep freezers 200ltrs (presently working)
2020 Eqpt/System:Hot Water Boiler Make:Spherehot (Brand Name) Manufactured by Kantilal Chinilal & sons applaince pvt ltd.,surat,india Overhauling of hot water boiler along with control panel 20ltrs 230V
2021 Eqpt/System: Cooking Range with 2 hot plates with oven;430V 3ph 5kw. Make:Spherehot (Brand Name) Manufactured by Kantilal Chinilal & sons applaince pvt ltd.,surat,india (Firm Not To Quote)
2021 Eqpt/System: Cooking Range with 2 hot plates with oven;430V 3ph 5kw. Make:Spherehot (Brand Name) Manufactured by Kantilal Chinilal & sons applaince pvt ltd.,surat,india (a) Carryout complete overhaul routines and proove them for satisfactory performance / Made operational
2021 Eqpt/System: Cooking Range with 2 hot plates with oven;430V 3ph 5kw. Make:Spherehot (Brand Name) Manufactured by Kantilal Chinilal & sons applaince pvt ltd.,surat,india (b) Heating elements found defective. Renew the Heating elements ("W" type) 430V,1500W
2022 Eqpt/System:split A/Cs Carryout overhauling the 7 in nos spilt A/Cs at various locations, 1.5 ton,Make:Carrier
2022 Eqpt/System:split A/Cs (a) Carry out servicing and gas charging of splict AC fitted.Renew if found BER . ( A/C capacity 1.5 T)
MANDATORY SPARES of POSHAK CUMMINS MAIN ENGINE GASKET L.O. COOLER 121779
GASKET OIL COOLER CONNECT 68210
ELEMENT FUEL FILTER 3166555
ELEMENT SUPER LO BYPASS FILTER 3873576
INJECTOR AR 3239804
VALVE SOLENOID AR 3240573
ELEMENT L.O. FILTER 3166554
ELEMENT AIR FILTER
O RING 212161
Mandatory Spares of POSHAK KIRLOSKAR DG ELEMENT FUEL FILTER 4H.333.03.0.00
BENZO BOLT M 14x15 50.504.04.000
HEAT EXCHANGER 4H.465.16.0.PR
RAW WATER PUMP 4H.465.19.0.PR
WATER PUMP SUB ASSEMBLY 4H.052.40.0.00
SPEED CONTROL UNIT ESD 5221 F6.614.02.0.00
FUEL LEAK OFF ASSEMBLY 6H.1124.30.0.00
LUB OIL COOLER ASSEMBLY 6H.113.60.0.00
ELEMENT L.O. FILTER 03.040.19.0.00
EXPANSION TANK 6H.466.28.0.00
FUEL PIPE 6H.081.02.0.00
FUEL PIPE 6H.081.03.0.00
ELEMENT AIR FILTER 03.061.40.0.00
MAGNETIC PICK UP 46.179.05.0.00
STARTER (SM130PE) F6.028.01.0.00
FUEL FILTER 48.117.10.0.00
PRIMARY FILTER ELEMENT F6.504.34.0.00
Electronic governor aseembly F6.886.10.0.00
Link for ADC C225 GS F6.741.02.0.00
Mandatary Spares of Ingersoll Rand Air Compressor ( Model 251) PRIORITY VALVE 70241336
FILTER INLET COMPLETE 94495256
ELEMENT FILTER 70234737
VALVE SAFETY 70239801
PISTON AIR 30292429
SET RING 32194276
GASKET FLANGE 30294227
SET RING 37138229
PISTON AIR 30215412
DRY DOCK AND ALLIED SERVICES WORK PACKAGE (A) Docking and undocking charges (Both Versions) Firm not to quote. Docking and Undocking will be done by Navy in Navy Permises i.e ND(V) /slipway.
(B) Dock blocks preparation & laying out as per docking plan Firm not to quote. Job will be done by Navy
Dock hire charges for an estimated duration of 60 Days as per OCR Firm not to quote. Dry Dock facility will provided by Navy in Navy Permises i.e ND(v) /slipway.
Wet basin/alongside hire charges for the remaining duration (i.e. total refit duration of – 60 days docking period) Firm not to quote. Dry Dock facility will will provided by Navy in Navy Permises
Provision of sufficient lighting for duty staff Firm to quote.
Quote for maintenance of two in no. fire lines for the refit duration . Firm to quote.
Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is less Firm to quote.
Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 2000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals. Note:- firms to quote.
Mail man services (02 Nos) for entire refit duration (one for user department and one for planning / Co-ordinating department ) to be provided for 10 Hrs per day Firm to quote.
QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS. Firm not to quote. Services will be provided by ND(V)/QC
ASHA ENGINEERING WORKS
ULTRA MARINE
Sadhav Offshore Engineering Company
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .