Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.9 LAccepted-AOC RUDRAPRAYAG | RUDRA PRAYAG | UTTARAKHAND | 246141 | L1 | Accepted-AOC QUALIFIED | |
| 2 | L2₹69.3 L+₹5.3 L (8.33%)Rejected-Finance 2 FRIENDS ENCLAVE SHAH NAGAR DEHRADUN | L2 | Rejected-Finance NOT QUALIFIED | |
| 3 | L3₹72.2 L+₹8.3 L (13.0%)Rejected-Finance BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | L3 | Rejected-Finance NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
5 Aug 2024, 12:00 pmClosed
SE EDC KARANPRAYAG
SE EDC KARANPRAYAG, EDC KARANPRAYAG
Replacement of ACSR weasel Conductor by Aerial Bunch Cable at village Nakhu, Rampur, Naugaon, Kholi, Pata and Nawasu on Semi-Turnkey Basis under 33/11 KV S/s Rudraprayag under EDD Rudraprayag against Capital(S.I.) Head.
2024_UPCL4_73761_1
10/EDC(K)/2024-25
Open Tender
Repair and Maintenance Works
Turn-key
180 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹5,900
EE EDD GOPESHWAR
₹1.3 L
25 Sept 2024
20 Jul 2024
6 Aug 2024
21 Jul 2024
5 Aug 2024
21 Jul 2024
SUPPLY OF MATERIAL PORTION
DEAD END CLAMP WITH I HOOK AB CABLE SP-21
MS HALF CLAMP FOR LT D.B SP-21 WITH N/B
PG Clamp 25 to 25 mm line to line
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-10 WITH NUT & BOLT
SUSPENSION CLAMP WITH I HOOK
LT BARE N.CONN. PG CLAMP FOR DB 50-50MM²
IPC 70/35 sqmm For line to line tapping
IPC 70 sqmm to 25sqmm for Dist. box
Head shrink type end caps for LT ABC
1Ph. LT Dist. Box, inbuilt panel lock
3Ph. LT Dist. Box, inbuilt panel lock
LT XLPE Cable 1x35 sqmm
LT XLPE AB CABLE 3X70+1X50 SQ.MM.
LT AB Cable 3x35+1x25 sqmm
LUGS O TYPE
LABOUR PORTION
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-21 POLE
MUFFING OF POLE
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 2 P 3 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
PAINTING OF SP-10 POLE
PAINTING OF SP-21/23 POLE
LOPPING & CHOPPINGOF TREE BRANCHES
CARTAGE SP-10 POLE, 150-200KM
CARTAGE SP-21/23 POLE, 150-200KM
CARTAGE OF PETTY MATERIAL,150-200KM
HEADLOAD CARTAGE SP-10 POLE(1-3 KM)
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
DISCONNECTION & RECONNECTION OF CONSUMER
LAYING OF LT AB CABLE 3X70+1X50 SQMM
LAYING OF LT AB CABLE 3X35+1X25 SQMM
DISMANTLING AND REFIXING OF DIST. BOX
LAYING & Fixing 1x35sqmm XLPE CABLE
Back Carriage of Scrap Material
ERECTION OF EARTHING ROD
UTTARANCHAL FORGINGS INDUSTRY
Aarna Electrical And Co
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .