Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 01 HAZRATBAL SRINAGAR SRINAGAR JAMMU KASHMIR 190006 | SRINAGAR | JAMMU AND KASHMIR | 190006 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
Closing Date
3 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer Generation Div LJHP Gantamulla Bla
Cleaning Of LGB Thrust Bearing Coolers and Hot Air Coolers Heat Exchangers of Unit 2nd with allied Works At LJHP Power House.
2021_SPDC_149667_1
Short Term eNIT No 20 of 2021-22 dated 23.11.2021
Open Tender
Electrical and Maintenance Works
Item Rate
6 days
LJHP Power House
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
Executive Engineer
Exempted
4 Dec 2021
23 Nov 2021
4 Dec 2021
23 Nov 2021
3 Dec 2021
23 Nov 2021
180 days
Amount
5mm Neoprene Rubber (full roll)
SS Stud bolt 10x50 (in mm)
SS Stud bolt 12x50 (in mm)
SS Stud bolt 08x50 (in mm)
Old Sarees
White cotton cloth
Lamp 100W
MT Oil
HS Diesel
Petrol
M Seal
Wool Fellt/Gaskets
Complete Job of Dismantling, Cleaning & Reinstalling of LGB/Thrust coolers/Heat Exchangers with Hot Air coolers in Unit II by way of stopping of cooling, draining of lube oil from thrust bearing and collecting them in empty drums/barrels (18 drums, approx.). Opening of all associated studs, bolts & nuts of cooling water pipeline for thrust bearing & also for Hot air coolers. Before dismantling and shifting of 6 No’s (complete set) of Thrust Coolers top chequer plate is removed and all 08 No’s of Hot Air coolers from stator body are removed and after that 06 No's of thrust cooler from the LGB section are to be dismantled one by one and then shifting of same to the service bay. Opening cover plates of coolers to inspect tubes. Complete Cleaning of all 6 No’s of Thrust coolers & 08 No’s of Hot Air coolers one by one by jet stream, rods, etc. for removal of sludge, opening of blocked tubes, etc in the Cu-Ni Tubes. After that covers are fitted back with new gasket from both sides & testing is to be done by hand pressure pump as per testing standard directions of coolers. Installing & connecting the pipes & coolers one by one to their original positions with new 5mm neoprene gaskets so that no leakage is permitted. Installations of all thrust coolers to LGB section & tighten all associated nuts one by one. Connecting cooling pipes to the coolers along with new gasket. Pouring of lube oil back into the oil bath of thrust bearing. Fixing of all top chequer plate back to its original location. Removing of all material from the site & cleaning of machine so as to make unit ready to use. Opening of cooling valves & ensuring no leakage persists.
LIGHT ENTERPRISES
BHAT CONSTRUCTIONS
M/S NAYEEM FAROOQ SOFI
stage.html
html • 0.02 MB
finance_326111.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .